Loading...
HomeMy WebLinkAboutNCG140046_Monitoring Data Q4 2023_20240123 WILLIAMS MULLEN Ethan R.Ware Direct Dial. 803.567.4610 eware@williamsmullen.com RECEPI ED January 11, 2024 JAN 2 3 i�21 VIA E-MAIL & U.S. MAIL Mark Robertson Water Enforcement Branch Enforcement and Compliance Assurance Division United States Environmental Protection Agency, Region 4 61 Forsyth Street, S.W. Atlanta, Georgia 30303-8960 Robertson.Mark@ena.gov Danny Smith Supervisor, Stormwater Program Division of Energy, Minerals, and Land Resources North Carolina Department of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Dan Y.SmitWncdenr.gov Re: Necessary Quarterly Monitoring Concrete Supply Company, LLC, Lincolnton Plant Administrative Order on Consent, Docket No. CWA-04-2022-0320 Lincolnton, North Carolina Dear Mr. Robertson and Mr. Smith: Please find enclosed a copy of the quarterly monitoring at permitted outfalls of Concrete Supply Company, LLC, Lincolnton Plant, in accordance with Part III. Par. 35.a of the above- referenced Administrative Order on Consent("Order"). Monitoring occurred unless there was no qualifying rain event causing a discharge of storm water during this time, as evidenced by rain gauge readings. Feel free to call if there are any questions. Sincerely, �7 ERW/ctF/�A� L Enclosures t`,d1an R. Ware 1230 Main Street, Suite 330,Columbia,SC 29201 1 P.O.Box 81 6 Columbia,SC 29202 T 803.567 4600 F 803.567,4601 1 williamsmullen.com I A Professional Corporation Concrete Supply Co LLC Certification I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Signature: -P---- Tel: (704) 372-2930 Name: Johnie Alexander Date: Title: Environmental Manager 4 gyp• STORMWATER POLLUTION PREVENTION PLAN QUARTERLY- GOOD HOUSKEEPING/PM/BMP INSPECTION PLANT LOCATION: DATE/TIME: LAflZ120 WEATHER:_ GItX (Inspection frequency: MUST be performed QUARTERLY when facility is active) NAME: ZAMLe (t z&") SIGNATURE: A R E A S T O C H E C K: Raw material storage areas with water spri ers/misters,Truck rinse/wash and drum washout areas,Truck wash chemicals and Admix tanks,Oil tank/sheds product storage,Catch basins and pipes, Outfalls,Yard for spillage/debris. Baseline BMPS Inspection:Good House Keeping,Equipment,preventive Maintenanoe/lnspettions,Spill Control' Kits Inspection.Emptovee Training lease use additional sheets if necessa Good Housekeeping/PM Inspection Checklist Remarks what Action is Needed (Satisfactory) (Geanupfrepalrimplace/none) Is trash bin lid closed?&Is the Lid In working condition? SJ I NO Is trash removed from the site on a timely basis? (yg> NO Is the site swept"As Needed Basis'at a minimum Quarterly? E NO Is there any debris on the yard? YES Cf CO) Are outside areas kept in a neat and orderly condition? S NO Is the maintenance shop orderly for the equipment,materials and � NO tanks/drums!/totes? Is there an evidence of dripslleaks from Trucks/Equipment/ p� Tanks/Drums/Totes? YES NCO Fines scraped up/removed from equipment areas? No Are the secondary containments in good conditions with NO leaks/ NO Cracks/settlement? cis Is the secondary containment discharge pipe dosed and locked? Y S NO Are traffic areas free from equipment,materials,and other objects? NO Are cnemicats/oils/fueis stored in proper containers? �J �NO Are any storage containers leaking or deteriorating with rust? YES Are stonelsand areas kept neat and orderly manner.? NO Do you see any leaks from the baghouses? YES Are admix tanks In good condition and not leaking? <g�) NO Are Admix tanks located inside a secondary containment? S NO Are sediment traps/stone dams in good condition S NO Are ditches,pipes,swales and catch basins in good condition? Y NO Is there a vegetation growth in the ponds? YES Are ponds cleaned regularly for accumulated sediment? YES NO Are wastewater recycling basins are cleaned for accumulated sediment? NO Is the facility required to do BMP feasibility(technical and YES NO J economic)study? Do you hear any unusual noise in the equipment? YES O Page 1/2 QUARTERLY- GOOD HOUSKEEPING/PM/BMP INSPECTION Good Housekeeping/PM Inspection Checklist Remarks What Action is Needed (Satisfactory) (cleanuplrepair/replacetnone) Are washwrater recycling basins pumps working properly? S NO Check effects of return concrete and slurry drying areas on the outfall? YES NO Are equipment(pH and other)in washwater recycling basins working properly? - YES NO f Are effective cleanup procedures used for spilled materials? ES NO Are spill control kits In good condition with all the required materials? YES NO Are there any unauthorized discharges from the facility? YES NO Is process water from truck washing,drum cleaning going to t outfalls? YES NO 5� Zf5 0^/1 Are there any signs of erosion on slopes,ponds,or earthen berms? YES Should any new BMPs be implemented to protect stormwater YES F� quality? �J Have all new employees received Good Housekeeping Training? YES NO Did you provide at a minimum annual Stormwater Training to all employees that could affect the stonnwater quality NO Check for any changes in the Plant operation that could affect SWPP Plan Update? (!g> NO Check pH readings from lab report to the pH at process water pits NO Check if any other area not mentioned above needs attention NO BMP Inspection Checklist Remarks What Action is Needed Satisfactory) (cleanup/repalr/replacetnone) Are oil pumps in working order with no leaks? YE NO Are dust collectors are working property? YES NO Are compressor bleed Is contained? YE NO Are all secondary containment dlkestmlis in good condition? YES NO Are all stone and sand banters orderly? NO Is sediment in wash pits orderly and controlled? YES NO Are ripraplhay balesfberms working property? NO Is there a site erosion? YES O Is sediment from the return concrete storage areas contained? 