HomeMy WebLinkAboutNC0003433_Draft Permit_20240124 ROY COOPER
Governor , 'tt�
ELIZABETH S.BISER
,moo;
Secretary � "i°�
RICHARD E.ROGERS,JR. NORTH CAROLINA
Director Environmental Quality
January 24,2024
Ms.Jessica Bednarcik,Senior Vice President
Environmental,Health and Safety
Duke Energy Carolinas,LLC
Mail Code EC13K
P.O.Box 1006
Charlotte,North Carolina 28201-1006
Subject: Draft NPDES Permit
Permit NC0003433
Cape Fear Steam Electric
Power Plant
Chatham County
Facility Class I
Dear Ms.Bednarcik:
Enclosed with this letter is a copy of the draft Permit for your facility. Please review the draft very carefully
to ensure thorough understanding of the conditions and requirements it contains.
The draft Permit contains the following significant changes from your current permit:
1. The description of wastewater types discharged from Outfall 007 was updated to reflect the current
operational status.
2. The Internal Outfall 001 was removed from the permit because this outfall was eliminated.
3. The S-05 Outfall was removed from the permit based upon this former seep being dispositioned in
accordance with consent order EMC SOC WQ 19-001 and coverage in the Seep Corrective Action
Plan.
4. The Division is unable to eliminate Selenium limits for Outfall 007 since this Outfall has not discharged
since late 2018 and the RPA cannot be conducted.
5. The monitoring frequency for Arsenic, Selenium, and Mercury was reduced from weekly to monthly
based on the review of the effluent data and frequency of discharge.
6. The Division is unable to eliminate the WET testing requirements for Outfall 007 to be consisted with
the requirements of 15A NCAC 2B .0500.
7. The requirements associated with decanting and dewatering have been removed from Outfall 007
because decanting has been completed and dewatering discharge is routed through Outfall 008.
8. The Effluent page for Outfall 008 decanting was eliminated from the permit since this activity has been
completed and dewatering was initiated on 11/11/2019.
9. The limits for Selenium have been removed from the permit based on the results of the RPA(Outfall
008 dewatering).
10. The monitoring frequency for Arsenic,Selenium, and Mercury was reduced from weekly to monthly
based on the results of the RPA (Outfall 008 dewatering).
11. The monitoring requirements for Aluminum, Nickel,Lead, and Cadmium were eliminated from the
permit based on the results of the RPA(Outfall 008 dewatering).
12. The limits and monitoring requirements for Copper were eliminated from the permit based on the
results of the RPA (Outfall 008 dewatering).
North Carolina Department of Environmental Quality I Division of Water Resources
DE 512 North Salisb Street 11611 Mail Service Center I Ralei ,North Carolina 27699-1611
~ V 919.707.9000
13. The Division is unable to reduce frequency of the WET testing requirements for Outfall 008 until
dewatering is complete to be consistent with the Division's dewatering strategy.
14. The Division is unable to eliminate requirements associated with dewatering from Outfall 008 until
dewatering is completed.
15. The Division is unable to eliminate Selenium limits for Outfall 008 (dewatering and groundwater
remediation)since this phase of the operation has not been initiated and the RPA cannot be conducted.
16. The monitoring frequency for Arsenic, Selenium, Mercury, Aluminum, Nickel, Beryllium, Copper,
Lead,Silver, and Zinc was reduced from weekly to monthly based on the results of the RPA (Outfall
008 dewatering and groundwater remediation).
17. The monitoring frequency for instream monitoring was reduced from Monthly to Quarterly based on
the review of the instream data.
18. The monitoring frequency for fish tissue instream monitoring was reduced from Annually to once per
permit term based on the review of the fish tissue data.
The Division cannot grant the facility's request to remove 85%requirement to avoid violation of the CWA
anti-backsliding provision.
The Division cannot grant the facility's request to reduce WET frequency until the dewatering phase is
completed to ensure protection of the receiving stream.
Please provide any comments you have regarding the draft permit to this office by March 4,2024. At
this time,the Division is also publishing a notice in the newspapers of general circulation in Chatham County,
inviting public comment on the draft permit. Following the 30-day comment period,we will review all
pertinent comments received and take appropriate action on the permit renewal.
The NPDES Standard Conditions (Parts II,III,and IV)are not included with this draft. They can be found
at the following link if you would like to review them in conjunction with this draft permit.
https://bit.ly/2BZ4xxx
If you have any questions about the NPDES permit process,please contact me at the following e-mail
address: sergei.chernikovadeq.nc.gov. or telephone number: 919-707-3606.
Sincerely,
fS-L-•
ergei Chernikov,Ph.D.
nvironmental Engineer III
omplex NPDES Permitting Unit
cc: NPDES Files
EPA Region IV(e-copy)
Raleigh Regional Office/ Surface Water Protection(e-copy)
Raleigh Regional Office/ Public Water Supply(e-copy)
Aquatic Toxicology Unit(e-copy)
TACU (e-copy)
D North Departmronm Environmental Quty D
512 NorthCarolina Salisbury Streetent 1of161Envi I Mail Service CenteraliI
I Raleighivision of,NorthWater CarolinaResources 27699-1611
W)4,' .R.." 919.707.9000
apartment a Ernotranntental OP
Permit NC0003433
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
Draft PERMIT
TO DISCHARGE WASTEWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1,other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission,and the
Federal Water Pollution Control Act, as amended,
Duke Energy Progress LLC
is hereby authorized to discharge wastewater from a facility located at the
Cape Fear Steam Electric Power Plant
500 CP&L Road
Moncure
Chatham County
to receiving waters designated as an unnamed tributary to the Cape Fear River (Outfall 007) and to the
Cape Fear River (Outfalls 008, 008A, 008B, 009) in the Cape Fear River Basin in accordance with
applicable effluent limitations,monitoring requirements, and other applicable conditions set forth in Parts
I, II and III hereof.
This permit modification shall become effective
This permit and authorization to discharge shall expire at midnight on
Signed this day
Douglas Dowden
Environmental Program Supervisor II
Industrial Permitting Unit
Division of Water Resources
By Authority of the Environmental Management Commission
Page 1 of 21
Permit NC0003433
SUPPLEMENT TO PERMIT COVER SHEET
All previous NPDES Permits issued to this facility,whether for operation or discharge are hereby
revoked, and as of this issuance, any previously issued permit bearing this number is no longer effective.
Therefore,the exclusive authority to operate and discharge from this facility arises under the permit
conditions,requirements, terms, and provisions included herein.
