HomeMy WebLinkAboutNC0037737_CEI_20240124DocuSign Envelope ID: A5837721-4A43-4E63-897F-F26FA62082C5
ROY COOPER
Co,ernor
ELIZABETH S. B1SER
Secretary
RICHARD E. ROGERS, JR.
Director
o-`"` sreve4
l��QWM'�a
NORTH CAROLINA
Environmental Quality
SENT VIA ELECTRONIC MAIL ONL Y.' NO HARD COPY WILL BE MAILED.
January 22, 2024
Wendy Miller
Roumelco Properties DBA Nantahala Village
Email: nantahalaresortmanagement@outlook.com
SUBJECT: Compliance Inspection Report
Nantahala Village WWTP
NPDES WW Permit No. NCO037737
Swain County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Nantahala Village WWTP
on 1/10/2024. This inspection was conducted to verify that the facility is operating in compliance with
the conditions and limitations specified in NPDES WW Permit No. NC0037737. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me, Rachel Rose with the Water
Quality Regional Operations Section in the Asheville Regional Office, at 828-296-4500 or via email at
rachel.rose@deq.nc.gov.
Sincerely,
DocuSi�g/ne�d bye:
I/VG�3
SACE19D3940C494...
Rachel Rose, Environmental Specialist
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche
Juanita James (CIRC, James & James Environmental)
D_EQ� firth[arollna9egartmenlofFm9ronmrntalQualhVlDivlsWnaFWaterResaurcrs
Ash,v11k Rc9i—IMcc12090U.5.HVghwayX I1 wanna—. North C 11na 28TT6
ou.s.nwo.xv..w o.iNJ-� 62&296.45C0
DocuSign Envelope ID: A5837721-4A43-4E63-897F-F26FA62082C5
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO037737 111 121 24/01/10 I17
18 LC] I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII
IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA
---------------------- Reserved -------------------
67
I 72 I n, I
701 I 71 I LL -1
LJ
71 I 74 79 I I I I I I I80
I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:30AM 24/01/10
18/06/01
Nantahala Village WWTP
9400 U S Hwy 19 W
Exit Time/Date
Permit Expiration Date
Bryson City NC 28713
11:30AM 24/01/10
22/10/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Wendy Miller,9400 U S Hwy 19 W Bryson City NC 28713H678-751-7797/
Yes
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Flow Measurement 0 Operations & Maintenar
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
Lauren EArmeni D—Sign.nbylJ NRn DWR/ARO WQ/828-296-4500/
Rachel Rose C�D„6J9„6,24E6_ DWR/ARO WQ/828-296-4500/
1/23/2024
1/23/2024
LD�81i,d
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers
Date
D Si, gby:
E
1/23/2024
AAn.tt,�,e�bSS
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
DocuSign Envelope ID: A5837721-4A43-4E63-897F-F26FA62082C5
NPDES yr/mo/day Inspection Type (Cont.)
NCO037737 I11 12I 24/01 /10 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Rachel Rose and Lauren Armeni with the ARO Regional Office (ARO), met with Juanita James (ORC,
James & James Environmental), Hannah Turner (General Manager, James & James Environmental),
Matt Anderson (Maintenance Worker, Nantahala Village), and Constantine Roumel (Owner,
Nantahala Village) to conduct a Compliance Evaluation Inspection on January 10, 2024 for the
Nantahala Village WWTP. This inspection was conducted to follow-up on repairs to the facility to
determine whether the facility has fixed the major violations noted in the March 21, 2023 inspection.
The following repairs and items were noted during the inspection:
1. Operations & maintenance: The facility is now operating as intended due to the repairs and
maintenance conducted throughout.
2. Septic tank: There were two septic tanks observed during the inspection with the first catching
solids and the second catching grey water. Two alternating dosing bells were observed in the second
septic tank and were functioning at the time of the inspection.
3. Sand filer: At the time of the inspection, the sand filters were operating as intended. All three sand
filter beds were regularly used on a one to two week alternating basis. The sand in all three filters
was properly raked, did not have a significant amount of black sand, had no signs of ponding, and
did not have a significant amount of vegetation. The sand was replaced approximately three to four
months before the inspection. The distribution seemed uneven; however, the freezing temperatures
at the time of the inspection most likely caused some of the sprinkler heads in one of the sand filter
beds to freeze over. It is suggested to maintain the sprinkler heads during freezing temperatures to
ensure even distribution of flow across the sand filter beds. The recirculation tank and associated
alarms were functioning at the time of the inspection.
4. Flow Measurement - Effluent: Ms. James indicated that they are using a bucket and timer to
measure the effluent flow now.
5. Chlorination/dechlori nation: The chlorination/dechlori nation chambers have been replaced and are
in working order.
Page#
DocuSign Envelope ID: A5837721-4A43-4E63-897F-F26FA62082C5
Permit: NCO037737 Owner -Facility: Nantahala Village WWTP
Inspection Date: 01/10/2024 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The facility is now operating as indended. See summary for details.
Septic Tank
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
Yes No NA NE
❑ ❑ ❑ ■
❑ ❑ ❑ ■
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Comment: The septic tanks are gravity fed with two dosing bells. See summary for details.
Sand Filters (Low rate)
Yes
No
NA
NE
(If pumps are used) Is an audible and visible alarm Present and operational?
0
❑
❑
❑
Is the distribution box level and watertight?
❑
❑
0
❑
Is sand filter free of ponding?
■
❑
❑
❑
Is the sand filter effluent re -circulated at a valid ratio?
❑
❑
❑
■
# Is the sand filter surface free of algae or excessive vegetation?
0
❑
❑
❑
# Is the sand filter effluent re -circulated at a valid ratio? (Approximately 3 to 1)
❑
❑
❑
Comment: The three sand filter beds have been properly maintained since the last inspection and
are now all in working order. See summary for details.
Disinfection -Tablet
Yes
No
NA
NE
Are tablet chlorinators operational?
0
❑
❑
❑
Are the tablets the proper size and type?
■
❑
❑
❑
Number of tubes in use? 4
Is the level of chlorine residual acceptable? ❑ ❑ ❑
Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑
Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑
Comment: The chlorination chamber has ben replaced since the last inspection. See summary for
details.
De -chlorination Yes No NA NE
Type of system ? Tablet
Page# 3
DocuSign Envelope ID: A5837721-4A43-4E63-897F-F26FA62082C5
Permit: NC0037737 Owner -Facility:
Inspection Date: 01/10/2024 Inspection Type:
Nantahala Village WWTP
Compliance Evaluation
De -chlorination
Yes
No
NA
NE
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
❑
0
❑
Is storage appropriate for cylinders?
❑
❑
0
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Comment:
Are the tablets the proper size and type? 0 ❑ ❑ ❑
Are tablet de -chlorinators operational? ■ ❑ ❑ ❑
Number of tubes in use? 6
Comment: The dechlorination chamber has been replaced. Extra tubes are used for the
dechlorination chamber because they dissolve quicker than the chlorine tablets. See
summary for details.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: A bucket and timer is now used to measure the effluent flow at the end of the
dechlorination chamber. See summary for details.
Yes No NA NE
❑ ■ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ■ ❑
Page# 4