029i NO Are there any leaky equipment/vehicles an the property? YES O Is SWPP Plan/Site Map update Necessary? YES NO Additional Remarks/Recommendations: Plan Manager Signature Date: �Z /S�2aL3 NOTES:Use the additional marks/recommendations section to describe def efencles in Housekeeping Measures.and Preventive Maintenance. Use other side if additional space is needed. Page 2/2 Waypoint 449 Springbrook Rd,Charlotte, NC 28217 Main 704.S.529.fi364 ANALYTICAL www.waypointanaiytfcal.com 1/912024 Concrete Supply Company Johnnie Alexander 3823 Raleigh Street Charlotte, NC, 28206 Ref: Analytical Testing Lab Report Number: 23-355-0031 Client Project Description: Lincointon Facility Dear Johnnie Alexander: Waypoint Analytical, LLC (Charlotte)received sample(s) on 12/21r2023 for the analyses presented in the following report. The above referenced project has been analyzed per your instructions. The analyses were performed in accordance with the applicable analytical method. The analytical data has been validated using standard quality control measures performed as required by the analytical method. Quality Assurance, method validations, instrumentation maintenance and calibration for all parameters were performed in accordance with guidelines established by the USEPA(including 40 CFR 136 Method Update Rule May 2021)unless otherwise indicated. Certain parameters (chlorine, pH, dissolved oxygen, sulfite...)are required to be analyzed within 15 minutes of sampling. Usually, but not always, any field parameter analyzed at the laboratory is outside of this holding time. Refer to sample analysis time for confirmation of holding time compliance. The results are shown on the attached Report of Analysis(s). Results for solid matrices are reported on an as- received basis unless otherwise indicated. This report shall not be reproduced except in full and relates only to the samples included in this report. Please do not hesitate to contact me or client services if you have any questions or need additional information. Sincerely, 44/t Jamie Corporaal Laboratory Project Manager Laboratory's liability in any claim relating to analyses performed shall be limited to,at laboratory's option, repeating the analysis in question at laboratory's expense,or the refund of the charges paid for performance of said analysis. Page 1 of 9 Waypoint. 449 Springbrook Rd,Charlotte,NC 28217 Main M.529.6364 ANALYTICAL www.waypoir4ana"cal.com Certification Summary Laboratory ID:WP CNC:Waypoint Analytical Carolina, Inc.(C),Charlotte,NC State Program Lab ID Expiration Date North Carolina State Program 37735 07131/2024 North Carolina State Program 402 12131/2024 South Carolina State Program 99012 07M/2024 South Carolina State Program 99012 12/312023 Page 1 of t 0001fy23.355.0031 Page 2 of 9 Waypoint aa9 Springbrook Rd, Charlotte, .5 26364 Main 704.529.63ti4 ANALYTICAL www.waypolntanalydcal.ccm Sample Summary Table Report Humber: 23-355-0031 Client Project Description: Lincolnton Facility Lab No Client Sample ID Matrix Date Collected Date Received 92613 pipe 001 Aqueous 12/21i2023 14,55 12/21/2023 16:55 Waypoint 449 Springbrook Rd,Charlotte, NC 28217 Main 704.5.529.6364364 ANALYTICAL www.waypointanalytical.com Client: Concrete Supply Company CASE NARRATIVE Project: Lincolnton Facility Lab Report Number: 23-355-0031 Date: 1/9/2024 Oil and Grease Method 1664E QC Batch No: V41844 Contamination suspected in samples. Results may be biased high. No containers remain for re-analysis. Sample 92613(Pipe 001) Analyte: Oil and Grease OC Batch No: V41844 Relative Percent Difference (RPD)for the duplicate analysis was outside of the allowable QC limits. Page 4 of 9 Waypoint. 449 SPrinBbrook Rd,Charlotte, 26217 Main 704.S 29217 29.6364 ANALYTICAL www.waypolntanatocal.com 01058 Concrete Supply Company Project Uncolntw Facility 3ohnn"re Alexander Report Date: 01/09/2024 3823 Raleigh Street W mation: ReceWed: 12/21/2023 Charlotte, NC 282D6 Report Number:23-355-0031 REPORT Of ANAL 11JU Lab No: 92613 Matrix: Aqueous Sample ID:Pipe 001 Sampled: 12/21/2023 14:55 Test Results Unhs MCL DF Date/Tkne By Ans"cal Analyzed Method HEM:Oil and Grease 19.0 N mg/L S.9 1 01/05/24 10:57 RLW 1664E pH 8.17 S.U. 1 12/21/23 14:45 F D FIELD Taal Suspended Solids 18.6 mg(L 2.5 1 12/22/23 15:00 3MD 254OD-2015 Qualifiers/ — Refer to cover letter. OF Dilution Factor Definitions MQL Method Quantitation L"eNt Page 5 of 9 Waypoi nt ..9 Sprinabrook Rd,Cha Main 7 NC 2a217 Main 04.529.6364 ANALYTICAL www.waypolntana"Wxom Shipment Receipt Form Customer Number:01058 Customer Name: Concrete Supply Company Report Number: 23-355-0031 Shipping Method Fed Ex US Postal Lab Other: �— UPS Client • Courier Thermometer ID: RT-15 3. CC Shipping container/cooler uncompromised? • Yes No Number of coolers/boxes received F 1 Custody seals intact on shipping container/cooler? Yes No • Not Present Custody seals intact on sample bottles? Yes No • Not Present Chain of Custody(COC)present? • Yes No COC agrees with sample Iabel(s)? • Yes No COC property completed • Yes No Samples in proper containers? • Yes No Sample containers intact? • Yes No Sufficient sample volume for indicated test(s)? • Yes No All samples received within holding time? • Yes No Cooler temperature in compliance? • Yes No Cooler/Samples arrived at the laboratory on ice. • Yes No Samples were considered acceptable as cooling process had begun. Water- Sample containers properly preserved • Yes No N/A Water-VOA vials free of headspace Yes No • NIA Trip Blanks received with VOAs Yes No • NrA Soil VOA method 5035—compliance criteria met Yes No • WA High concentration container(48 hr) Low concentration Encore samplers (48 hr) High concentration pre-weighed(methanol-14 d) Low conc pre-weighed vials(Sod Bill-14 d) Special precautions or instructions included? Yes • No Comments: Signature: Paula Blakeborough Date 8 Time: 12/22/2023 08:35:38 Page 6 of 9 CHAIN OF CUSTODY RECORD Way point PAGE of Werra a TaiNWRR PRGPRR WILLING: _ YES NO WA ,l.