Duke Energy Progress LLC is hereby authorized to:
1. Operate the following modified systems located at the decommissioned Cape Fear Steam Electric
Power Plant at 500 CP&L Road near Moncure in Chatham County:
• 1985 Ash Basin (Internal Outfall 005). This outfall is designated as an emergency discharge
only. This is limited to discharging excess wastewater above the available treatment plant
capacity during an eminent threat of 1985 Ash Basin overflow.
• Combined Wastewater to an Unnamed Tributary to the Cape Fear River (Outfall 007).
This outfall will discharge collected flows from the effluent channel consisting of storm water,
and episodic emergency flow from Internal Outfall 005.
• Combined Wastewater to the Cape Fear (Outfall 008). This outfall discharges combined
flows of treated wastewater from the on-site treatment facility, if necessary, to assure state
Water Quality Standards are not contravened in the receiving stream.
• 1963/1970 Ash Basins (Outfall 008A). This new outfall is designated as an emergency
discharge only. This is limited to discharging excess wastewater above the available treatment
plant capacity during an eminent threat of 1963/1970 Ash Basin overflow.
• 1963/1970 Ash Basins(Outfall 008B).This new outfall is designated as an emergency spillway
only and designed to safely pass a design storm event. This Outfall discharges to Cape Fear
River. Sampling of this spillway is waived due to unsafe conditions associated with sampling
during overflow events.
• Ash Beneficiation Retention Pond Wastewater (Outfall 009). This new outfall will
discharge episodic wastewater collected from isolated areas of the beneficiation operation
consisting of ash storage runoff,truck loading spills, and dust suppression.
2. Discharges are to the Cape Fear River and unnamed tributaries to the Cape Fear River,and are classified
as WS-IV waters in the Cape Fear River Basin.
Page 2 of 21
• Permit NC0003433
Part I
A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Internal Outfall 005
[15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
a. During the period beginning on the effective date of this permit and lasting until expiration, the
Permittee is authorized to discharge 1 on an emergency basis 1985 (East) Ash Basin wastewater
in excess of the facility's treatment capacity of 0.72 MGD to mitigate an eminent 1985 Ash
Basin overflow. Such discharges shall be limited and monitored by the Permittee as specified
below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Sample
Average Maximum Frequency 2 Type Location
Flow, MGD Daily during Estimate Effluent
Episodic Event
Footnotes:
1. The Permittee shall notify the Raleigh Regional Office (919) 791-4200 no later than the end
of the next business day of the occurrence of an emergency discharge event including time
of occurrence and cause.
2. During the duration of a discharge event, the flow shall be reported daily.
b. Upon the occurrence of an emergency overflow event, Outfall 007 effluent sampling and
reporting shall commence immediately for the limited parameters listed in A.(3.)except for
Chronic Toxicity and Mercury, and shall continue once per week for the duration of the
emergency discharge event. Results of sampling from this Outfall shall meet the effluent
limitations in A. (2.).
c. There shall be no discharge of floating solids or visible foam in other than trace amounts.
Page 3 of 21
Permit NC0003433
A. (2.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 007
[15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
Grade I Physical Chemical WPCS [15A NCAC 08G .0302]
a. During the period beginning on the effective date of this permit and lasting until expiration, the
Permittee is authorized to discharge from Outfall 007 (stormwater and emergency episodic
discharge from Internal Outfall 005). Such discharges shall be limited and monitored by the
Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Type Sample
Average Maximum Frequency Location
Flow 0.72 MGD Daily Estimate 1 Effluent
pH 6.0 <pH <9.0 S.U. Monthly Grab Effluent
Total Suspended Solids 30.0 mg/L 100.0 mg/L Monthly Grab Effluent
Oil and Grease 15.0 mg/L 20.0 mg/L Monthly Grab Effluent
Total Antimony 5.6 µg/L 5.6 µg/L Monthly Grab Effluent
Total Arsenic 10.0 µg/L 340.0 µg/L Monthly Grab Effluent
Total Molybdenum 160 µg/L 160 µg/L Monthly Grab Effluent
Total Nickel 25.0 µg/L 335.2 µg/L Monthly Grab Effluent
Total Selenium 5.0 µg/L 56.0 µg/L Monthly Grab Effluent
Total Zinc 125.7 µg/L 125.7 µg/L Monthly Grab Effluent
Turbidity 2 Monthly Grab Effluent
Total Mercury 3 12 ng/L, annual average Monthly Monthly Effluent
Total Cadmium, µg/L 4 Monthly Grab Effluent
Total Copper, µg/L Monthly Grab Effluent
Total Lead, µg/L Monthly Grab Effluent
Fluoride, mg/L Monthly Grab Effluent
Sulfates, mg/L Monthly Grab Effluent
Total Dissolved Solids, mg/L Monthly Grab Effluent
Total Thallium, µg/L Monthly Grab Effluent
Chronic Toxicity 5 Quarterly Grab Effluent
Total Hardness, mg/L Quarterly Grab Effluent
Nitrate/Nitrite as N, mg/L Quarterly Grab Effluent
Total Kjeldahl Nitrogen, mg/L Quarterly Grab Effluent
Total Nitrogen, mg/L6 Quarterly Grab Effluent
Total Phosphorus, mg/L Quarterly Grab Effluent
Footnotes:
1. Flow estimate can be based on pumping log if pumps are in service at time of flow. If flow
is occurring with no pumps operating then flow measurement is required by using a V-notch
weir, stopwatch and calibrated cylinder, or other methods approved by the Division(such as
flow sensor devices).
2. The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50
NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the
discharge cannot cause turbidity to increase in the receiving stream. Therefore,if the effluent
measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream
Page 4 of 21
Permit NC0003433
turbidity in the receiving waterbody, within 24 hours, to demonstrate the existing turbidity
level in the receiving waterbody was not increased. All data shall be reported on the DMRs.
(See 15A NCAC 2B .0211 (21)).
3. The facility shall use EPA method 1631 E. Annual average shall be the calendar average.
4. Total Cadmium shall be measured to a Practical Quantitation Level of 0.5 µg/L.
5. Chronic Toxicity (Ceriodaphnia dubia) at 90% in February, May, August, and November;
See Special Condition A. (8.).
6. Total Nitrogen= Total Kjeldahl Nitrogen+Nitrate/Nitrite as N.
If no discharge occurs during the reporting period the Permittee shall submit its DMR
eDMR), as required, and indicate "No Flow" (15A NCAC 02B .0506(a)(1)(E)).
There shall be no discharge of floating solids or visible foam in other than trace amounts.
Page 5 of 21
Permit NC0003433
A. (3.)EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 008
(dewatering) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
Grade I Physical Chemical WPCS [15A NCAC 08G .0302]
a. During the period beginning with the start of ash pond dewatering, and lasting until the addition
of groundwater remediation treated wastewater, or permit expiration,the Permittee is authorized
to discharge from Outfall 008 comingled treated ash basin dewatering wastewater. Such
discharges shall be limited and monitored by the Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Type Sample
Average Maximum Frequency Location I
Flow 0.72 MGD Daily Estimate 2 Effluent
pH 3 6.0<pH<9.0 S.U. Weekly Grab Effluent
Total Suspended Solids a 30.0 mg/L 100.0 mg/L Weekly Grab Effluent
Oil and Grease 15.0 mg/L 20.0 mg/L Weekly Grab Effluent
Total Selenium, µg/L Monthly Grab Effluent
Total Mercury 5, ng/L Monthly Grab Effluent
Turbidity 6 Weekly Grab Effluent
Total Arsenic, µg/L Monthly Grab Effluent
Chronic Toxicity 7 Monthly Grab Effluent
Total Hardness,mg/L Quarterly Grab Effluent
Nitrite/Nitrate as N,mg/L Quarterly Grab Effluent
Total Kjeldahl Nitrogen, mg/L Quarterly Grab Effluent
Total Nitrogen, mg/L 8 Quarterly Grab Effluent
Total Phosphorus,mg/L Quarterly Grab Effluent
Footnotes:
1. Effluent=comingled sample of the treatment facility's treated wastewater.
2. Flow estimate can be based on pumping log if pumps are in service at time of flow. If flow
is occurring with no pumps operating then flow measurement is required by using a V-notch
weir, stopwatch and calibrated cylinder, or other methods approved by the Division(such as
flow sensor devices).
3. The facility shall continuously monitor pH when the dewatering process commences and the
pump shall be shutoff automatically when the 15 minutes running average pH falls below
6.1 standard units or rises above 8.9 standards units. Pumping will be allowed to continue if
interruption might result in a dam failure or damage. The continuous pH monitoring is only
required when the pumps are employed. In the event of a shut-off of the dewatering pumps,
due to continuous monitoring of pH,dewatering may continue once the results of operational
samples show the wastewater is back to within the allowable range of the 15 minutes running
average for pH.
4. The facility shall continuously monitor TSS concentration when the dewatering process
commences and the pump shall be shutoff automatically when the 15 minutes running
average exceeds 50 mg/L. Pumping will be allowed to continue if interruption might result
in a dam failure or damage.The continuous TSS monitoring is only required when the pumps
are employed. In the event of a shut-off of the dewatering pumps, due to continuous
monitoring of TSS, dewatering may continue once the results of operational samples show
the wastewater is back to within the allowable range of the 15 minutes runningaverage for
g
TSS.
Page 6 of 21
Permit NC0003433
5. The facility shall use EPA method 1631 E. Annual average shall be the calendar year.
6. The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50
NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the
discharge cannot cause turbidity to increase in the receiving stream. Therefore,if the effluent
measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream
turbidity in the receiving waterbody, within 24 hours, to demonstrate the existing turbidity
level in the receiving waterbody was not increased. All data shall be reported on the DMRs.
(See 15A NCAC 2B .0211 (21)).
7. Chronic Toxicity (Ceriodaphnia dubia) at 1.7%; See Special Condition A. (9.).
8. Total Nitrogen=Total Kjeldahl Nitrogen +Nitrate/Nitrite as N.
b. When the facility commences the ash pond/ponds dewatering, the facility shall treat the
wastewater discharged from the ash pond/ponds using physical-chemical treatment, if
necessary, to assure state Water Quality Standards are not contravened in the receiving
stream. Duke Energy shall notify DWR NPDES Industrial Permitting Unit and DWR
Raleigh Regional Office, in writing,within seven calendar days of installing additional
physical-chemical treatment at this Outfall.
c. Dewatering is the removal of interstitial water starting when the free water level in the
settled ash basin is less than 3 feet, or if the water level is more than 3 feet above the ash
starting when mechanical disturbance of the ash occurs. The limits and conditions in A. (5.)
shall remain enforced until the groundwater remediation treated discharge has commenced.
d. If any one of these pollutants (As, Se, Hg, Ni, and Pb) reaches 85% of the allowable level
during the dewatering, the facility shall immediately discontinue discharge of the
wastewater and report it to the Regional Office and NPDES Industrial Permitting Unit via
telephone and e-mail.
e. The facility shall submit written notification to the DWR NPDES Industrial Permitting Unit
and the DWR Raleigh Regional Office of the intent to begin the initial ash basin dewatering
activity seven calendar days prior to commencing the dewatering.
f. The rate for lowering the liquid level in a coal ash pond shall not exceed one(1)foot per day
unless a higher rate is supported to the satisfaction of DEMLR and in accordance with
NCAC,Title 15A, Subchapter 2K.
g. If no discharge occurs during the reporting period the Permittee shall submit its DMR
(eDMR), as required, and indicate "No Flow" (15A NCAC 02B .0506(a)(1)(E)).
h. There shall be no discharge of floating solids or visible foam in other than trace amounts.
Page 7 of 21
Permit NC0003433 •
A. (4.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 008
(dewatering and ground water remediation) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
Grade I Physical Chemical WPCS [15A NCAC 08G .0302]
a. During the period beginning with the start of groundwater remediation, and lasting until
completion/termination of all ash basin dewatering activities,or permit expiration,the Permittee
is authorized to discharge from Outfall 008 comingled treated ash pond dewatering wastewater
and groundwater remediation wastewater. Such discharges shall be limited and monitored by the
Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Type Sample
Average Maximum Frequency Location I
Flow 0.72 MGD Daily Estimate 2 Effluent
pH 3 6.0<pH<9.0 S.U. Weekly Grab Effluent
Temperature, °C Weekly Grab Effluent
Total Suspended Solids 4 30.0 mg/L 100.0 mg/L Weekly Grab Effluent
Oil and Grease 15.0 mg/L 20.0 mg/L Weekly Grab Effluent
Total Aluminum 385.1 mg/L 385.1 mg/L Monthly Grab Effluent
Total Nickel 1.48 mg/L 16.3 mg/L Monthly Grab Effluent
Total Selenium 0.30 mg/L 2.73 mg/L Monthly Grab Effluent
Total Mercury 5,ng/L Monthly Grab Effluent
Turbidity 6 Weekly Grab Effluent
Total Arsenic, µg/L Monthly Grab Effluent
Total Beryllium, µg/L Monthly Grab Effluent
Total Copper, µg/L Monthly Grab Effluent
Total Lead, µg/L Monthly Grab Effluent
Total Silver, µg/L 7 Monthly Garb Effluent
Total Zinc, µg/L Monthly Grab Effluent
Sulfates, mg/L Monthly Grab Effluent
Total Dissolved Solids, mg/L Weekly Grab Effluent
Chronic Toxicity 8 Monthly Grab Effluent
Total Hardness,mg/L Quarterly Grab Effluent
Conductivity, µmhos/cm Quarterly Grab Effluent
Nitrite/Nitrate as N, mg/L Quarterly Grab Effluent
Total Kjeldahl Nitrogen, mg/L Quarterly Grab Effluent
Total Nitrogen,mg/L 9 Quarterly Grab Effluent
Total Phosphorus, mg/L Quarterly Grab Effluent
Footnotes:
