Loading...
HomeMy WebLinkAbout20150610 Ver 1_Inspection_20150929Wetland Inspection Report Project Num: 20150610 Version: 1 Project Name: Proposed Ash Removal by Rail, County: Rockingham Location: Proposed Ash Removal by Rail, Track Widening Latitude: +36° 29' 51" SW Plan Location Site Owner Name Duke Power Inspection Date: 9/29/2015 Reason for Inspection Routine Inspection Type: Records /File Review (non -DOT) Status: Issued Project Type: Railroad work Region: Winston -Salem Longitude: -78° 42'46" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Sue L Homewood Phone: 336- 776 -9694 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20150610 Owner: Wylie, Robert Inspection Date: 9/29/2015 Inspection Type: Records /File Review (non -DOT) Reason for Visit: Routine Permit (401 WQCI Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ❑ ❑ ❑ 0 Are the culverts and /or filled areas installed properly? ❑ ❑ ❑ 0 Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: Condition #4 of approval reauired a pre- construction meetina to be held on -site. Due to weather and safetv conditions the meetina was held indoors and the site was not reviewed. Permit conditions were discussed. The contractor will dewater the channel parallel to the fill slope immediatelv below Site 2. After culvert at Site 2 is installed (prior to iob completion) thev will contact DWR to review whether anv work is needed alona the channel below the new culvert. At that time dewaterina will be reviewed and it will be determined if it should be maintained while fill slope is completed. Duke will also submit email reauestina exemption from culvert burial condition. page: 2