�w , Srnplee INTACT upon armor' ✓ ANALYTICAL Pro)ct Name: L-IY-NcCA 1 1`^f Received IN ICE? LI a49 SprITZa.0 1:Charbae.NC 2871? Short Hold Analysis (Yes) IND) UST Project: ) ING) PROPER PRESERVATIVES hd,cated? 1/ Phone 7W1529-0�N Fu.704a2S4WY y C 'Pies"ATTACH any project specific reporting IOC LEVEL 1 M DI IV) Raceired WITHIN HOLDING nMES7 Ghent Company Name: LOM�(�(, __.pO�V provisions andlor OC Requirements CUSTODY SEALS INTACT? +/ Report To/Contact Name: Imolts To: VOLATILES race WOUT HEADSPACE? y Reporting Address: Address PROPER CONTAINERS usW7_- --. TEMP TlNrm w:'i$LIT obwv t 3•y-C lCorr-3 j -C Phone _. Fad(Yaa)(NO Pumhaw Order NOJBililn8 Ratmenae __—_ TO E LLEDIN BY CLIENTISAMPLWG PERSONNEL Email Address: _ __.- Requesed Due Dale J I Dry J 2 Days J 3 OWS J{Day{ J S Days CartMkeNon: NC__ SIC EDO Type: POF Excel _Other .. 'workln9 Days" J&9 Days J SWreWd to days J RushWork MGM BePre .._.- NIA ` Site Location Name: Sernubs rer+Aed afar 15 00 wig be premed non businessay pproved ONlar__ —_ Site Location Physical Address: ..,_ Ime Is Tw6ne m` lwMsaM on headless Water Chforinabd: YES NO Ile RU FOR ER {CONDITIONS RGANDWO gayle RENDERED SYwMYPOw uYIMCA .LLCTOCUNRry 8amplp Iced Upon Collection. YES NO TBa1 TSA M SAMPLE CONTAIN&` ANALYlW REGIIESTBD PRESERVA. SAMPLE DESCRIPTION C«".m `� WI�OR -TYPE . ._ TNES ' h REMARNR q ND Noun SLUDGE) SEE BELOW N0. IiBE �. o F Lfeclevon FrcdM Samplers Signature .__ Sampbd By(Print Name)__. �-e'�.._ �j _ AMMallon y. -.. upon reNnqulslNnp ey C h your suModseBen ssr waypomt Anelytleal b pacew with me u ngwead above, dhenpee must w �Arrival� wYmNba In writing to IM9fO Project Msnow..TIIM Win be ohms"IM any disnW s azw&hew been kditV w. ... —fyI r R , air -1—� .. gas, _— Aa*l nal Comments She DepamNs Tkns Field Tech Fee HE sep 22l c55 �?fieiB-Mrolan - ue6RAiaer .�-„�r, aasrLa•AeelorAtxePTmAwvMafeo DoetemL 1 OFa Fi Jun J•WMaewaa J PMrSarvr[e Jger : ORO tIN ffd 1 't� SOLI6Wi )3 :- �1�C: BRWNFLO NO ILL OTHT O NC�J SC Cl NC JSC JNC JSC LlNC J$C JNC U$C - JNC JSCIJNC JSC jNC JSC JNC JSC u 1111 ' •CONTAMER TYPE CODES: A•AmWr C•Claw 6.61ass P•PUadc; TL•TNIon.LMad Cyr VOA•Volatile Organise Analysis(Zero Hsetl SD{Ce) 6 )o a a6ed Ic Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report h or gradance onftlhng ow Thisform pleam rtstt hups deq nc go% about/diNisions energy-mmeral-land-resources npdes-stormwater-gps Permit No.: N/C or Certificate of Coverage No : /\!!C G Facility Name: ��tryC.rn.t,,, �.1�L• L' h n1 h4,,,,: 'tte l�i{T Counh: Phone No Inspector: IcA k, Date of Inspection: Time of Inspection: I y'. Total Event Precipitation(inches): All permits require qualitative monitoring to be performed during a"measurable storm event.- 'A "measurable storm event"is a storm went that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the perminee is able to document that a shorter internal is representative for local storm events during the sampling period.and the permittce obtains approval from the local DEMLR Regional Once. B� this signature. I certif} that this report is accurate and complete to the best of m) know ledge: ( ure of Pe lee or Designoyor 1. Outfall Description: Outfall No. Oak Structure(pipe.ditch,etc.): G k—ky-o a� Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: A.4uy4•c, 23,35 Page I of 2 Corset.Sued•carrmarn 083506 n br..k n Fa<rht• SWU•242,Lail modrfud 0"1 201S L C,0 (r4tjf-t 30 61-bed? �. T.' l tj • 2. Color: Describe the color of the discharge using basic colors(red, brown, blue._etc.)and tint (light.medium.dark)as descriptors: r- 3. Odor: Describe any distinct odors that the discharge nt:p have(i.e..smells strongip of oil.tseak chlorine odor,etc.): .iV UVLr 4. Clarity: Choose the number which best describes the clarity of the discharge, Where I is clear and 5 is very cloudy: C,� r 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge.where I is no solids and 5 is the surface covered with floating solids: Q _2 3 4 5 6. Suspended Solids: Choose-the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: V 2 3 4 5 7. Is there any foam in the stormwater discharge? 0 Yes No. 8. Is there an oil sheen in the stormwater discharge? OYes F_Vo. n 9. is there evidence of erasion or deposition at the outfall? 