Fwd: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0104053
Greg Jennings <greg@jenningsenv.com> Mon, Jan 22, 2024 at 10:45 AM
To: Zan Price<zan@jenningsenv.com>
Forwarded message
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Date: Mon, Jan 22, 2024 at 10:42 AM
Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0104053
To: North State Environmental, Inc<b.spaugh@nsenv.com>, Jennings Environmental PLLC<greg@jenningsenv.com>
AK,
�tNE51'ATF�•
al AA!
po
�
iiirN
=:; �o.
S q T. l
fS QUAM\ACT#
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
01-22-2024
North State Environmental, Inc
2889 Lowery Street
Winston Salem, NC 27101
RE: Project Name: Pilot Mountain State Park- Bean Shoals, Crossing Improvements and Home Creek Stream Restoration
Acres Approved: 13.3
Application ID: PA-002210
Permit Number: SURRY-2024-0102
Address: Hauser Road
City: Pinnacle
County: Surry
River Basin: Yadkin - Pee Dee
Stream Classification: WS-IV: Water Supply IV
Plan Type: New Plan
Dear North State Environmental, Inc,
https://mail.google.com/mail/u/0/?ik=d463bfe9a6&view=pt&search=all&permmsgid=msg-f:1788806029752729069&simpl=msg-f:1788806029752729069 1/3
1/23/24,5:50 PM Jennings Environmental PLLC Mail-Fwd: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104053
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three
(3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B
.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI)
form requesting a Certificate
of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $120 annual permit fee.After the fee is processed, you will receive the
COC
via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity.The eNOlform may be accessed atdeq.nc.gov/NCG01. Please
direct questions about the eNOlform to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future,the new responsible party must obtain a newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the
approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources
and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to
exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and
additional application fee.
In addition, it would be helpful if you notify this office of the proposed starting date for this project.
General Comments:
1. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to
speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR prior to
the removal of any ESC measures. [GS 113A-51, 15A NCAC 48 .0120]
2.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site
regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from
demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid
Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A
NCAC 48 .0110]
3.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved
erosion and sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to
stop sediment from leaving this site. [15A NCAC 4B .0115]
4.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee
https://mail.google.com/mail/u/0/?ik=d463bfe9a6&view=pt&search=all&permmsgid=msg-f:1788806029752729069&simpl=msg-f:1788806029752729069 2/3
1/23/24,5:50 PM Jennings Environmental PLLC Mail-Fwd: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104053
payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT)to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including
basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of
measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also
be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, El -Assistant Regional Engineer
Winston Salem Regional Office
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachments: Certificate of Approval
�D_E Q� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC,27105
336 776 9800
[h.......Em+a-twrtY GYHE�
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state
official.
� SURRY-2024-0102 Pilot Mountain State Park-Bean Shoals.pdf
119K
https://mail.google.com/mail/u/0/?ik=d463bfe9a6&view=pt&search=all&permmsgid=msg-f:1788806029752729069&simpl=msg-f:1788806029752729069 3/3