Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0031506_Response Letter_20240109
Orange Water and Sewer Authority Our community's trusted partner for clean water and environmental protection. January 3, 2024 Vanessa E. Manuel Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ 1628 Mail Service Center Raleigh, NC 27699-1628 NC L%ep; u, Jtv:ru; .'ial Quajity JAN 0 9 ?024 iRaleigh t2egia!lal 0,Tice Re: Compliance Inspection Report OWASA Mason Farm WWTP Non -discharge Permit No. WQ0031506 Response to General Conditions (Section VI) Item #14 Dear Ms. Manuel: The Orange Water and Sewer Authority (OWASA) is in receipt of the subject Compliance Inspection Report dated November 29, 2023, and received on December 8, 2023, requesting the facility report the required flow data for the reclaimed water system on PPI-003 of the Non -discharge Monitoring Report (See Attachment 1: Section VI Item #14). We have been previously reporting the required flow data on page PPI-01 (See Attachment 2). Per DEQ's request, we have modified PPI-03 to have the monthly reclaimed water total flow included to eliminate any violations (See Attachment 3). All recently submitted or resubmitted NDMRs have included total monthly reclaimed water flow on PPI-03. Thank you for your guidance and support working through this process. If you have any questions or need any additional information, please do not hesitate to contact me or Wilmer Lawson, Wastewater Treatment and Biosolids Recycling Manager, at wlawson@owasa.ore or (919) 537-4351. Sincerely, a Todd Taylor, P.E. Executive Director Attachments: 1. Compliance Inspection 2. Previous NDMR PPI-01 Example 3. Modified NDMR PPI-03 CC: Mary Darr, P.E., General Manager of Operations Wilmer Lawson, Wastewater Treatment and Biosolids Recycling Manager Travis Rich, Operations Supervisor Ronnie Weed, Laboratory Supervisor 400 Jones Ferry Road, Carrboro, NC 27510 lO 919-968-4421 C) info@owasa.org © @OWASA_NC 0 www.owasa.org Response to General Conditions (Section VI) Item 14 Non -discharge Permit No. WQ0031506 January 3, 2024 Page 2 Attachment 1 General Conditions (Section VI): 14. The facility continues to be maintained by OWASA, and annual fees have been paid. No enforcements have been reported in the past five years. However, violations for missing PPI-003 have been occurring. A review of the monitoring reports for 2023, indicate the data that is required on PPI-003 is reported on PPI-001. DEQ requests that the facility report the required data on PPI-003 in order to eliminate the violations. Response to General Conditions (Section VI) Item 14 Attachment 2 Non -discharge Permit No. WQ0031506 January 3, 2024 M_ licit; u.....,vuu::::2: 31 L�u::Gty Page 3 119 I'I�■���� 9�II�INISI Ell Response to General Conditions (Section VI) Item 14 Non -discharge Permit No. WQ0031506 January 3, 2024 Page 4 Attachment 3 F:TtW &P tntal vnlajw� nf rvV?hTvf d! 18 I� d� I