0 Yes (KNo. 10. Other Obvious Indicators of Stormw•ater Pollution: List and describe Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Ili t or�t page 2 of 2 Co MSUMNc me 083606 L,Yoln:m Facfih SwU442.Last modified 06.00 19018 WILLIAMS MULLEN Ethan R.ware RECEIVED Direct Dial: 803.567.4610 ewvare@williamsmullen.com JAN 2 3 2024 January 11, 2024 VIA E-MAIL & U.S.MAIL Mark Robertson Water Enforcement Branch Enforcement and Compliance Assurance Division United States Environmental Protection Agency, Region 4 61 Forsyth Street, S.W. Atlanta, Georgia 30303-8960 Robertson.M arkAgpa.eov Danny Smith Supervisor, Stormwater Program Division of Energy, Minerals,and Land Resources North Carolina Department of Environmental Quality 1612 Mail Service Center Raleigh,North Carolina 27699-1612 Dannv.Smith(@ncdenr.l ov Re: Necessary Quarterly Monitoring Concrete Supply Company, LLC, South Plant Administrative Order on Consent, Docket No. CWA-04-2022-0310 Charlotte, North Carolina Dear Mr. Ro Pleas oncrete Supply Corti �� �CI�- ram- ,renced Administratf plifying rain event 0 / �6q 7 ladings. Feel' ERW/ct Enclosuret 1230 Main Street,Suite 330, Columbia, SC 29201 1 P.O.Box 8116 Columbia,SC 29202 T 803.567.4600 F 803.567 4601 1 witliamsmullen.com 1 A Professional Corporation Concrete Supply Co LLC Certification I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Signature: I Tel: (704) 372-2930 Name: Johnie Alexander Date: I S ao Title: Environmental Manager STORMWATER POLLUTION PREVENTION PLAN QUARTERLY - GOOD HOUSKEEPING/,P,M,//B/MP INSPECTION PLANT LOCIyj'� : ��L�DATE(fIME:_1 WEATHER:� (Inspection frequency MUST be performed QUARTERLY w c dy Is t NAME Osk-tn�a.+/F-1�S SIGNATURE: AREAS TO CHECK: Raw material storage areas with water sprinkiers/misbrs.Truck rinseMash and drum washout areas,Truck wash chemicals and Admix tanks,Oil tankisheds product storage,Catch basins and pipes, Outfalls,Yard for spisage/debris. .+ Good House Keeping,Equipment Preventive MaintenanceMspections.Spill Control KitsInspection,Employee Training ease use additional sheets ff necessa Good Housekeeping/PM Inspectlixf Checklist Remarks Whet Action Is Needed factory) (cbanuphepairheplaeahrono) Is trash bin lid dosed?8 Is the Lid in working condition? I NO Is trash removed from the site on a timely basis? YEV NO Is the site swepl'As Needed Sasis'ata minimum Quarterly? NO Is there any debris on the yard? S O Are outside areas kept in a neat and orderly condition? YES NO Is the maintenance shop orderly for the equipment materials and YE NO tanks/drums!/totes? Is there an evidence of dripsAeaks from Trucks quipment/ YES NO Tanks/Drums/Totes? Fines scraped up/removed from equipmentames? YES NO Are the secondary containments in good conditions with NOleaks 1 YEB NO Cracks I settlement? Is the secondary containment discharge pipe dosed and locked? YE NO Are traffic areas free from equipment materials,and other objects? NO Are chemicaWoiMuels stored in proper containers? YEV NO Are any storage containers leaking or deteriorating with rust? YES O Are stone/sand areas kept neat and orderly manner? YE NO Do you see any leaks from the baghouses? YES NO Are admix tanks in good condition and did you see any leaks? NO Are Admix tanks located inside a secondary containment? ES NO Are sediment traps/stone dams in good condition NO Are ditches,pipes,swaies and catch basins in good condition? S NO Is there a vegetation growth in the ponds? S NO Are ponds cleaned regularly for accumulated sediment? NO Are washwater recycling basins are cleaned for accumulated S NO sediment? _ Does the facility required to do BMP feasibility(technical and YE NO economic)study? Do you near any unusual noise in the equipment? YES NO Page 1/2 QUARTERLY — GOOD HOUSKEEPING/PM/BMP INSPECTION Good HouselteepinglPM Inspection Cheddlst Remarks What Action Is Needed factory) I (cleanupli apatrfnpiacdttotw) Are washwater recycling basins pumps working properly? YES NO Check effects of realm concrete and slurry drying areas on the YES NO outallT Are equipment(pH and other)in wastewater recycling basins YE NO working properly? Are effective cleanup procedures used for spilled materials? NO Are spill control kits in good condition with all the required NO materials? Are there any unauthorized discharges from the facility? YES NO Is process water from truck washing.drum cleaning going to outalis? YES NO Are there any signs of erosion on slopes,ponds,or earthen berms? YES NO Could any new BMPs implemented lo protect stormwalerquality? YES NO Have all newemployess received Good Housekeeping Training? NO Did you provide at minimum annual Srormwater Training to all g NO employees that could affect the stormy atar quality Check for any changes in the Plant operation that could affect YE NO SWPP Plan Update? Check pH readings from lab report to the PH at process water pill NO02-1 —� Check if any other area not mentioned above needs attention NO BMP Inspection Checklist Remarks What Acton Is Needed (cearagdrepakfreplacehhone) Are oil pumps in working order with no leaks? NO Are dust collectors are working properly? YE NO - ' Are compressor bleed is contained? YE NO Are all secondary containment dikesAvats in good condition? YE NO Are all stone and sand barriers orderly? YE Is sediment in wash pits orderiyand controlled? NO Are ripraplhay balesiberrns working property? NO Is there a site erosion? YES N :s sediment from the return concrete storage areas contained? YES NO Are there any leaky equipmentfvehices on the property? YES N Is SWPP Plan/Site Map update Necessary? YES NO CAdditional, emarksfRecc mendlifinna:��V pC Plan Manager Signature: Date:--LrT�'� NOTES: Use the additional remarks/recommendations section to describe deficiencies in Housekeeoine Measures.and Preventive Maintenance. Use other side if additional space is needed. Page 2;2 Waypoint_ 049 Sprinebrook Rd,Charlotte,NC 282.17 ANALYTICAL Main 7e4.S29.6369 www.wawpointanatyticat.com 12/28/2023 Concrete Supply Company Johnnie Alexander 3823 Raleigh Street Charlotte, NC,28206 