1. Effluent=comingled sample of the treatment facility's treated wastewater.
2. Flow estimate can be based on pumping log if pumps are in service at time of flow. If flow is
occurring with no pumps operating then flow measurement is required by using a V-notch
weir, stopwatch and calibrated cylinder, or other methods approved by the Division(such as
flow sensor devices).
3. The facility shall continuously monitor pH when dewatering process commences and the
pump shall be shut off automatically when the 15 minutes running average pH falls below 6.1
standard units or rises above 8.9 standards units. Pumping will be allowed to continue if
interruption might result in a dam failure or damage. The continuous pH monitoring is only
Page 8 of 21
Permit NC0003433
required when the pumps are employed. In the event of a shut-off of the dewatering pumps,
due to continuous monitoring of pH, dewatering may continue once the results of operational
samples show the wastewater is back to within the allowable range of the 15 minutes running
average for pH.
4. The facility shall continuously monitor TSS concentration when the dewatering process
commences and the pump shall be shutoff automatically when the 15 minutes running average
exceeds 50 mg/L. Pumping will be allowed to continue if interruption might result in a dam
failure or damage. The continuous TSS monitoring is only required when the pumps are
employed. In the event of a shut-off of the dewatering pumps, due to continuous monitoring
of TSS,dewatering may continue once the results of operational samples show the wastewater
is back to within the allowable range of the 15 minutes running average for TSS.
5. The facility shall use EPA method 1631 E. Annual average shall be the calendar year.
6. The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50
NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the
discharge cannot cause turbidity to increase in the receiving stream. Therefore, if the effluent
measurement exceeds 50 NTU,the Permittee shall sample upstream and downstream turbidity
in the receiving waterbody, within 24 hours, to demonstrate the existing turbidity level in the
receiving waterbody was not increased. All data shall be reported on the DMRs. (See 15A
NCAC 2B .0211 (21)).
7. Total Silver shall be measured to a Practical Quantitation Level of 1.0 µg/L.
8. Chronic Toxicity (Ceriodaphnia dubia) at 1.7%; See Special Condition A. (9.).
9. Total Nitrogen= Total Kjeldahl Nitrogen+Nitrate/Nitrite as N.
b. When the facility commences the ash pond/ponds dewatering, the facility shall treat the
wastewater discharged from the ash pond/ponds using physical-chemical treatment, if
necessary, to assure state Water Quality Standards are not contravened in the receiving
stream. Duke Energy shall notify DWR NPDES Permitting and DWR Raleigh Regional
Office, in writing,within seven calendar days of installing additional physical-chemical
treatment at this Outfall.
c. Dewatering is the removal of interstitial water starting when the free water level in the
settled ash basin is less than 3 feet, or if the water level is more than 3 feet above the ash
starting when mechanical disturbance of the ash occurs. The limits and conditions in A. (6.)
shall remain enforced until all ash basins dewatering is completed.
d. If any one of these pollutants (As,Al, Se,Hg,Ni,and Pb) reaches 85% of the allowable level
during the dewatering, the facility shall immediately discontinue discharge of the
wastewater and report it to the Regional Office and Complex NPDES Permitting Branch
via telephone and e-mail.
e. The facility shall submit written notification to the DWR Complex NPDES Permitting Unit
and the DWR Raleigh Regional Office of the intent to begin the addition of groundwater
remediation wastewater to the ash basins treatment facility's influent in conjunction with
ash basin dewatering wastewater, seven calendar days prior to commencing the addition.
See Special Condition A. (18.) for further requirements.
f. The rate for lowering the liquid level in a coal ash pond shall not exceed one(1)foot per day
unless a higher rate is supported to the satisfaction of DEMLR and in accordance with
NCAC, Title 15A, Subchapter 2K.
g. If no discharge occurs during the reporting period the Permittee shall submit its DMR
(eDMR), as required, and indicate "No Flow" (15A NCAC 02B .0506(a)(1)(E)).
h. There shall be no discharge of floating solids or visible foam in other than trace amounts.
Page 9 of 21
Permit NC0003433
A. (5.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 008
(ground water remediation) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
Grade I Physical Chemical WPCS [15A NCAC 08G .0302]
a. During the period beginning with the completion/termination of all ash pond dewatering
activities,and lasting until permit expiration,the Permittee is authorized to discharge from Outfall
008 treated groundwater remediation wastewater. Such discharges shall be limited and
monitored by the Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Sample
Average Maximum Frequency Type Location
Flow 0.72 MGD Weekly Continuous 1 Effluent
pH 6.0 <pH<9.0 S.U. Weekly Grab Effluent
Temperature, °C Weekly Grab Effluent
Total Suspended Solids 30.0 mg/L 45.0 mg/L Weekly Grab Effluent
Oil and Grease 15.0 mg/L 20.0 mg/L Weekly Grab Effluent
Total Aluminum 385.1 mg/L 385.1 mg/L 2/Month Grab Effluent
Total Nickel 1.48 mg/L 16.3 mg/L 2/Month Grab Effluent
Sulfates 14,811 mg/L 14,811 mg/L 2/Month Grab Effluent
Turbidity 2 2/Month Grab Effluent
Total Mercury, ng/L 3 2/Month Grab Effluent
Total Arsenic, µg/L 2/Month Grab Effluent
Total Beryllium, µg/L 2/Month Grab Effluent
Total Lead, µg/L 2/Month Grab Effluent
Total Selenium, µg/L 2/Month Grab' Effluent
Total Silver, µg/L 4 2/Month Grab Effluent
Total Zinc, µg/L 2/Month Grab Effluent
Total Dissolved Solids,mg/L 2/Month Grab Effluent
Total Hardness,mg/L Quarterly Grab Effluent
Chronic Toxicity 5 Quarterly Grab Effluent
Conductivity, µmhos/cm Quarterly Grab Effluent
Nitrite/Nitrate as N,mg/L Quarterly Grab Effluent
Total Kjeldahl Nitrogen, mg/L Quarterly Grab Effluent
Total Nitrogen,mg/L 6 Quarterly Grab Effluent
Total Phosphorus,mg/L Quarterly Grab Effluent
Footnotes:
1. Continuous flow measurement is required by using a calibrated V-notch weir,meter,or other methods
approved by the Division(such as flow sensor devices).
