HomeMy WebLinkAboutNCC240180_ESC Approval Submitted_20240123 ROY ,;.„,,,srpar„:‘
Governor ¢ ,,
ELIZABETH S.BISER
Secretary '' u'
WILLIAM E. TOBY VINSON,JR. ` Y
Interim Director NORTH CAROLINA
Environmental Quality
December 15, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Union Shrine Properties, Inc.
Attention: William Cox, President
124 Brightland Run
Monroe,North Carolina 28112
RE: Project Name: Union County Shrine Club
Acres Approved: 3.21
Project ID: UNION-2024-013
County: Union, City: Monroe
Address: US 601/Pageland Hwy.
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Jesse Wilson, PE, Wilson Engineering Group
Date Received by LQS: December 5, 2023
Plan Type: Revised
Dear Mr. Cox:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOl) foiiu requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO foam submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI faun may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI faun to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file
at the job site:
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
1 1 Mooresville Regional Office(610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
704-663-1699
Letter of Approval with Modifications
Union Shrine Properties, Inc.
December 15, 2023
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing
natural resources and adjoining properties. If,following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notified this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
/)
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
ec: Jesse Wilson, PE
Letter of Approval with Modifications
Union Shrine Properties, Inc.
December 15, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Union County Shrine Club
Project ID: UNION-2024-013
County: Union
1. Basin #1 shall have a minimum depth of 2' and a minimum 1.5' of elevation between the Emergency
Spillway (EMS) and Top of Dam. The EMS needs to be installed at Elev. 600.5' to provide the minimum
depths and elevations as indicated. Also,the basin shall have a minimum surface area of 1,509 sf provided
at the EMS elevation (Elev. 600.5'). The minimum dimensions to obtain the required surface area would
need to be 28' L x 55' W (or any other length/width to achieve the required surface area). Silt fence and
stone outlet(s) shall be installed along the edge of the disturbed limits to contain sediment during basin
installation and removal. A straw wattle may be necessary to contain sediment from skimmer excavation
below basin. Monitor and install if necessary to prevent off-site sediment.
2. Basin #2 shall have a minimum depth of 2' and a minimum 1.5' of elevation between the Emergency
Spillway (EMS) and Top of Dam. The EMS needs to be installed at Elev. 601.0' to provide the minimum
depths and elevations as indicated. Also,the basin shall have a minimum surface area of 1,321 sf provided
at the EMS elevation (Elev. 601.0'). The minimum dimensions to obtain the required surface area would
need to be 27' L x 50' W (or any other length/width to achieve the required surface area).
3. Upon breaching Basin#2 per Construction Sequence Note# 9, sufficient excavated storage area(e.g. 4' W
x 4' L x 2' D) shall be provided in front of the stone outlet to contain sediment until the resulting disturbed
area has been adequately stabilized.
4. If erosion occurs in the permanent graded swales, provide an adequate ditch liner to stabilize ditches.
44
.
0
CA
. CI %
.
ta
°6 � .� °trai
®
G 44
° .„
°
(a h .
.2 °S
c
6
et et 1 I
E.
>�
-4..• ) CO Vag" ,_ .°Po 0 Z . ;:.;
.
c6) � .
n
till
r • � 14 4
c
o °
Ca G,
Ct
0 MO .1..1 41