Loading...
HomeMy WebLinkAbout20231404 Ver 1_CMDF_Three Seas Legacy Gideon Creek Marina_NCWRC_20240126_DAMAGED North Carolina Wildlife Resources Commission 9 Cameron Ingram, Executive Director MEMORANDUM TO: Division of Coastal Management North Carolina Department of Environmental Quality FROM: Maria T. Dunn, Coastal Coordinator Habitat Conservation Division DATE: January 26, 2024 SUBJECT: CAMA Dredge/Fill Permit Application for Three Seas Legacy(Gideon Creek Marina), Pamlico County,North Carolina. Biologists with the North Carolina Wildlife Resources Commission(NCWRC)reviewed the permit application with regard to impacts on fish and wildlife resources. The project site is located at 4146 Orchard Creek Rd in Oriental,NC adjacent to Gideon Creek. Our comments are provided in accordance with provisions of the Coastal Area Management Act(G.S. 113A-100 through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended,the Endangered Species Act of 1973, as amended(16 U.S.C. 1531 et seq.),the Fish and Wildlife Coordination Act(48 Stat. 401, as amended; 16 U.S.C. 661 et seq.),the Magnuson-Stevens Fishery Conservation and Management Act(FCMA), as amended(16 U.S.C. 1801 et seq.), and the Migratory Bird Treaty Act(16 U.S.C. 703-712 et seq.). The site has previously operated as Gideon Creek Marina and Fulcher's Seafood. The applicant proposes to remove 1,917 ft2 of a derelict dock and two submerged vessels on Tract 5 of the facility. The excavation of vessels removed by a long reach excavator will disturb 450 ft2 of bottom sediment. The vessels will be placed on the parking lot until stripped and moved to the landfill.New water dependent construction will include a travel lift, staging pier, 10 non-formulized slips, and the grading of the existing parking lot. The pier will be 6' by 310' and will mirror the contour of the shoreline. The 10-slips will be positioned on the east side of the pier to provide transient use for the travel lift. The upland existing gravel parking on Tracts 1-4 will be graded. Gideon Creek is classified SA HQW NSW by the Environmental Management Commission, is subject to the NC Division of Water Resources (NCDWR)Neuse Basin Buffer Rules, and is designated a primary nursery area(PNA)by the NC Division of Marine Fisheries (NCDMF) The NCWRC has reviewed the current permit application and believes there is insufficient information to adequately assess impacts the proposal will have on environmental resources. Our agency has reviewed, commented, conducted site visits, and participated in numerous scoping meetings on this property since Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh,NC 27699-1721 Telephone: (919)707-0220 • Fax: (919) 707-0028 Page 2 2005. Each time concerns were stated with regard to impacts to the PNA environment. PNAs are defined as those areas inhabited by the embryonic,larval or juvenile life stages of marine or estuarine fish or crustacean species due to favorable physical, chemical or biological factors. As a designated PNA, this creek provides an important rearing area for this variety of estuarine fishes and invertebrates that need relatively undisturbed habitats. Therefore, bottom disturbance and introduction of chronic disturbances or pollutants are of great concern. Previous proposals included dredging. This received significant concerns and objections from state and federal agencies. The NCWRC is pleased the applicant is not pursuing dredging in this current proposal. However, during the more recent proposal review and scoping meetings, additional information with regard to the services conducted on site, including wastewater collection and treatment,was requested by several agencies. This information does not appear to be within the information of this permit application. Therefore, the NCWRC requests no permits be issued until additional information regarding the use of the site and how marine maintenance activities will be conducted and waste materials managed is submitted. A NPDES permit is likely needed. While discussed in the scoping meetings, minimal information on the travel lift, size of vessels, and operation/maintenance was provided in the permit application. This information aids in the assessment of secondary and cumulative impacts for the proposal. The NCWRC has previously submitted substantial concerns when the capacity of travel-lift tonnage was increased above the original 2005 proposed 50-ton travel-lift as larger vessels may scrape the bottom as they traverse the creek and its more shallow water areas. Additional information detailing the removal of vessels and means to avoid surface water contamination from that activity is also requested. Due to the sensitive nature of PNA habitats, if any permits are issued,no in-water work should be conducted between April 1 —September 30 of any year. We appreciate the opportunity to review and comment on this permit application and look forward to any forthcoming information. If you need further assistance or additional information,please contact me at maria.dunngncwildlife.org or(252)495-5554.