2. The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50
NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the
discharge cannot cause turbidity to increase in the receiving stream. Therefore,if the effluent
measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream
turbidity in the receiving waterbody, within 24 hours, to demonstrate the existing turbidity
level in the receiving waterbody was not increased. All data shall be reported on the DMRs.
(See 15A NCAC 2B .0211 (21)).
3. The facility shall use EPA method 1631 E.
4. Total Silver shall be measured to a Practical Quantitation Level of 1.0 µg/L.
Page 10 of 21
Permit NC0003433
5. Chronic Toxicity (Ceriodaphnia dubia) at 1.7% in February, May, August, and November;
See Special Condition A. (8.).
6. Total Nitrogen=Total Kjeldahl Nitrogen +Nitrate/Nitrite as N.
b. The facility shall submit written notification to the NPDES Industrial Permitting Unit and
the DWR Raleigh Regional Office of the intent to continue groundwater wastewater
addition to the treatment facility's influent after the completion/termination of all ash
basins dewatering activities,seven calendar days prior to completion and termination of all
ash basin dewatering. See Special Condition A. (18.) for further requirements.
c. If no discharge occurs during the reporting period the Permittee shall submit its DMR
(eDMR), as required, and indicate "No Flow" (15A NCAC 02B .0506(a)(1)(E)).
d. There shall be no discharge of floating solids or visible foam in other than trace amounts.
Page 11 of 21
Permit NC0003433
A. (6.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 008A
[15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
a. During the period beginning on the effective date of this permit and lasting until expiration, the
Permittee is authorized to discharge' from Outfall 008A on an emergency basis 1963/1970 Ash
Basin wastewater in excess of the facility's treatment capacity (> 0.72 MGD) to mitigate an
eminent 1963/1970 Ash Basin overflow. Such discharges shall be limited and monitored by the
Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Sample
Average Maximum Frequency 2 Type Location
Flow Daily during Estimate Effluent
Episodic Event
pH 6.0 <pH <9.0 S.U. Daily during Grab Effluent
Episodic Event
Total Suspended Solids 30.0 mg/L 100.0 mg/L Daily during Grab Effluent
Episodic Event
Oil and Grease 15.0 mg/L 20.0 mg/L Daily during Grab Effluent
Episodic Event
Footnotes
1. The Permittee shall notify the Raleigh Regional Office (919) 791-4200 no later than the
end of the next business day of the occurrence of an emergency discharge event including
time of occurrence, duration, and cause.
2. During the duration of an emergency discharge event, the flow shall be reported daily.
There shall be no discharge of floating solids or visible foam in other than trace amounts.
•
Page 12 of 21
Permit NC0003433
A. (7.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 009
(Beneficiation miscellaneous wastewater) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
Grade I Physical Chemical WPCS [15A NCAC 08G .0302]
a. During the period beginning on the effective date of this permit and lasting until expiration, the
Permittee is authorized to discharge episodic beneficiation process area miscellaneous
wastewater (ash pile run off, wash water, captured dust spills) from Outfall 009. Such
discharges shall be limited and monitored by the Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Sample
Average Maximum Frequency Type Location 1
Flow 0.005 MGD Monthly Estimate 2 Effluent
Temperature, °C Monthly Grab Effluent
pH 6.0 <pH<9.0 S.U. Monthly Grab Effluent
Total Suspended Solids 30.0 mg/L 100.0 mg/L Monthly Grab Effluent
Oil and Grease 15.0 mg/L 20.0 mg/L Monthly Grab Effluent
Turbidity 3 Monthly Grab Effluent
Total Mercury 4 47 ng/L, annual average Monthly Grab Effluent
Total Arsenic, µg/L Monthly Grab Effluent
Total Selenium, µg/L Monthly Grab Effluent
Footnotes:
1. Effluent=comingled sample of facility treated wastewater.
2. Flow estimate can be based on pumping log if pumps are in service at time of flow. If flow
is occurring with no pumps operating then flow measurement is required by using a V-notch
weir, stopwatch and calibrated cylinder, or other methods approved by the Division(such as
flow sensor devices).
3. The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50
NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the
discharge cannot cause turbidity to increase in the receiving stream. Therefore,if the effluent
measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream
turbidity in the receiving waterbody, within 24 hours, to demonstrate the existing turbidity
level in the receiving waterbody was not increased. All data shall be reported on the DMRs.
(See 15A NCAC 2B .0211 (21)).
4. The facility shall use EPA method 1631 E. Annual average shall be the calendar year.
b. If no discharge occurs during the reporting period the Permittee shall submit its DMR
(eDMR), as required, and indicate "No Flow" (15A NCAC 02B .0506(a)(1)(E)).
c. The Permittee shall submit to the Division a completed EPA Form 2C for the addition of
beneficiation wastewaters no later than 180 days after the introduction of the beneficiation
wastewaters to the treatment system. The Division may re-open this permit and assign
additional effluent limits or conditions after review of the EPA 2C data.
d. There shall be no discharge of floating solids or visible foam in other than trace amounts.
Page 13 of 21
Permit NC0003433
A.(8.) CHRONIC TOXICITY LIMIT -Outfall 007(Quarterly)
[15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant mortality
to Ceriodaphnia dubia at an effluent concentration of 90% for Outfall 007.
The permit holder shall perform, at a minimum, quarterly monitoring using test procedures outlined in the
"North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure," Revised December 2010, or
subsequent versions or "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure"
(Revised- December 2010) or subsequent versions. The tests will be performed during the months of
February, May, August, and November. These months signify the first month of each three-month
toxicity testing quarter assigned to the facility. Effluent sampling for this testing must be obtained during
representative effluent discharge and shall be performed at the NPDES permitted final effluent discharge
below all treatment processes.
