Loading...
HomeMy WebLinkAbout20240166 Ver 1_Shoreline Stabilization_20240119e'-1"J\1 ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Director FIECEIV � J AN 1 9 2024 DEQ-WATER RESOURCES 401 & BUFFER PERMfiTiP:G NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources SSA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: if sending via US Postal Service Paul Wojoski DWR —401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, INC 2.7699-1617 if sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR —401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(S), all certification requests must include documentation that a pre -filing meeting request was submitted to t e ce t ng authority at-feast30-days prior to -submitting the -certification request. Click hereto read - more information on when this form is needed prior to application submission or hereto view the form. i Attach documentation'efpre-FilXi Meeting Request to this application. Date of Pre -filing Meeting q` —J _ (required) DWR ID # Verst (if applicable) A. Applicant information RSA NCAC 02H .0502(a)] i. Owner Information Name: Charles Rush Jr. Mailing Address: Telephone Number: E-mail Address: D Q. o..m,a. 1423 Viewmont Dr. Asheboro, NC 27205 336/626-9605 Fax Number: shazbrush580email coin North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707H000 2. Agent/ Contact Person information A signed'and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here:' http //www saw usace army mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project information USA NCAC 02H .O5O2(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers,.and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip'rap, excavation or dredging below Kull Pond/ Normal Water Level elevations, and construction access s corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to.be stabilized. (include a scale.of . some so - a yard stick, shovel -handle, —etc:) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Lake/river/ocean adjacent to property: High Property size (acres): 1.48 acres Subdivision name or site address (include phase/lot number): Lot 33 Stoney Point 175 Harbor Dr. W Lexington. NC Directions to site.- please include road names and numbers, landmarks, etc.: 1'•85 to Lexington exit for NC Hwy 8 go -south on NC Hwy 8. R on Stoney Point Drive R on Harbor Dr East property is on the L side of road. Latitude (in decimal degrees) 35.37.1237 Longitude (decimal degrees) 80.13:1376 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Single-family residential community FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary):' To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? " From water? ❑ B. Total amount of impacts below the normal pool lake level/. Normal Water: Level Permanent impacts (including all excavation, backfill, rip rap,; retaining•.mjalls, etc.) in square feet: 446 5 . Ft. Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level /Normal Water Level and 50 feet land -ward Permanent impacts (including,back fill, excavation, rip rap, retaining wzlls, etc.) in square feet: 1760 Sg Ft. Temporary impacts (temporary clearing, construction -corridor) in square feet: •10. Please' describe the vegetation above the normal pool lake level/ Normal Water Level and 50, feet landward to be impacted (number of trees, for Instance): Numerous trees will be r moved in order to complete the stabilization project. py signing below, I, as the.project proponent, certify tithe following: - • The project proponent heWay certifes.that all information contained. herein is true, accurate, and.cbmplete to the best of my knowledge and belief :. . • The project proponent hereby requests that the certifying authority review and take action on t A 401 certification reques _ ithin the applicable re, period of,time H .0502 D t3 e Owner/Agents Signature 115A NCAC 02 ffl) 'Agent's signature is valid only i,°an authorization letter from the owner is proyided. 12: Please approximately sketch the.following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b.:.Location of rip rap or fill to be placed above the.Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP,09-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation (Full Pond/ Normal Water Level ® rw o Shoreline Plan view Page 4 of 6 FORM: SSGP 09-2020 Side View FORM: SSGP 09-2020 Page 5 of 6 .2 ft. additional clearing 3 ft below full pond water level 4 ft. above full pond water level If necessary Existing bank 10 ft, bank Side ViE FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS' APPLICANT: ChariesRushJr. Lot 33, Stoney Point,175 HARBOR Drive W., Lexington, NC STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 223 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope _ (223') x (1') x (2) = 446 sq. ft. *For this calculation, an average water depth of 1 ft. has been assuoed..This will .. produce a conservative overestimate of the stabilization impact area.. Calculation 2 —Impact Area Above the Normal Pool Level (Item 9 on.NCDEQ Form.SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of•Bank Above Normal Pool Varies Across the Shoreline Estimate.75 LF of Shoreline = 3 ft. Above Normal Pool Estimate 85 LF of Shoreline = 4 ft. Above Normal Pool Estimate 63 LF of Shoreline = 5 ft. Above Normal Pool Area of Impact Length x Height x Slope x 3' `x 2) + ( $5' x `4' x 2) + ( 63' x 5' x 2) = 450 + 680.+ 630 = 1760 sq.ft. impact from Construction Above Shoreline Stabilization Assume 5 ft: Wide Zone Area of Impact = 223' x 5 ft. = 1115 sq.ft. - Total Area of Impact Above Normal Pool Level = 2875 sq. ft. Vo, SITE MAP - CHARLES RUSH SCALE V=50" 1L-:,� 3 CLASS 2 RIP RAP VEGETATION AND EROSION CONTROL FABRIC 1 1N 2 EROSION CONTROL FABRIC TYPICAL CONDITIONS -36" TO 72" ERODED CUT . WAVE EXPOSURE EXISTING GRADE 1 I I Varies 2to5fL I � 1 � 1 LAKE BOTTOM Assume 1 ft. FOR: CHARLES RUSH LOCATION: LOT 33, STONEY POINT HIGH ROCK LAKE RESERVOIR: PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MODERATE RIP RAP STABILIZATION 3 LL� k b ` % J: — \ XN I IL �� 41 -•a •_'TAB 7 1/16/24, 12 56 PM 175 Harbor Dr W - Googie Maps (� (AG M�.a��s 175 Harbor Dr W Camp 4':a0°q JoRnkonQ �+: v Soudrmont Cif HqI R � I; S 1 - IaT<e �-r L.I ."Of 'him 1, 1� r ...`... unmerv0la' a Ccnstuction ve plict Cr.urrn Implement Depot _❑ ,..� �.I and Chu„b Penhtt Oeach ' , Y r h; Lowes Foods of De F• i ,•., h• a,nP Rn Denton .-- 80jangles „ it . Sunv • , (8' Tractor Supply Co. Healing tvr: - - Springs ran, e, er L] Lagle Point Nahue Preserve °yyrRP rcd. High Rock `1Z 4 Pooletown "R r J 015 , po ° La Lek Clear Spiiirs6lobal v.^"''`'e Handy was fOI'v Methodist Church Go' gle ; q: �rl aeey Ghma,Ive Map data ©2024 1 mi ° https://v .google.wnVmaps/plam/175+Harbor+Dr+W,+Lexington,+NC+272921@35.6272074,-80.2050342,13zfdata=14m6!3m511 sOx8853843bd399fecb:Ox32f302496a674285!8m2!3d35.62004414d-8... III