Loading...
HomeMy WebLinkAbout20201669 Ver 1_No Written Concurrence_20240123From: Snider, Holley To: Currey, Greaory E CIV USARMY CESAW (USA); Jeff; anneienkins420Calamail.com Cc: Luck, Cameron A; Cannon. Amanda J Subject: RE: [External] 2011-01803 RGP-56 Tearsheet Haywood & Anne Proctor Docking Facility Date: Tuesday, January 23, 2024 11:46:00 AM Attachments: GC4497 final.odf Good morning All, Please see the attached Division of Water Resources 401 water quality certification. This does not alleviate the need to obtain all other necessary federal, state or local permits, including the CAMA permit. In accordance with the attached General Certification #4497 (GC 4497), the impacts described in your CAMA major permit renewal request, do not require written authorization to utilize GC 4497. However, you are required to follow the conditions listed in the attached certification. If the conditions of the attached general water quality certification cannot be met or the project scope changes so that the thresholds listed are exceeded, additional review will be required by the Division of Water Resources and an Individual Water Certification may be required. The approval does not alleviate the need to comply with any other federal, state and local requirements before proceed with your project. The Division of Water resources has assigned the project#20201669. Any future DWR correspondence should reference this project number. Please feel free to contact me if you have any questions or need my assistance in any way. Sincerely, Holley Snider.. - ,><((((°>. s ,..><((((°>.• - Environmental Specialist II 401 Buffer Permitting Branch Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 *please note my email address has changed holley.sniderCa)deq.nc.gov* DE ww.m�«n a ��a vu�7iry 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Currey, Gregory E CIV USARMY CESAW (USA) <Gregory.E.Currey@usace.army.mil> Sent: Monday, January 22, 2024 5:26 PM To: Jeff <jeff@multitechind.com>; annejenkins420@gmail.com Cc: Luck, Cameron A <Cameron.Luck@deq.nc.gov>; Cannon, Amanda J <Amanda.Cannon@deq.nc.gov>; Snider, Holley <holley.snider@deq.nc.gov> Subject: [External] 2011-01803 RGP-56 Tearsheet Haywood & Anne Proctor Docking Facility CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mr. and Mrs. Haywood, attached is your renewal authorization package for the above project. Let me know if you have any questions. Please make note that the US Army Corps of Engineers has elected to issue this permit prior to the issuance of the required Division of Coastal Management CAMA permit. No development is permitted to occur prior to the applicant obtaining any and all other necessary federal, state, or local permits, including the CAMA permit. Thanks, G reg Greg Currey Regulatory Project Manager USACE, Wilmington 69 Darlington Ave. Wilmington, NC 28403 PH 910-251-4707