Loading...
HomeMy WebLinkAboutNCC240087_Site Plan or Location Map_20240126 PROPERTY INFORMATION: ./ r \ \ \ / \ PARCEL ID NUMBER:5899-22-5743.000 w \ \ ZONING:R520 \ \ ACREAGE:3.249. \ Z_0 \ — \ PROPERTY OWNER/DEVELOPER: 0. } • 1 BRUCE HENRY,SR.S LVDIA HENRY > • \ 2048 BETHANIA RURAL HALL ROAD 0 • CC p W 48 TONBET SALEM,NC RURAL 108 HALL „„p.• N ix PHONE:(336)922-3433 0 U • / A /// \ EMAIL:LydiaHenry12@gmail.com = Eo • \ _� • ```�. : 3 of _ — �QQ/j ENGINEER: i ` n J Ci /W/ / / EMAIL,SCAUSEV@ALLIED-ENGSURV.COM , ' z f fa cam^.r N LYI NE`PPRQ\ PSB°61W EIP \ Ltnoalsi rnc2 Q '§ . N rn c \. .\\\. WNI P E0. W// . \ O nZ o>c� R /� 1�� / Ge \ VICINITY MAP / / 1'1 W SR 1464Drv � :�:!li 11111 �� GHP\N`\NKFEN \ `\; 'o AAl 0O \ NOT TO SCALE cH - ��" s"" N- I \ eli9 FIRM LICENSE C-1891 ._...„}-- ____ ,........- _____N'i MONK 80P N6 Zg454 �/ T PP O �/ �•�•Z `I \ �00\ /Po / p\stU BEp um \ [ �Z� \ I 9a y� �. ,``qN.CAR O , , 1 G� \ ;•A7a1 \ \ / �•/� / QHO \N FEN I s�2\ QI'�G � :' A,- r' 1d IO / OHU _\AN UNK I I I \ \ I l E. ` 19701 I GRAVE! i� / /OHU/ // �� I O, � ��,cmime (n \/ �:�5�. )NF- Cy`�.`' fP / oH1d� I I \ ; I , t, % ,otj�-MCPV o'‘ \0H I / \ •*MCI, Ni EIP / ems _ / I / I \ 'A• \ I ti TES PP No z • ,..\—�]/ _,✓-2 I / / \ II \ \ \ I I (\ \,TO.y\\\ \ OA NEW TEMPORARY CONSTRUCTION ENTRANCKEY E/EXIT.T.USE EXISTING GRAVEL TO SUPPLEMENT RIP-RAP. O ,/' rQ�/r/� ( I II II \ \ \\ \ 1 ( \ `y('\\ OB NEW TEMPORARY SEDIMENT FENCE. � � /•J 1\/ I \ \ \ \ \ \,,,,,,,, \\ O NEW TEMPORARY SILT FENCE OUTLET. ' pI \ t'6` D NEW TEMPORARY DIVERSION BERM. Q II 1 \\ \\ \\ \\ \ \\ \\ EI G PP \\ OE NEW TEMPORARY SKIMMER SEDIMENT BASIN.THE INSIDE SLOPES OF THE SKIMMER SEDIMENT BASIN Z \ SHALL BE STABILIZED WITH NORTH AMERICAN GREEN 575 EROSION CONTROL MATTING UPON - , \ `-' O \ \ COMPLETION OF CONSTRUCTION. 0 1.. `� kr' I �j`�.�' I \ \ \ \ \ rx \ / F NEW COIR,JUTE OR BURLAP BAFFLES. ()O \ \�\ I .1r• N `���' \\ \ \ \ \ \ 1 \ ....../. O NEW TEMPORARY SKIMMER DEVICE. LLI LLI 0 0 x 1 1 � / 1 \ ®NEW TEMPORARY ON-SITE CONCRETE WASHOUT STRUCTURE WITH LINER.PROVIDE CLEARLY MARKED J Et Mk �Y-" `�p , I/ •` \ \ \ SIGNAGE NOTING DEVICE LOCATION. • LL Et O h�Ifk. L �� y I , \ \ \ \ \ O NEW TEMPORARY EMERGENCY SPILLWAY. 0 O� Z I \ \ \ Lm ,I s•, ( \ EXISTING GRAVEL TO BE REMOVED AFTER INSTALLATION OF EROSION CONTROL MEASURES.GRAVEL I—^ .444 \�/ \ \ \ / I I MAY BE USED AS SALVAGEABLE FILL MATERIAL WHERE APPROPRIATE IF DETERMINED ACCEPTABLE BY IJ Z (-Are) :� O� , o �", 1I\■1 \ © \ \ `/ l H�\�� AN INDEPENDENT SOILS TESTING LABORATORY. 