Ref: Analytical Testing Lab Report Number:23.349-0019 Client Project Description:South Plant Facility Dear Johnnie Alexander. Waypoint Analytical,LLC(Charlotte)received sample(s)on 1211&2023 for the analyses presented in the, fallowing report. The above referenced project has been analyzed per your instructions. The analyses were performed in accordance with the applicable analytical method. , The analytical data has been validated using standard quality control measures performed as required by the analytical method. quality Assurance,method validatioru,instrumentation maintenance and calibration for all Parameters were performed in accordance wilh'guidelines established by fhe USEPA(including 40 CFR 136 Method Update Rule May 2021)unless otherwise indicated. Certain parameters(chlorine.pH,dissolved oxygen,sulfite...)are required to be analyzed within 15 minutes of sampling.Usually,but not always,any field parameter analyzed)at the laboratory is outside of this holding time. Refer to sample analysis time for confirmation of holding time compliance. _ The results are shown on the attached Report of Analysis(s).Results for solid matrices are reported on an as- received basis unless otherwise indicated.This report shall not be reproduced except in full and relates only to the samples included in this report. Please do not hesitate to contact me or client services if you have any questions or need additional information. Sincerely, Jamie Corporeal Laboratory Project Manager LaboratoVs&Wily in any dafm relating to analyses performed shall be lim tact to,at tabofdtorys opt/on,repeafing the analysts in gtreslbn at/aboratorys expense,or the refund or the charges paid for performance of said analysis. Page 1 of s Wav L)O'nL ® 449 Springbrook Rd,Charlotte,NC 29217 ei �ANALYTIIC■ALL Twain 704.52g.6364 wwwwayllointanalypcal.com Certification Summary Laboratory ID:WP CNC:Waypolnt Analytical Carolina,Inc.(C),Charlotte,NC State Program Lab North Carofma �D Expiration Date rogram 37735 07/31l2024 North Carols a State Pa Program 402 South Caroicla 12131/2023 State Program 99012 07/31@024 South Carolina State Program 99D12 12/3tf2023 r Page 1 of 1 00016 23349-0019 Page 2 of a Wa�/� oint. 449 Springbrook Rd,Charrotte,NC 28217 Way point www L Main 704.529.6364 .waypointanalytical.com sample Summary Table Report Number. 23-349-0o19 Client Project Description: Seutit Plant Fact ty, Lab No Went Sample ID, matrix Date Collected pate Received 92104 Pipe 001 JAWe4vs 12115/202314:43 32/15/202315:16 d J I Page 3 of 8 4495pringbrook Rd,Charlotte,NC28217 Waypoint. ANALYTICAL Main 704529.636E 01058 www.waypointanalocal.com Concreterete Supply Company Project South plant Fadmy 7o 3823 Raleigh Sheet in{ormation: Report Date: 17/28/2023 Charlotte, NC 28206 Received:IZ115/2023 Report Number:23-349-0019 REPIORTOFAAGLYSIS Lab No: 92104 Sample ID:Pipe 001 MBbu:Aqueous Sampled: 12/15/2022 24:45 Teat Results lints MDL Df Date/Time BY Analytical Analysed Method HM:011 and Grease <S.6 mg/l. 5.6 1 17/27/23 09:36 RLW 16646 PH 7.2 S.U. I 12/15/2314:45 F1D FIELD Total Suspended Sgft 117 mg/L 6.6 ` 1 12/20/2316:30 3Mo 25EOD-2015 Qualifiers/ DF DO Won Factor Definitions MQL Method Quandtaaon Undt Page 4 of 8 Waypoint. 449 Springhrook Rd,Charlotte,NC 28217 ANALYTICAL Main ro4.529.rss4 ww W.Wavpolntana"Cal.com Shipment Receipt Form Customer Number:01058 Customer Name: Concrete supply Company Report Number: 23.34"019 Shipping Method Fed Ex US Postal Lab Other: F — UPS Client Courier Thermometer ID: IRT15 2. CC Shipping container/cooler uncompromised? V,Yes No Number of coolersfwxes received i Custody seals intact on shipping containerkboler7 Yes ,No •-Not Present Custody seals intact on sample bottles? Yes No 10,Not Present Chain of Custody(COC)present? .9.Yes No COG agrees with sample label(s)? -W Yes •No COO properly completed 4•Yes •No Samples in proper containers? �0,Yes zNo Sample containers Intact? •0-Yes No Sufficient sample volume for indicated test(s)? 101 Yes ,No All samples received within holding time? o.Yes No Cooler temperature In compliance? illi•yes No Cooler/Samples arrived at the laboratory on ice. -W Yes No Samples were considered acceptable as cooling process had begun. Water-Sample containers property preserved 0•Yes No NfA Water-VOA vials free of headspace Yes •No N/A Trip Blanks received with VOAs Yes No N/A Sail VOA method5035—compliance criteriamet Yes No :0•N/A High concentration container(48 hr) I Low concentration Encore samplers(48 hr) High concentration pre-weighed(methanol-14 d) j Low conic pre-weighed vials(Sod Bis-14 d) Special precautions or instructions Included? Yes :0,No Comments: Signature: An eb Norvell 9 9 _ ! Date&Time: ;12/15/202315:42:04 Page 5 .of 8 I �a CHAIN OF CUSTODY RECORDin �/pOi11�. PAGE — OF OUDTeaTOENSUREPROPERBILLINGI -YES ND NA ANALYTICAL SyeP:e3 INTACT vponam ar• 0 aaS SPnngIn. RP ad•Charlotte.NC 2e217 Project Nome: S -�,!�tr'-nyL,�'--.•-•, Rttercpd IN,CET Phone TOM32/a•W��W •��F�ax;7114525•6409 Short Hold Analysis as (No) UST Project: (Yes) (No) PROPER PRESERVATIVES ma:JIL02 Client Company Noma:<<(}(�fX'C, , S 'L/ 'Please ATTACH any project$pacific reporting(OC LEVEL 1 II 111 IV) Race-Cd VJITH124 HOLDING TILTES° _ Report TO/Contact Name: -- _ _ "(- provisions andlor QC Requirements CUSTODY SEALS INTACT> •p Reporting Address: • Invoica To:.- - _ VOLxttLESraCIIV:OUTHE•+DSPACE' __ _ �, -' - --- -- Address: __ _ - - -- PROPER CONTAINERS mea- I ----V_.- -^- -._ -.._ - ^.