If the test procedure performed as the first test of any single quarter results in a failure or ChV below
the permit limit, then multiple-concentration testing shall be performed, at a minimum, in each of
the two following months as described in "North Carolina Phase II Chronic Whole Effluent Toxicity
Test Procedure" (Revised-December 2010) or subsequent versions.
All toxicity testing results required as part of this permit condition will be entered on the Effluent Discharge
Monitoring Form(MR-1)for the months in which tests were performed, using the parameter code TGP3B
for the pass/fail results and THP3B for the Chronic Value. Additionally, DWR Form AT-3 (original) is to
be sent to the following address:
Attention: North Carolina Division of Water Resources
Water Sciences Section/Aquatic Toxicology Branch
1621 Mail Service Center
Raleigh,NC 27699-1621
Or,results can be sent to the email, ATForms.ATB@deq.nc.gov.
Completed Aquatic Toxicity Test Forms shall be filed with the Water Sciences Section no later than 30
days after the end of the reporting period for which the report is made.
Test data shall be complete, accurate, include all supporting chemical/physical measurements and all
concentration/response data, and be certified by laboratory supervisor and ORC or approved designate
signature. Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine
is employed for disinfection of the waste stream.
Should there be no discharge of flow from the facility during a month in which toxicity monitoring is
required, the Permittee will complete the information located at the top of the aquatic toxicity (AT) test
form indicating the facility name, permit number, pipe number, county, and the month/year of the report
with the notation of"No Flow"in the comment area of the form. The report shall be submitted to the Water
Sciences Section at the address cited above.
Should the Permittee fail to monitor during a month in which toxicity monitoring is required, monitoring
will be required during the following month. Assessment of toxicity compliance is based on the toxicity
testing quarter, which is the three month time interval that begins on the first day of the month in which
toxicity testing is required by this permit and continues until the final day of the third month.
Should any test data from this monitoring requirement or tests performed by the North Carolina Division
of Water Resources indicate potential impacts to the receiving stream, this permit may be re-opened and
modified to include alternate monitoring requirements or limits.
Page 14 of 21
Permit NC0003433
NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control
organism survival, minimum control organism reproduction, and appropriate environmental controls, shall
constitute an invalid test and will require immediate follow-up testing to be completed no later than the
last day of the month following the month of the initial monitoring.
A. (9.) CHRONIC TOXICITY LIMIT-Outfall 008 (Monthly)
[15A NCAC 02B .0400 et seq., 02B .0500 et seq.]
The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant mortality
to Ceriodaphnia dubia at an effluent concentration of 1.7% for Outfall 008.
The permit holder shall perform, at a minimum, monthly monitoring using test procedures outlined in the
"North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure," Revised December 2010, or
subsequent versions or "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure"
(Revised- December 2010) or subsequent versions. Effluent sampling for this testing must be obtained
during representative effluent discharge and shall be performed at the NPDES permitted final effluent
discharge below all treatment processes.
If the test procedure performed as the first test of any month results in a failure or ChV below the
permit limit, then multiple-concentration testing shall be performed, at a minimum, in each of the
two following months as described in"North Carolina Phase II Chronic Whole Effluent Toxicity Test
Procedure" (Revised-December 2010) or subsequent versions.
All toxicity testing results required as part of this permit condition will be entered on the Effluent Discharge
Monitoring Form(MR-1)for the months in which tests were performed, using the parameter code TGP3B
for the pass/fail results and THP3B for the Chronic Value. Additionally, DWR Form AT-3 (original)is to
be sent to the following address:
Attention: North Carolina Division of Water Resources
Water Sciences Section/Aquatic Toxicology Branch
1621 Mail Service Center
Raleigh,NC 27699-1621
Or,results can be sent to the email,ATForms.ATBna,deq.nc.gov
Completed Aquatic Toxicity Test Forms shall be filed with the Water Sciences Section no later than 30
days after the end of the reporting period for which the report is made.
Test data shall be complete, accurate, include all supporting chemical/physical measurements and all
concentration/response data, and be certified by laboratory supervisor and ORC or approved designate
signature. Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine
is employed for disinfection of the waste stream.
Should there be no discharge of flow from the facility during a month in which toxicity monitoring is
required, the Permittee will complete the information located at the top of the aquatic toxicity (AT) test
form indicating the facility name, permit number, pipe number, county, and the month/year of the report
with the notation of"No Flow"in the comment area of the form. The report shall be submitted to the Water
Sciences Section at the address cited above.
Assessment of toxicity compliance is based on the toxicity testing month.
Page 15 of 21
Permit NC0003433
Should any test data from this monitoring requirement or tests performed by the North Carolina Division
of Water Resources indicate potential impacts to the receiving stream, this permit may be re-opened and
modified to include alternate monitoring requirements or limits.
NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control
organism survival,minimum control organism reproduction, and appropriate environmental controls, shall
constitute an invalid test and will require immediate follow-up testing to be completed no later than the
last day of the month following the month of the initial monitoring.
A. (10.)ADDITIONAL CONDITIONS AND DEFINITIONS
[NCGS 143-213.3 (a)(2) and NCGS 143-213.66]
1. EPA methods 200.7 or 200.8 (or the most current versions) shall be used for analyses of all metals
except for total mercury (EPA Method 1631 E).
2. All effluent samples for all external outfalls shall be taken at the most accessible location after the
final treatment but prior to discharge to waters of the U.S. (40 CFR 122.41(j)).
3. The term low volume waste sources mean wastewater from all sources except those for which
specific limitations are otherwise established in this part(40 CFR 423.11 (b)).
4. The term chemical metal cleaning waste means any wastewater resulting from cleaning any metal
process equipment with chemical compounds, including,but not limited to,boiler tube cleaning(40
CFR 423.11 (c)).
5. The term metal cleaning waste means any wastewater resulting from cleaning [with or without
chemical cleaning compounds] any metal process equipment including, but not limited to, boiler
tube cleaning,boiler fireside cleaning, and air preheater cleaning (40 CFR 423.11 (d)).
6. For all outfalls where the flow measurement is to be"estimated"the estimate can be done by using
calibrated V-notch weir, stop-watch and graduated cylinder, or other methods approved by the
Division(such as flow sensor devices).
7. The term "FGD wet scrubber wastewater" means wastewater resulting from the use of the flue-gas
desulfurization wet scrubber.
