Loading...
HomeMy WebLinkAboutNC0036773_Annual Performance_20240122Oft edoA 4 VateA wid ValkWateh Meats WAt fP&W P.O. Box 249 Laurinburg, NC 28353 910-277-0214 January 17, 2024 NC Division of Water 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: System Performance Annual Report City of Laurinburg To: NC Division of Water JOAURINGURG RE(-,,',;El"'v'ED NCDEO/D` R/, NPDES Please find enclosed our Annual Performance reports for 2023. This will include 4 facilities: City of Laurinburg Water Treatment Plant, Pilkington, Leith Creek Wastewater Plant and City of Laurinburg Collections. Sincerely, Michele Grooms Records and Operations Aide City of Laurinburg Water Treatment Plant Annual Performance Report 2023 General Information Facility/System Name: City of Laurinburg Water Treatment Plant Responsible Entity: City of Laurinburg Person In Charge/Contact: Dixon Medlin, Treatment Plants Director Applicable Permit(s) NCO036773 Description of Filter Backwash Discharge System The City of Laurinburg operates a 8.0 MGD Water Treatment Facility at 603 Lauchwood Drive. The wastewater that is generated at this facility is the water that is used to backwash the three rapid sand filters, this water is discharged into Big Branch Creek. Average discharge .052 MG per day. Summary of System Performance for Calendar Year 2023 The discharge from the City of Laurinburg's Water Treatment Plant met all permit requirements for 2023. Notification This Annual Performance Report will appear on the City of Laurinburg's web site http://www.laurinburg.org and a statement on our Consumer Confidence Report (CCR) will inform citizens that the Annual Report is available via internet or upon request. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. Dixon Medlin Treatment Plants Director City of Laurinburg