Loading...
HomeMy WebLinkAboutNCC201460_NOT Closeout Documents_20240122 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Wake Project: Town of Cary Downtown Park River basin: Neuse Person financially responsible:Town of Cary-Matthew Flynn,Stormwater Project#: WAKE-2019-101 Development Manager Address: 316 North Academy Street,Cary,NC 27513 1. Project Location: Walnut Street,Cary Pictures: No 2. Weather and soil conditions: sunny,dry,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): no one Title: Inspection report: Sent Report Date given/sent: January 19,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: December 18,2023 Time arriving on site: 12:30 PM Time leaving site: 12:35 PM CC: