Loading...
HomeMy WebLinkAboutNCC232036_NOT Closeout Documents_20240122 R•l OF co, G rs1, � �O �0'PPR C ARO���T GUILFORD COUNTY PLANNING ANu DEvLLOPMENT Project Closure Notice 12/22/23 EPES transport Systems,LLC Attn:Mark Bailey 3400 Edgefield Ct. Greensboro,NC 27408 Re:EPES Phase 2 23-06-SEGP-00019 Dear Mark Bailey: Due to significant site stabilization,Guilford County can release the erosion control surety for the above referenced project.Enclosed you will find the Land Improvement Bond for$7,500. Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self- inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Sincerely, Zachary Van Dyke Guilford County Planning and Development i\14 ,l Don't forget to seed and fertilize once a year to maintain healthy groundcover! Earl Davis,Soil Erosion Control Section Chief,(336)641-3803 Curtis Moore,Erosion Control Specialist,(336)641-5471 Zach Van Dyke,Erosion Control Specialist,(336)641-2139 Post Office Box 3427•Greensboro,North Carolina 27402