Loading...
HomeMy WebLinkAboutNCG140054_Concrete Supply Report_20240122 ChmrfoN-M4cA4nburg ji / STORM Facility Inspection Wi E 5tormW ate r.Cho rMeck.org Suvices Facility Name: Concrete Supply Co-West Plant Inspection#: 81618 Contact: Johnnie Alexander, Environmental Manager Permit#: NCG140054 Inspector: Michael Schley Receiving Stream: Stewart Creek Inspection Date: 01/11/2024 Entry Time: 1:00 pm Exit Time: 2:00 pm SIC#: L. SUMMARY Facility Description:The Concrete Supply Co-West Plant is located at 3030 West Trade Street on approximately 4.1 acres.The facility produces ready-mix concrete. File Review/History: Charlotte-Mecklenburg Storm Water Services (CMSWS)previously inspected this facility on 10/19/ 2018 and a Notice of Violation was issued for the discharge of process water to the Charlotte MS 4.A follow-up inspection was conducted on 11/5/2018 and the report was issued as satisfactory. Inspection Summary:At the time of inspection,the Concrete Supply Co- West Plant was observed to be in compliance with the City of Charlotte Storm Water Pollution Control Ordinance. Please see the inspection report for comments and recommendations. Site Inspection Deficiency Comments Stormwater system (catch basins, Satisfactory Stormwater flows through the site via sheet flow to series of inlets, outfalls, etc.) drainage channels and process water holding pits. The holding pits recirculate the process water back to the site for production. Stormwater and process water can be discharged offsite via a hose which is connected to a pump and pH adjustment filter. No stormwater pollution issues were observed. Erosion issues Satisfactory No stormwater erosion issues were observed. Structural stormwater control N/A measures(SCMs) Illicit discharges/connections Satisfactory No illicit discharges or connections were observed onsite during the inspection. Aboveground storage tank(s)(ASTs) Satisfactory Assorted ASTs for concrete production were observed and any associated venting and/or outdoors throughout the facility. A list of onsite ASTs dispenser(s)—list tank size(s)and including their contents, locations, and containment was contents observed in the SWPPP. No stormwater pollution issues were observed. Underground storage tank(s)(USTs) Satisfactory One 10,000-gallon diesel fuel UST is kept onsite. No and any associated fill port area(s) stormwater pollution issues were observed with the and dispenser(s)—list tank size(s) associated fill port or dispensers. and contents Outdoor material storage area(s) Recommendation Individual bays for aggregate storage of sand and gravel were observed to be kept uncovered outdoors. Sediment from the aggregate storage areas was observed on the interior roads and at the entrance to the facility. Sweeping was being conducted at the time of inspection. CMSWS recommends continuing to implement good housekeeping procedures to help protect water quality. To report pollution or drainage problems call: 311 :T CllARLOTTE_ http://stormwater.charmeck.org 1/22/2024 7:53:25AM Page 1 of 3 Site Inspection Deficiency Comments Outdoor processing area(s) Satisfactory Concrete is processed outdoors. No stormwater pollution issues were observed. Loading/unloading area(s) Satisfactory Per facility staff, cement is unloaded onsite by rail car. Concrete is loaded directly into trucks for delivery. No stormwater pollution issues were observed. Vehicle/equipment area(s)-fueling, Satisfactory Vehicle fueling is conducted at the fuel island.Truck and maintenance,washing, storage, etc. concrete chute washing is conducted at designated areas which drain to the facilities process water holding pits. Per facility staff, no vehicle or equipment maintenance is conducted at the facility. Vehicles and equipment are stored uncovered outdoors. No stormwater pollution issues were observed. Oil/water separator and/or Satisfactory The facility has a pH adjuster attached to the outfall hose. No pretreatment stormwater pollution issues were observed. Waste storage/disposal area(s)- Recommendation Wood pallets and sealed totes awaiting disposal were open tops,waste containers, scrap observed to be kept outdoors uncovered. One municipal metal bins, etc. waste container was observed to be kept uncovered outdoors. CMSWS recommends all outdoor waste be kept covered to help protect water quality. Food service area(s) N/A Indoor material storage area(s) Satisfactory Four 55-gallon drums containing used oil, used coolant and antifreeze,form release, and hydraulic oil were observed in the oil room on spill pallets. No stormwater pollution issues were observed. Indoor processing area(s) N/A Floor drains N/A Spill response equipment Satisfactory Spill response equipment was observed throughout the facility. SWPPP Section Observed Comments Does the facility have a Stormwater Satisfactory Pollution Prevention Plan (SWPPP)? Reviewed and updated annually Satisfactory The SWPPP was reviewed and updated on 3/17/2023. Responsible party Satisfactory General location (USGS)map Satisfactory Detailed site map Satisfactory Narrative description of industrial Satisfactory processes Feasibility study Satisfactory Evaluation of stormwater outfalls(non Satisfactory A non-stormwater discharge evaluation was conducted and -stormwater discharge evaluation) recorded on 1/9/2024. Stormwater best management Satisfactory practice(BMP)summary Secondary containment plan (all Satisfactory necessary secondary containment provided and documented) Records on every release from a Satisfactory secondary containment system (for the last 5 years) Spill prevention and response Satisfactory procedures(SPRP) List of significant spills or leaks(for Satisfactory the last 3 years) To report pollution or drainage problems call: 311 CHARIAI'TE_ http://stormwater.charmeck.org 1/22/2024 7:53:25AM Page 2 of 3 EM SWPPP Section Observed Comments Solvent management plan (SMP) Satisfactory Preventative maintenance and good Satisfactory housekeeping program (PMGHP) Facility inspections conducted as Satisfactory Facility inspections were conducted and recorded on 3/3/23, required 6/9/23, 9/21/23, 10/31/23. Employee training (provided and Satisfactory Employee training was provided and documented on 10/2/23. documented) Qualitative/Analytical Monitoring Observed Comments Qualitative monitoring conducted as Satisfactory Qualitative monitoring was conducted and recorded on 6/1/23 required , 9/14/23, and 12/27/23 as required. Analytical monitoring conducted as Satisfactory Analytical monitoring was conducted and recorded on 6/1/23, required 9/14/23, and 12/27/23 as required. Analytical monitoring for onsite N/A vehicle and equipment maintenance as required Permit and Outfalls Observed Comments Copy of permit and certificate of Yes NCG140054. coverage onsite All outfalls observed Yes No stormwater pollution issues were observed. Number of Outfalls Observed 1 Representative outfall status N/A documented by DEMLR Annual no-exposure self re-certificatio N/A n documented To report pollution or drainage problems call: 311 CHARIAI'TE_ http://stormwater.charmeck.org 1/22/2024 7:53:25AM Page 3 of 3