-�J'- ._ - _ - — _. TEMP Trlalm ID 003er:cd Z.I G Can C Phone: ._ ..-. - -!:, ZJ:- Fax(Yos)(No): Purchase Order No181111ng Reference. — r Email Address: ITC BE FILLEDIN BY CLIENT/SAMPLING PERSONNEL NCgoa'l4d Dde OBIS J1DAy Ji'Da)a JjOdr. J40.Tv3 JS D.w•. I EDD Type:PDF,-Excel. =Other . ..yvorldn Days- JGr shun YtNN 6413I Be I Certification: NC-- _ SC ,- SileLoeationName: D r rDay. JSanTgrtl."I o3 JPre Apolmed Sam::.;N rrrrnee aber lS 00 G:'1 ea NaO±aSed npTl CuSn#"day Other NIA_ - _ 1 Site Location Physical Address: -- Turnwllza I,w S Lamm On nus.V.ss dolt.Maedzj vwaaenaaana noway, Water Chlorinated: YESNO ISEa REVERSE FOR TERNS a CONDRIOMS REGARDING sERN __ cts •— -- -- RENDERED BY WAYPOINT NIALYTICAL LLG TO CLIENT, Samples Iced Upon Collection: ' L,►"�`T'ep._QQOJ�,11_1,1I.,�(L,f-••�1�csO�.•.Os+�wLT I'�L�1. _\S II)`.^.1�LwrtTC Y-✓ff_. \ �eI , IVL—II _-v'—III ,ip i•I. —i I i;l i YES -NO_TIrdE SAMPLE CONTAINER ANALYSIS REQUESTED DATE .COLLECTED IPRLVA•SAPLE DESCRIPTION I COLLECTED IRTRY WATER. B I g SIZE i REMARKSHOURS SLUDGE' SEEBELOW NO ��i ' _C_g- 3yLIS ' I 10. ; !�—^ —I —L — --- --'-- a IINI{IN�IIIIN I''IN�NNINI��{I'{�Ipp;��'=;9 _-- I �-'.,�.--_- Cwvelcamltiv Cnmoam I P±anl FnN.N !SampErs Slgnawra{—- SamPIe:18v IPnnl Name) 1'�i.1jG. \ I AtfrllaUon I� z> Upon rollnlpltshing, is C o�YY is your .00dratlon for Waypolnt Analytical la procaed with the anely Ds as raquwted abovD. ny ehangoc must be s....[tied In writing to Ilro WoypGlnt Anolydwl Pro`jaet tAanager.Thoro w1116a charges for any changes agar analyses have been 14111o11tod. ObArdwl Timd: EIIC'SN10 1I 'T'UtuC: 1 RY.4n[b aybr 0..fN �_ i eau• I If ta•n+a:a AdMhonAl Caem+eM3 • Ra+T>YIt•1 y•_aw,u. __-_ I SI±e Oewnan ilmo: Rryprk l6Y'}�rY.vnr I GK!• I - ^— Field Tech Fee: iw">•';ue.NW tlY•s.1,,z— _.__—I M,.VV F_r .AM �r ' $$MSin'0'BI TAbIo gN}rA7NtY�Q§TeOrs—�Fi T—ORTRAHSIfd1T •'J��•� V. SAMPLES ARE NOT ACCEPTEDANDVEAVIEO AGARIST COO UNTIL RECEMD AT THE LABORATORY ErIA6OAATORT Ot 4c,y Ns LJ ej Ill JUPS JWWIM'4,5- J J1L7y;nln Al•IenaI F+N Sena JSC:r ' NP ES: , U T: R ; 613TAKlF1'G-d•A1'E` -SQL O W E: I RCRAT—�f7FCD NbFILt OTHER:JNCJSC 1JNC JSC I JNC JSC 1 -)NC JSC 'JNC JSC JNC JSC J •jiJNC JSCIJNC JSC ,JNC JSC J. I J I J lasa P Plaailc: J'CONTAINER TYPE CODES: AeAmber CeCloar GeG TL=1eRon•LIncACap VOA a vast,,-. (Z e roJ Head Spac"e) i:(i l/;ifGia r - - f>ni••mmn:aa ' (rlra6lp Stormwatcr Discharge Outrall (SDO) Qualitative Monitoring Report f•ar),mrd urt•au fiffmg era tfas faros rVeore riru hops•.dcy.nc gnrfatxmtrdlrlsians elen:yuuncrd-land-resources npdes-smmormer-gps Permit No.: NIC r ort'cnifiratcofCnvcragcNo.: \K'd pacililc Nmttc: C'uuntr:Cb�p�•�, _ Phone Va _ Inspector. Date or Inspection: _.L? Time of lnspcction: t y : S - - --- - rolnl Event Pmcipitalion(inches): �— All pennies require qualitative monitoring to he perrontccl during n•'measnnhle storm event' A"mc.•rsurableslorm event"is a storm event Ella%results in an actual discharge I'mnt the permitted site oulfall. The previous measurable storm event must have been al least 72 hours prior. 1 he 72-hour storm interval does not appl\ if the permittee is able to document this a shorter interval 6 representative fi,r Real stone icc. during the sampling period.and the pennittee obtain,appro\al from the local Df AII.R Regional(ll'�ce. r li) this signalure. 1 certifj teat this report is accurate and complete to the hen of my kilos\Icd,c: (Si' eofPenttitk esignrcl ---- -- -. .-._ -_. ---- I. OuIL•11�Description: 1" OullAI No. Ob� Structure Ipipe.ditch,etc.): - �pG�a6e - Rvwei\ing Stream: — DOwribe the Industrial acuvitie.s that incur a iihin the oulfall drainage ama: • MJ(Y� __ _ Page 1 of'2 291119111111111111 MillWili111i11 5 91w,' U\L.L] Lnl mr.da,;J r•�r•].�rlN Gnaia,nrt F.Ruh Page 7 of-a Goncrr✓3c� SrXaC't� go, yq., �•L� S,Gb 2, Color: Describe the color ol•lhc discharge using basic colors(red.brown.blue.etc.)and silo (light,medium,darks a+descriptors: �� 1. -�- t►--ww-_ -- ---- c Odor. Dc\crilx ant distilxt odor:that life discharge ma} h:ne l i.a,smell++trorn,h of uil."ra! chlorinetuiar.ctc.t. (Jry p� J• Clarity: Choo>e the nuuther Which best decerihes the clarit and S is scn cfoudv: y of Use dheharge. "beer I i+clear 1 (3�) 3 J 3 '• Floating Solids: Ch"C the uuml.er Which best describe"the annsum% of fl�xuing wlid+in the wnnss:ner discharge,"here 1 i+no solids:uul S is the surthcc covered"ith Iloaliu wlitk 1 O 3 J $ 6• Suspended Solids: Chome the numbentltich best describes the amomn of\us1<ndcd solids in the slorm"aler discharge,where, I is no solids and S is c-Mmuch muddy: -' 3 J i 7. Is there any foam in the sn.nnwaler discharge? o ycs No, S. is there an oil sheen in the Stonmwter discharge'! oyes (No. 'y. Is there evidence of erosion or deposition at the ontfaIj,! O yes yy No. —.. 10. Other Obvious Indicators of Stormnafer•Pollution: l _ List and dcxrihc .Note: Low elarily,high solids.and/or the presence of fo:un,oil sheen,ur crosionldeposition may he indicative of poilutanl exposure. lhcsc conditions n:Irrnnl further invcsli�atlon, II�'d111l111 Ulu I'MIN11111111 DIMS C"'..o omwnv 3.'CIld C t}agl''_of 3 .nup ppd F IGldr IS IS:T \}OI -:,� I I}aF•lll.i.t +11I tilt'} Page 8 of 8 Stom,vp«/Wttw Wattt 4anap.m.M Irupoction �•.wnan on. Trw•L.W,1Ca`W..xq: 9rormwn« > neon 5 Mu q l,cnyxe(CYce 4(tntl.ppyl'W YTIS. $y.,e4 . Iny P,vol.wn grnWy pn.r. We�tl Srb OOn,WYpri- Y �. Y,N Irx Item Mb W Maur �s LLpy-DC4 M1M tx.0 nY _ a LlIf1�M In fil_NIOn TIY!____erm«V PFW O--•• d!!!lMI..l..64..«q nw Wx.r[Y«MeY r ynM,Nll.,b,elrp le.rCa St s,rrw ra,n j� ` + LLI ITr.,n Y a ne.y My MM.