8. There shall be no discharge of polychlorinated biphenyl compounds.
9. The permittee shall report the presence of cenospheres observed in any samples on the DMRs in the
comment section.
10.Nothing contained in this permit shall be construed as a waiver by the permittee of any right to a
hearingit mayhavepursuant to State or Federal lawsregulations.and a ulat ons.
g
A. (11.) INSTREAM MONITORING
[G.S. 143-215.3 (a) (2), G.S. 143-215.66]
The facility shall conduct quarterly in-stream monitoring for total arsenic, total selenium, total mercury,
total chromium, dissolved lead, dissolved cadmium, dissolved copper, dissolved zinc, total bromide, total
hardness(as CaCO3),temperature,turbidity,and total dissolved solids(TDS). The monitoring results shall
be reported on the facility's Discharge Monitoring Reports and included with the NPDES permit renewal
application.
Instream Sample Description Location
Upstream Outfall 008 0.9 miles upstream from Outfall 008A in Cape Fear River
Downstream Outfall 008 Approximately 250 meters downstream from Outfall 008 in Cape
Fear River
Page 16 of 21
Permit NC0003433
Instream monitoring is provisionally waived considering the permittee's participation in the Middle
Cape Fear River Basin Association provided the Association agrees to sample for all the parameters
listed in this condition and at the specified locations. Instream monitoring shall be conducted as stated
in this permit should the permittee end its participation in the Association.
A. (12.) STRUCTURAL INTEGRITY INSPECTIONS OF ASH BASIN DAM
[15A NCAC 02K .0208]
The facility shall meet the dam design and dam safety requirements per 15A NCAC 2K.
A. (13.) FISH TISSUE MONITORING NEAR ASH BASIN DISCHARGE OUTFALL 008
[NCGS 143-215.3(a)(2)]
The facility shall conduct fish tissue monitoring once per permit term and submit the results with the
NPDES permit renewal application. The objective of this monitoring is to evaluate potential uptake of
pollutants by fish tissue near the ash pond discharge. The parameters analyzed in fish tissue shall include
arsenic, selenium, and mercury. The monitoring shall be conducted in accordance with the sampling plan
approved by the Division. The plan should be submitted to the Division within 180 days from the effective
date of the permit. Upon approval, the plan becomes an enforceable part of the permit.
Copies of all the study plans, study results, and any other applicable materials should be submitted to:
1) Electronic Version Only (pdf)
Division of Water Resources
WQ Permitting Section -NPDES
1617 Mail Service Center
Raleigh, NC 27699-1617
2) Electronic Version (pdf and Hard Copy)
Division of Water Resources
Water Sciences Section
1623 Mail Service Center
Raleigh,NC 27699-1623
A. (14.) COMPLIANCE BOUNDARY
[15A NCAC 02L.0107]
The compliance boundary for the disposal system shall be specified in accordance with 15A NCAC 02L
.0107(a) or (b) dependent upon the date permitted. An exceedance of groundwater standards at or beyond
the compliance boundary is subject to remediation action according to 15A NCAC 02L .0106(c), (d), or(e)
as well as enforcement actions in accordance with North Carolina General Statute 143-215.6A through 143-
215.6C.
The compliance boundary map for this facility is incorporated herein and attached hereto as Figure 1.
A. (15.) APPLICABLE STATE LAW (State Enforceable Only)
[NCGS 143-215.1(b)]
This facility shall meet the General Statute requirements under NCGS § 130A-309.200 et seq. This permit
may be reopened to include new requirements imposed under these Statutes.
Page 17 of 21
Permit NC0003433
A.(16.)ADDITION OF OTHER WASTEWATERS TO ASH BASIN TREATMENT SYSTEM
[G.S. 143-214.1 (a)]
The Permittee may introduce on-site groundwater remediation wastewater as an additional influent to the
0.72 MGD capacity treatment system discharging only to Outfall 008 provided it does not result in violation
of NC water quality standards or EPA criteria. If necessary, the Permittee shall determine what additional
treatment is required and have operational prior to the addition of groundwater wastewater.
The Permittee shall submit to the Division EPA Form 2C for the ground water wastewater addition no later
than 180 days after the introduction of the ground water wastewater to the treatment systems. The Division
may open upon further evaluation the permit and assign additional effluent limits or conditions.
A. (17.)ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS
[G.S. 143-215.1(B)]
Federal regulations require electronic submittal of all discharge monitoring reports(DMRs)and program
reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21,
2015.
NOTE: This special condition supplements or supersedes the following sections within Part II of this
permit(Standard Conditions for NPDES Permits):
• Section B. (11.) Signatory Requirements
• Section D. (2.) Reporting
• Section D. (6.) Records Retention
• Section E. (5.) Monitoring Reports
1. Reporting Requirements [Supersedes Section D. (2.) and Section E. (5.) (a)1
The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic
Discharge Monitoring Report(eDMR) internet application.
Monitoring results obtained during the previous month(s) shall be summarized for each month and
submitted electronically using eDMR. The eDMR system allows permitted facilities to enter
monitoring data and submit DMRs electronically using the internet. The eDMR system may be
accessed at: https://deq.nc.gov/about/divisions/water-resources/edmr.
If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the facility
being physically located in an area where less than 10 percent of the households have broadband
access,then a temporary waiver from the NPDES electronic reporting requirements may be granted
and discharge monitoring data may be submitted on paper DMR forms(MR 1, 1.1, 2, 3) or alternative
forms approved by the Director. Duplicate signed copies shall be submitted to the following address:
NC DEQ/Division of Water Resources/Water Quality Permitting Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
Page 18 of 21
Permit NC0003433
See"How to Request a Waiver from Electronic Reporting" section below.
Regardless of the submission method,the first DMR is due on the last day of the month following the
issuance of the permit or in the case of a new facility, on the last day of the month following the
commencement of discharge.
Starting on December 21,2025,the permittee must electronically report the following compliance
monitoring data and reports,when applicable:
• Sewer Overflow/Bypass Event Reports;
• Pretreatment Program Annual Reports; and
• Clean Water Act(CWA) Section 316(b)Annual Reports.
The permittee may seek an electronic reporting waiver from the Division(see"How to Request a
Waiver from Electronic Reporting" section below).
2. Electronic Submissions
In accordance with 40 CFR 122.41(l)(9),the permittee must identify the initial recipient at the time of
each electronic submission. The permittee should use the EPA's website resources to identify the
initial recipient for the electronic submission.