0 Z 0 / �■ I� \ \ \ \ \ \ \ OL M • A"1_�, I , \\\. \ ', \ I I MEASURES,AS REQUIRED.I EXISTINGOT TREE TO BE LIMOV REMOVED THEO STUMP.NO STUMPSI MAY BETR O `01 _ W I \ \ \ \ \ \ \ �� ,`/' REMOVED UNTIL THE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY l> @: ■■■�■� \ \ \ ■■■■� ■"I \ \ \ J EROSION CONTROL INSPECTOR. } II} iI. 111� / \ \ \ II:=1 _� \ \ ® AREA WITHIN SEPTIC SYSTEM DRAIN FIELD TO BE SELECTIVELY CLEARED/GRUBBED TO ALLOW (n GI. \ \ \ \ LL�`dff` I INSTALLATION OF DRAIN LINES.NO GRADING SHALL BE PERFORMED IN THIS AREA O 41 0 I I ;lIL�.'� \ �\ \\ \ \ \ U- GINA&DAVID BYERLY O \ \ / DB 3063 PG 2100 �1,w jt♦■■� �� ■■�1: \ \ \ \ \ \ \ \ LOT 12 OAK PARK -� i■�■ II_■■■■, \ . . , ' ■■��■■■� \ \ \ \ 4 / STAGE 1 CONSTRUCTION SEQUENCE PB 30 PG 67 w 1 ■■�'■■�■■■�1■ \ 1 ZONED:RS40 m •\I I'�■■■�■■■■ ' at ^% \ \ \ \ \ y 1.OBTAIN AN EROSION AND SEDIMENT CONTROL PERMIT(MC)AND A CERTIFICATE OF COVERAGE M W O N H 1 .^\1■ro■■■ tl■u..■ew 5 • 05 . Z. (COC)FROM THE NCDEQ LAND QUALITY SECTION BEFORE LAND DISTURBING ACTIVITIES OCCUR. Z y N ��'t�■■�_■■■��t'!\ (\((((� (�((((((((((((( `((((((((�(((((((�(\(((((((((�((( , • 2.CONTRACTOR IS REQUIRED TO FILL OUT AND SUBMIT AN ELECTRONIC NOTICE OF INTENT(e-NOI) p ■■■��■■■ _ _ — _ �� ■■� \ \ I — — TERRY DONE$ FORM.ALL CONTRUCTION ACTIVITIES ARE REQUIRED TO FOLLOW THE NEW NCG01 PERMIT. co I; it•����■'�"11■■■ra■■' \ DISTURBED LI I\ \ _# DB 1604 PG 390 1—■■■ ■■■_■■■� \ I \ \ 3.CONTACT EROSION CONTROL INSPECTOR,THROUGH NCDEQ,(919)791-4200,TO ESTABLISH A �!■_■■■�■■ 11 LOT 21 OAK PARK PRECONSTRUCTION CONFERENCE AND AN INSPECTION SCHEDULE. p MENU'` ■■■�■■■ ■■� \ �" O N PB 30 PG 67 / Z m . �■� ■■■' "—'■■ , \ ZONED:R520 / 4.THE CONTRACTOR SHALL CONDUCT SELF-INSPECTIONS OF THE EROSION AND SEDIMENT CONTROL Z } N I_■■■�■■■ ■" ■■�■■■ \ 0 I N. MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF-INSPECTION FORM FOUND ON THE W W • \ DEMLR WEBSITE; Z ■ U.. 1 1 h0//de.nc ov/abouVdivisions/ene - neral-land-resourcesrerosion-sediment-control/forms.COMPLETE W INSPECTIONS FORMS SHALL BE KEPT ON-SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES.IT IS llaSOL I ���■�■■■�■■�III�■■■�■■■ I � RECOMMENDED THAT A COPY BE KEPT IN A PERMITS BOX SELF INSPECTIONS FOR STABILITY AND 0 0 0 O ■■■�i;� " ■■—■■■®'t , I FUNCTION OF EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST _■■■ ■�TA l■■��■■. ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EACH RAINFALL EVENT OF GREATER ■■_,■■_■ "L■■■�■■■ \m WOODS THAN 0.5 INCH.ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS t ,. .1212.4=1,1 i �"L■� �"t ■■�:���p�"�, \ \ ` DESIGNED.ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL A MAINTAINED AS E O r ■■■� ■» 1 1 / • / SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN.A RAIN GAUGE SHALL 8E INSTALLED AT ■�■�■■■ I ��■■�■1 \ \ THE PROJECT SITE FOR MONITORING. ■�}\�����I11 ■■��■ = • 5.A COPY OF THE EROSION AND SEDIMENT CONTROL PERMIT,A HARD COPY OF THE PLAN,AND ALL I sr�sr— �����■�,■,� \ SELF-INSPECTION RECORDS MUST BE KEPT ON-SITE,PREFERABLY IN A PERMITS BOX,AND OO i Q - _ • r_ �„ .sr_sr \ ACCESSIBLE AT ALL TIMES FOR INSPECTION. w rc zZ z TON s MMummi MI _Mom.. MI IM _ 1.INSTALL THE CONSTRUCTION ENTRANCE AND SEDIMENT FENCE ALONG EDGE Q w F g I" O N 86"21 �—I223— • 8.BEGIN CLEARING AND GRUBBING JUST ENOUGH TO ALLOW FOR INSTALLATION OF THE SEDIMENT o p O U BASIN AND DIVERSION BERMS.STOCKPILE TOPSOIL ON-SITE WITHIN AREAS PROTECTED BY EROSION u / CONTROL MEASURES FOR LATER DISTRIBUTION. rc rc SILAS&VA ESSA PRESSLEY,JR. 9.THE SEDIMENT BASINS CAN NOW BE INSTALLED.BEGINNING WITH LOWER DAM AND SKIMMER T OUTLET.COMPLETE SKIMMER INSTALLATION,SPILLWAY AND BAFFLES. LO 12 OAK PARK I CONREX ML SMA 201901 CONREX ML SMA 201901 I - B 30 PG 67 OPERATING COMPANY,LLC OPERATING COMPANY,LLC ,,-.� J X IS,ONCE THE DAM FOR THE SEDIMENT BASIN HAS BEEN INSTALLED,THE SEDIMENT FENCE SHOULD BE INED:RS20 LOT 13 OAK PARK LOT 14 OAK PARK / X— INSTALLED AT THE TOE OF SLOPE WITH THE SEDIMENT FENCE WITH STONE STABILIZATION./i ' 11.ONCE THE SEGMENT BASINS HAVE BEEN INSTALLED,THEN CONSTRUCTION OF DIVERSION DITCHESI ZONED:RS20 ZONED:RS20 1 o 12.SEED EMBANKMENTS AND DISTURBED AREA OF BASINS,DITCHES,AND BERMS UPON COMPLETION i ¢ m U OF CONSTRUCTION.PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS,WHICHEVER IS SHORTER.HOWEVER,NPDES GROUNDCOVER REQUIREMENTS WS/FC EROSION CONTR ICE TAKE PRECEDENCE. PLANS APPROVED FOR N UCTION 13.TEMPORARYSEDIMENTBASINSTO REMAIN INPLACEUNTILTHESITEDRAININGTOTHESEBASINS EXISTING HAS BEEN SUFFICIENTLY STABILIZED. CONDITIONS, 14.CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN DEMOLITION AND Thisplan complies with Ch er ,Se n 4-Erosion Control ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED.REMOVE EROSION p CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BV INSPECTOR. STAGE 1 EROSION of the Winston-Sale rs ounty fied Development CONTROL PLAN Ordinance. A printe of the p pproved plans must be kept on the const on si e of ce when installing required erosion con m ur SHEET GRAPHIC SCALE ® � a 6 C2. 1 kentw 2/17/2023 2:32:03 PM 1, _ _It IN FEET 1 inch= 30 ft.