Loading...
HomeMy WebLinkAboutNC0020656_Annual Performance_20240122.&2ectt& 4 VatPA aitd (&(a4&uzatPA cAeabnent Marti P.O. Box 249 Laurinburg, NC 28353 910-277-0214 January 17, 2024 NC Division of Water 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: System Performance Annual Report City of Laurinburg To: NC Division of Water JON& JOAURIN13URG V0 is /?oozed REi%FINED JAin S 2 L--U2L4 NCDEQ/DW /NP®ES Please find enclosed our Annual Performance reports for 2023. This will include 4 facilities: City of Laurinburg Water Treatment Plant, Pilkington, Leith Creek Wastewater Plant and City of Laurinburg Collections. Sincerely, Michele Grooms Records and Operations Aide City of Laurinburg Water Treatment Plant Annual Performance Report 2023 General Information Facility/System Name: City of Laurinburg Leith Creek Wastewater Plant Responsible Entity: City of Laurinburg Person in Charge/Contact: Dixon Medlin, Director/ORC Applicable Permit(s) NC0020656 / WQ002526 Description of Leith Creek Wastewater Plant Our Leith Creek Plant consist of two types of treatment, one extended aeration plant, consisting of 2 aeration basins, 2 clarifiers, 2 chlorine contact chambers and one return sludge pump station with 3 pumps, total capacity 2.0 million gallons per day (MGD). The second plant is an oxidation ditch style with 1 clarifier, 1 chlorination point and 1 return sludge pump station with 3 dual speed pumps, total capacity 2.0 MGD, combined 4.0 total permitted flow. The facility has 2 aerobic digesters, (1) 150,000-gallon tank and (1) 650,000- gallon tank with course air diffusers.1 de-chlor point at Dana Dr./74 bypass Effluent pump station. The City of Laurinburg is now participating in an effort to make available educational information regarding sources of household mercury and appropriate use/disposal practices. This program will facilitate public awareness regarding community collection points for mercury -containing products from residents/customers for proper disposal. Periodic reminders of such collection programs will be provided as part of the City of Laurinburg's Leith Creek WWTP. Summary of System Performance for Calendar Year 2023 The discharae from the Citv of Laurinburq's Leith Creek Wastewater Treatment Plant met all permit requirements except for the following months. I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. 4/23/23 - Monthly flow over 4MGD avg limit due to excessive rain April/23 3.95". • Annual Average Daily Flow — 3,272,000 (gallons per day) • Maximum Daily Flow/Date — 6,899,000 gallons April 23, 2023 • Total Annual Flow- 1,211,000 Gallons Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. Dixon Medlin, Treatment Plants Director, City of Laurinburg