Initial recipient of electronic NPDES information from NPDES-regulated facilities means the entity
(EPA or the state authorized by EPA to implement the NPDES program)that is the designated entity
for receiving electronic NPDES data [see 40 CFR 127.2(b)].
EPA plans to establish a website that will also link to the appropriate electronic reporting tool for each
type of electronic submission and for each state. Instructions on how to access and use the appropriate
electronic reporting tool will be available as well. Information on EPA's NPDES Electronic
Reporting Rule is found at: https://www.federalregister.gov/documents/2015/10/22/2015-
24954/national-pollutant-discharge-el imination-system-npdes-electronic-reporting-rule
Electronic submissions must start by the dates listed in the "Reporting Requirements" section above.
3. How to Request a Waiver from Electronic Reporting
The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an
electronic reporting waiver, a permittee must first submit an electronic reporting waiver request to the
Division. Requests for temporary electronic reporting waivers must be submitted in writing to the
Division for written approval at least sixty (60) days prior to the date the facility would be required
under this permit to begin submitting monitoring data and reports. The duration of a temporary
waiver shall not exceed 5 years and shall thereupon expire. At such time, monitoring data and reports
shall be submitted electronically to the Division unless the permittee re-applies for and is granted a
new temporary electronic reporting waiver by the Division. Approved electronic reporting waivers
are not transferrable. Only permittees with an approved reporting waiver request may submit
monitoring data and reports on paper to the Division for the period that the approved reporting waiver
request is effective.
Page 19 of 21
Permit NC0003433
Information on eDMR and the application for a temporary electronic reporting waiver are found on
the following web page:
http://deq.nc.gov/about/divisions/water-resources/edmr
4. Signatory Requirements (Supplements Section B. (11.) (b) and Supersedes Section B. (11.) (d)1
All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part II,
Section B. (11.)(a) or by a duly authorized representative of that person as described in Part II, Section
B. (11.)(b). A person,and not a position, must be delegated signatory authority for eDMR reporting
purposes.
For eDMR submissions,the person signing and submitting the DMR must obtain an eDMR user
account and login credentials to access the eDMR system. For more information on North Carolina's
eDMR system, registering for eDMR and obtaining an eDMR user account,please visit the following
web page:
http://deq.nc.gov/about/divisions/water-resources/edmr
Certification. Any person submitting an electronic DMR using the state's eDMR system shall make
the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION
WILL BE ACCEPTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief true, accurate, and complete. 1 am
aware that there are significant penalties for submitting false information, including the possibility of
fines and imprisonment for knowing violations."
5. Records Retention [Supplements Section D. (6.)1
The permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions.
These records or copies shall be maintained for a period of at least 3 years from the date of the report.
This period may be extended by request of the Director at any time [40 CFR 122.41].
Page 20 of 21
Permit NC0003433
A. (18.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS—Outfall 008B [15A
NCAC 02B .0400 et seq., 02B .0500 et seq.]
During the period beginning on the effective date of this permit and lasting until expiration, the Permittee
is authorized to discharge on an emergency basis from Outfall 008B (emergency spillway). Such
discharges shall be limited and monitored by the Permittee as specified below:
EFFLUENT LIMITS MONITORING REQUIREMENTS
CHARACTERISTICS Monthly Daily Measurement Sample Sample
Average Maximum Frequency Type Location
Flow Waived Estimate Effluent
Sampling of this spillway is waived due to unsafe conditions associated with sampling during an
overflow event.
The Permittee shall notify the Raleigh Regional Office (919) 791-4200 no later than the end of the
next business day of the occurrence of an emergency discharge event including time of occurrence,
duration, and cause.
Page 21 of 21
N,..\\ \,.. ---90\ 1/4,-....\-:.,,,
K \\ \ ;silf ,'' '' i r ,T (----7 ( \;•,....-..-----.7, ,, _cs---:____ -_-_.!
%.‘ ,,, , /(_(---- ( c.........e....... 114
1 *\ ' ,__.-,--'..\ A-_,J) /1\_--- f,, „- C "72
.) ..„)\- ' 6 ,;- ,- ,,\;.,-> '
-"--\,.......
‘„s N':::'- ig //:,<-- , , (''. ( ' il
\\ j s`, 7/ ) C
's ‘ II; \.. 4.4 -, -, ' v 4:;.:3-',-,_/70 IFFP'`,.; 1
'''''s `\4::* ',4;f-;1: - I ' . . - 2 l'-- ''''' ;' ,,, --6 ' U
)vi'-'
Outfal l 009 p. _<s �`+ 1 ;jNr
4
,.,�� �`:.� A Internal Outfall 005 iet : t t(
, ,i;!/
iill '
Outfall 008 \ I rt_ -
5,02 ,
Outfa11008A 1 vvv ' --
,,-.:-- , ,. j....R •%:- ..."_-__ ' \ (----\ \ ic-:),---7; '"7 I
—____ \ CI ,. \..) il s
, .„,\ r-,-
_ , y y" -� \ Outfall 007 (_:_.:1/-7)1--,--
\/: i r is
I.
j ,.. e.e Outfall008B ,, (� tt �. }
�,, 1 .sue__: .
, ,, I 1
\,_",_, ,,..,, ,,,,,w, __,
. - ' 1 N.,..---. . .,1) ---"1..._.,- J fil --j 01.-Te---,41%!4 Jr
40*
Ai _.....2., 11� IJ ,
..,_
i `` S
i •� a \lam �. ,. �_i'—
•„, 1
5);//f- — -- - \\II ") ..1, —:,'- --..--
/. a ------...::/----", -104Lihk' . -- , - ._. -.. -.-',i \**"...,... \\41(Z: ,./ ) ,.._'-'--.e_.\ 1
.i 1
„v._ ,..J .____ //
......_.,,,_
\\A v ) )4gLI
_\:l \� \ :i
---)-- '''''‘ .1 „A:4,p ) ),
: Itt lb..-- y— ,,, c _
f(---.-_:.--,_ C— - 111N71-...""Vvr \
\ • C--') ) \ \\I -igt1)
SCALE: 1:24000
USGS Quad: E22SE Moncure,NC ,
Outfall 007 Outfall 008 Outfall 009
Latitude: 35°35 3 N 35 35 29.54 N 35 35 37.9"N ,
Longitude: 79°2'27"W 79°3'3.85"W 79°3'4.1" W
Stream Class: WS-IV 1 N Facility Location
Subbasin: 03-06-07 HUC: 03030002 Cape Fear Steam Electric Plant NC0003433
Receiving Stream: Cape Fear River Chatham County