HomeMy WebLinkAbout20150610 Ver 1_Inspection_20150929Wetland Inspection Report
Project Num: 20150610 Version: 1
Project Name: Proposed Ash Removal by Rail,
County: Rockingham
Location: Proposed Ash Removal by Rail, Track Widening
Latitude: +36° 29' 51"
SW Plan Location
Site Owner Name Duke Power
Inspection Date: 9/29/2015
Reason for Inspection Routine
Inspection Type: Records /File Review (non -DOT)
Status: Issued
Project Type: Railroad work
Region: Winston -Salem
Longitude: -78° 42'46"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Sue L Homewood Phone: 336- 776 -9694
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated /non -404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
page: 1
Site Number: 20150610 Owner: Wylie, Robert
Inspection Date: 9/29/2015 Inspection Type: Records /File Review (non -DOT)
Reason for Visit:
Routine
Permit (401 WQCI
Yes
No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
❑
❑
❑
0
Are the culverts and /or filled areas installed properly?
❑
❑
❑
0
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
0
❑
❑
❑
Comment: Condition #4 of approval reauired a pre- construction meetina to be held on -site. Due to weather and safetv
conditions the meetina was held indoors and the site was not reviewed. Permit conditions were
discussed. The contractor will dewater the channel parallel to the fill slope immediatelv below Site 2.
After culvert at Site 2 is installed (prior to iob completion) thev will contact DWR to review whether anv
work is needed alona the channel below the new culvert. At that time dewaterina will be reviewed and it
will be determined if it should be maintained while fill slope is completed. Duke will also submit email
reauestina exemption from culvert burial condition.