Loading...
HomeMy WebLinkAbout20231685 Ver 1_More Info Received_20240122 (2)Baker, Caroline D From: IDT <idt4414@gmail.com> Sent: Monday, January 22, 2024 8:38 PM To: Hoy, Amie Cc: lowegrading@gmail.com Subject: Re: [External] Re: FW: DWR 20231685 Island Dreams Trust Shoreline Stabilization Attachments: Catawba Riparian Buffer Notification Form Signed.pdf Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Arnie. I've answered your questions below in RED and also attached the completed form you requested. On Fri, Jan 19, 2024 at 3:44 PM Hoy, Arnie <amie.hov@deg.nc.gov> wrote: Good afternoon, In order to complete my review, I need some further information. 1. Can you rip rap the existing shoreline without the back cutting? No we must do back cutting along the immediate shoreline as the erosion is too great to place rip rap (as shown the pictures and diagram). However it will be minimized as much as possible 2. If you can not rip rap the existing shoreline, I will need you to provide me a replanting plan for Zone 1. Are the other trees in Zone 1 and Zone 2 to remain? If you plan to remove trees that are not on the immediate shoreline, we will need to know which ones, what species of tree and the DBH of the tree. The only live trees in zone 1 to be removed are those that are in the immediate shoreline area to be back cut in order to place the rip rap. The back cut area will be filled with raprap, and so no trees can or will be planted in the rip rap. No other live trees in zone 1 are planned to be impacted. No live trees in zone 2 are planned to be impacted. 3. I will need the attached Catawba Buffer Notification form completed as well. Done Your project will be considered "ON HOLD" until I receive all requested information. 1 Best, Amie Hoy Environmental Specialist II Division of Water Resources Office: 704-235-2200 1 Cell: 984-789-0173 DWR website: https://www.deg.nc.gov/about/divisions/water-resources E INA Q d KwWrw=endl OnAiN Email correspondence to and from this address is subject to the North Carolina Public Records Lair and may be dlscfosed fo third parties. From: IDT <idt4414@gmail.com> Sent: Monday, January 8, 2024 12:09 PM To: Hoy, Amie <amie.hoy@deg.nc.gov> Cc: lowegrading@gmail.com Subject: [External] Re: FW: DWR 20231685 Island Dreams Trust Shoreline Stabilization CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Amie, my apologies, I didn't realize you needed confirmation. Yes, I received the email and understand the Zone 1 and Zone 2 differences, thank you for the clarification. And I agree with the addition of an additional 200sq ft of temporary zone 2 disturbance (10ft x 20ft) to add to the access corridor. Thanks! On Mon, Jan 8, 2024 at 11:34 AM Hoy, Amie <amie.hov@deg.nc.gov> wrote: Good morning, Please confirm that you have received the below email and that you wish to include the additional 200 sgft of temporary impact to the buffer for your temporary access through Zone 2 of the Catawba Buffer area. Thank you, Best, Amie Hoy Environmental Specialist II Division of Water Resources Office: 704-235-2200 1 Cell: 984-789-0173 DWR website: https://www.deg.nc.gov/about/divisions/water-resources D7. E ic-2.6A, Vi-PuMmul 01 Enirarmen L7l LN3414 Email correspondence to and from this address is subject to the North arolina Public Records Law and may he disclosed to third parties, From: Hoy, Amie Sent: Friday, December 29, 2023 9:42 PM To: idt4414@gmail.com; lowegrading@gmail.com Subject: DWR 20231685 Island Dreams Trust Shoreline Stabilization Good evening, In my review of the above mentioned project, you mentioned that the property has a 30ft Zone 1 buffer. There has been some confusion of the rules in the area, and I want to be sure that you both have the correct information. All properties within the Lakes of the Catawba River Basin all have a 50ft buffer. Zone 1 is the first 30' landward from the 760' contour and Zone 2 is the additional 20' landward from Zone 1 making up a buffer area of 50'. The table of uses help determine what time of authorization is needed. If your land was platted prior to June 30, 2001, there is still a 50' buffer, however, the type of authorization that you may need can differ from those that were platted after June 30, 2001. This information can be found here: 15A NCAC 02b .0614. I will include an additional 200 feet of temporary impact in your application for temporary access through Zone 2 of the Catawba Buffer area. If you have any questions, please let me know. L:sc Deemed Allowable Allowable with Prohibited Allowable Upon Mitigation Authorization Upon Authorization ill LU[1G 1 (q) Properties that are included on a recorded subdivision plan prior to June 30, 2001: (i) Uses in Zone 2 provided that the ground is x stabilized and Item (8) of this Rule is complied with (ii) Uses in Zone l provided that the ground is x stabilized and Item (8) of this Rule is complied with. On -site waste systems, septic tanks and drainfields arc not allowed in Zone 1 Best, Amie Hoy Environmental Specialist II Division of Water Resources Office: 704-235-2200 1 Cell: 984-789-0173 DWR website: https://www.deg.nc.gov/about/divisions/water-resources D7. E i0m-hR, Ueparlmenl of Enrirarwmnt3l UUMI q Email -correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.