«.Wlt NY6 LfMCN(OtlYnm.nl W.Wtau N.. r. bex m+Itl.InO pMry a �MYjnp M �M«1a 1, __ t ✓ hlM wnGym � p91M w.fIrM«..ln. r b t .EJIIanM Ylosd!'�+mn a ftas L� O � 0 0 0 O 0 C Document Corrections With-in Two Months of Inspection Data!!! Waypoint_ 4495pringbrook Rd,Charlotte,NC 28217 ANALYTICAL Main 764.529.6364 www.waypointanalydcal.com 1/3/2024 Concrete Supply Company Johnnie Alexander 3823 Raleigh Street Charlotte,NC,282o6 Ref: Analytical Testing Lab Report Number 23.383-0019 Client Project description:South Plant Facility Dear Johnnie Alexander: Waypoint Analytical,LLC(Charlotte)received sample(s)on 12/29/2023 for the analyses presented in the following report The above referenced project has been analyzed per your instnmctiOn$. The analyses were performed in accordance with the applicable analytical method. The analytical data has been validated using standard quality control measures performed as required by the analytical method. Quality Assurance,method validations,instrumentation maintenance and calibration for ail parameters were performed In accordance with guidelines established by the USEPA(including 40 CFR"136 Method Update Rule May 2021)unless otherwise indicated. Certain parameters(chlorine,pH,dissolved oxygen,sulfite..,)are required to be analyzed within 15 minutes of sampling.Usually,but not always,any field parameter analyzed at the laboratory is outside of this holding time. Refer to sample analysis time for confirmation of holding time compliance. The results are shown on the attached Report of Analysis(s):Results for solid matrices are reported on an as- received basis unless otherwise indicated.This report shall not be reproduced except in full and relates only to the samples Included in this report. Please do not hesitate to contact me or client services If you have any questions or need additional information. Sincerely, I-%1� Jamie Corporeal Laboratory Project Manager Laboratorys liability in any claim relating to analyses performed shay be ymiled to,at laborato"option,repeating the analysis in question at laboratory's expense,or the refund of the charges paid forperfonnarrce of said analysis. Page 1 of a Waypoint. 449 SPringbrook Rd,Charlotte,NC 23217 ANALYTICAL Main 704.529.63611 www .vrmointana"cal.com Certification Summary Laboratory ID:WP CNC:Waypoint Anatytical Carolina,Inc.(C),Charlotte,NC State_ __ _ Program Lab ID Expiration Date North Carolina State Program 37735 07/31/2024 - North Carolina Slate Program 402 12/31/2023 South Carolina State Program 99012 07/31/2024 South Carolina State Program WD12 12031/2023 Page 1 of 00016/23-363-0019 Page 2 of 8 Waypoint. 49 Springbrook Rd,Charlotte, .5 28364 ANALYTICAL Main nalOcal.com www.waypatntanalytical,wm Sampk Summary Table Report Number. 23-363-0019 Client Project Description: South Plant Facility Lab No Client Sample ID Natror Date Collected Date Received 92893 Pipe 001 Aqueous 12/29/202312:45 12/29/2023 13:18 Page 3 of 8 Waypoint. 4495pringbrook Rd,Charlotte,NC 28217 Main 704.529.6364 glass ANALYTICAL www.waypolntana"cal.com concrete sup*CDMPWW Roved South Plant Faaty ]ahnnie Alexander 3823 Baugh sheet Information: Report Date:01/03/2024 - Charlotte, NC 28206 Received:12/29/2023 Report Numtrer:23-363.0019 - REPORTOFAMLYSZS Lab No.-' 92893 Matrix:Aqueous Sample 1D:Pipe 001 sampko: 12/29/202312:45 Test Results Units MDL DF Date/Time By Anslytiml Analyzed Method PH 6.21 s.u. 1 12/29/2312*45 FLD FIELD Tow Suspended Solids &7 mail. 2.6 1 01/02/2410:00 7MD 2540D-201s Qualifiers/ I)F Dilution Factor Definitions MQL Method Qoantita0on omit Page 4 0£ 8 Waypoint 0 449 Springbrack Rd.Charlotte,NC 28217 ANALYTICAL Main 7e4s29.6364 wwxcwaypolntanatrecaLcom Shipment Receipt Form Customer Number:01056 Customer Name: Concrete supply Company Report Number: 23-363-g019 Shipping Method Fed Ex US Postal 4!Lab Other: F- UPS / Client •Courier Thermometer i0: RT15 4.2C Shipping container/cooler uncompromised? q•Yes No Number of cooleryboxes received F j Custody seals intact on shipping container/cooler? Yes No 4,Not Present Custody seals intact on sample bottles? Yes No G' Not Present Chain of Custody(COC)present? •0,Yes . .No COC agrees with sample label(s)? .49.Yes • s No COG property completed 4,Yes 1 , No Samples in Proper containers? 4b,Yes No Sample containers intact? W Yes No Sufficient sample volume for indicated test(s)? -0,Yes • 1 No All samples received within holding time? :0.Yes No Cooler temperature in compliance? 11!Yes 'No Coeledsamples arrived at the laboratory on ice. A Yes No Samples were considered acceptable as cooling process had begun. Water-Sample containers property preserved :e) Yes +No WA Water-VOA vials free of headspace Yes • •—No *-WA Trip Blanks received with VOAs Yes. No AD N/A Soil VOA method 5035—compliance criteria met Yes •No 4-WA High concentration container(48 hr) I• Low concentration EnCore samplers(48 hr) High concentration pre-welghed(methanol-14 d) I Low cone pre weighed vials(Sod Bis-14 d) Special precautions or instructions included? Yes •0•No Comments: 1 J i Signature: Angelo Norveil Date&Time: fl W91202313:53:41 Page 5 of a \� . • CHAIN OF CUSTODY RECORD Waypom PAGE t• ) OP1 OUOTS aiOENSUP[PpOPERBILUNO: _ YES NO NA Samp_ ANALYTICAL L� RxeNN INTACT dOcn:nrnRl p _ as on 1 rcootu k Road•Cbadolre.NC 2e2t7 Project Name: SOI�C�r1_}J�p.YTr _— ReceN�9 IN ICES P Phone)04529'W 4 • For:7041526.0400 Short Hold Analysis (Yes) (No) UST Project: (Yea) (No) PROPER PRESERVATIVES Ind V3Vd7 'Client Company