HomeMy WebLinkAboutNC0036773_Annual Performance_20240122Oft edoA 4 VateA wid ValkWateh Meats WAt fP&W
P.O. Box 249 Laurinburg, NC 28353
910-277-0214
January 17, 2024
NC Division of Water
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: System Performance Annual Report
City of Laurinburg
To: NC Division of Water
JOAURINGURG
RE(-,,',;El"'v'ED
NCDEO/D` R/, NPDES
Please find enclosed our Annual Performance reports for 2023. This will include
4 facilities: City of Laurinburg Water Treatment Plant, Pilkington, Leith Creek Wastewater Plant and
City of Laurinburg Collections.
Sincerely,
Michele Grooms
Records and Operations Aide
City of Laurinburg Water Treatment Plant
Annual Performance Report 2023
General Information
Facility/System Name: City of Laurinburg Water Treatment Plant
Responsible Entity: City of Laurinburg
Person In Charge/Contact: Dixon Medlin, Treatment Plants Director
Applicable Permit(s) NCO036773
Description of Filter Backwash Discharge System
The City of Laurinburg operates a 8.0 MGD Water Treatment Facility at 603 Lauchwood
Drive. The wastewater that is generated at this facility is the water that is used to
backwash the three rapid sand filters, this water is discharged into Big Branch Creek.
Average discharge .052 MG per day.
Summary of System Performance for Calendar Year 2023
The discharge from the City of Laurinburg's Water Treatment Plant met all permit
requirements for 2023.
Notification
This Annual Performance Report will appear on the City of Laurinburg's web site
http://www.laurinburg.org and a statement on our Consumer Confidence Report (CCR)
will inform citizens that the Annual Report is available via internet or upon request.
Certification
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I further certify that this report has been made available to the users or
customers of the named system and that those users have been notified of its
availability.
Dixon Medlin
Treatment Plants Director
City of Laurinburg