Name: 1' 'Please ATTACH any project spoclRC reporting jQC LEVEL 111111 IV) Recer.ed LATHnr HOLDING TIMES', +� ,_• "`-`—y Provisions andfor OC Requirements CUSTODY SEALS INTACT', Report TOIContacl Name: _ Invoice To: VOLATtLES Md YSOVT HEACSFnCE' _ K. Reporting Address:-_____. Address: PROPER CONTAINERS N aT -- TEMP ThoenlDZI-0- Obxr.T: 'C!CcV—!C 'C Phone: _ ,__—_Fax(Yes)(No):,Email Address: Order No,lBilling Reference--..,-._ _ � I7O BE FILLED IN BY CLIENTISAMPLING PERSONNEL: RsRd4slrl Dim Pala J I Oa, J 2 Day3 J.1 Dan a OmT• J S Da73 EDD Type: PDF___ Excel—__Other Certification: NC__ SC­ 'Working Day:" JG-,+,Day: Jal"dar410aers ]F!usa ri'oIL LIasi Bo j Site Location Name: _-- Samp:es rnrurat!ana l.UBxd bo r+acsseo na.!buaroF,myPlo�a I Other , NIA - Site Location Physical Address_ •- TwPar0und emm a baged On txNlriSS days crdddmg nesFeruH:mrl J,Ways. . I Water Chlorinated: YES--- NO (SEE REVERSE FOR TERNS a COIIOmNS O REGARDING SERVICES -' I —•_�—__ -___ ..- _— RENDERED BYWAYPOINT ANALYTICAL.LLC TO CLIENT) Samples load Upon Collection: YES_., NO i ! TIME — MATRIX SAMPLE CONTAINER I ANALYSIS REQUESTED DATE CLIENT I COLLECTED SOIL. _ / i i + 1, ' SAMPLE DESCRIPTION COLLECTED I MTLRpf1Y I WATER,OR, T---r— PRESERVA• / i 'TYPE 7NE5 REMARKS i ID NO. r HOURS SLUDGE) I SEE BELOW I qD, I SIZE +• / i• i t G OO J 2.2aI.23( Z•• �1S l�••YFt.I. I � � !_ Y1arEr i X. I I• I'- --� i j-- -- _ � �191HIpp�� pppplIlI qqnp II��pp pppplIpp yy��II ,3.363.00e ---- - — Po��IA�IIIIIII�pIHII'tlIpII� I1N 01058s•m.r 1 S"Oh Coma" r339 5: I ( t 1 9umb aynl Fae�Nv I f ! 'r1 ( samplers Slgrtalure— /_ _'Samptstl 8y IPrml Name).r,1� l�,CG•1'a./ ,AlNrebon I Upon relinquishing, Is C of CuStod is yourauthomation for Waypoinl Analytical to proccoa with the a Tsos as requested above.Any changes mull be ' (submitted In writing to NO Waypolnt Ano IcRI Project Managef.Them will be charges for any Changes alter analyses have been initialized. I S{N Arrhil Tkna � �n..+•.w.a Addllionat Comments — Site OePanuro Tama: I!rNMr:ri,Tay lf�JnLxPI _�____' R `C:nd Fluld TKO Fee: yiAM.? YI.�rM1a'.✓4• -11•'M.N ip l�' IJ'La �•^- -- I �. Mango. �Z ThfJ3l � rJ ;ALL oU'�,a s��i Ri—egYi�P€bsxg'rm U �SFO�- PTA 1 pG1�pTgH Tp1MLAUORATOR. •T„PNi SAMPLESA I= TED ANP VER1M AGAINST C0e UNTR RECEwEG AT TNEtABORATORY ) �J ror E+ Ju s Jlk mh{;,i,gT JCAT:ea aatumrcU:inla JC^.el I ' ' P : i OS7': GROUNDWATERj DRINKING TNAS G I�AATER: SdCIbfE`WIC tl—•9RY� FL D W ILL OTHER: NCJSC JNC JSCI JNC JSC IJNC JSC IJNC JSC IJNC -1 SC JNC JSC -INC JSC LJNCJSC CONTAINER TYPECODES: A-Amber C-Clear G-Glass Pe PiaMlc: TL-To0on4LIrmd Cop VOA-Volatile Organics Analysis(Zero Head Space) �111HIINIWIk11�tn11OOISl A111�11IIO�INI�I��a9 Cm,cutu SueW CortlKu,v 11;95z . Swla Plml F,rulM r.,IN:•4lfKvty: Qun(Qy Stormwater Discharge Outfall (SDO) QU81itatiVe Monitoring Report fin crrr,Sn¢a•ru?lit/n;e a1R drn purr.plra,c rrtrt['tips. dcq uc gu,al++lut'Jiclaenl<mere+-uuncrd-Lmd•re>vure+ nptks-slomnatcr-gps Permit No.: orCertilicmeorcowrageNo: \/r, Facility Name: Gbt-,r_r `. SOt 4, ('Ounce: ---1�]4+r1.}�_._..— _ •-- /� _phone No. - - taG4 Inspector: --kq - --- Date of Imspectiotl: _�Z•,Zq t fine ol'Imilcelion: Total H'cnl precipitation cinched:— n . All pennits require qualitative monitoring to tic perlunned during a"measurable.Iran to col.• A '•menr'nrahlc storm etvill"!a a storm event that results in an acWat discharge from file permitted site 01116111. '1 he pre,ions measurable stoma event must h:nc peen al least 12 hotvs prit+r. 1'he'?-hlnlr uonn inter al does not apple if the pennittcc is able to dcx:umrnt that a shorter interval is representative I•or local alone events during the sanq+ling period.and the penuitlee obtain,approval from the It1ea1 Dl.�II ti Regional Office. BY this signature.I coil} Ihal this report is accurate and eontpicle to the lea of In. leant ledge: tSigm ln:ol-per 1. fAufall Description: Outfall No. 001 Structure(ripe.dilch.etc.): Receiving Streaul: ------------ 1?:aeribe the industrial:xaiv!ties that occur within the out ialI draitrtge urea: ._•___ - __ l7tgc I nf_ page 7 of 8 Corvc.ra�- Svpp(y .Sam Plr�r%�- 12. aq. 23 jL:clS ?• Color: Describe the color of the discharge using h•Isic colors(red, brown,blue.Cie.)and tint (light.medium.dark)as descriptors: J%4- 3. Odor: Describe an) distinct odnry that the discharge nim have(i.e..mulls strongly of oil,vcC hk chlorine odor,cte.k QOYQi J. 'Clarity: Choose tic number which best describoc the cltuily of the di char!_c. where I is clear) and 5 is very cloudy: 1 0 3 d 5 S. F1006111.0 Solids: Choose the number which best describes the amount of)Baling solids in the stormvyaler discharge,where 1 is nn solids/a�n'd�5 is the surrace covered with floating solids; a 5 6. Suspended Solids: Choose the nundier which best describes the amount ol'suspended solids in the stonrncater discharge.%%here I is no solids and 5 is extremely muddy: 01 '_ 3 •! 5 t 7. Is there any foam in the Sonuwaler discharge? o Yes i\o. _._ .• __ ... 8. I.there an oil sheen in the stormwaler discharge? oyes 14 No. 9. Is there evidence of erosion or deposition at the otalall? o yes Vn. _ 10. Other Obvious Indicators or Stormwnter Pollution; List and describe \ote: Low clarity,high solids,and/or the presence of foam.oii sheen,or erosion/deposition may he indicative orprinutnotexposure. Thcse Conditions%varrantrurtherinvestigation. Il�hq�Il��ItI�I1�Bq�pGil0E�11011111�W o a�1W,9 _,mcten:SuooM1 Comwm .3395: 1'age 2 or 'a.+dl,W.t,d Fdoldv iwl .3•h3.1 al mµlnicJ��:nl:•nC Page 8 of e