Loading...
HomeMy WebLinkAboutSWA000227_Email_20240118 Peck, Kaitlin From:Farkas, Jim J Sent:Thursday, January 18, 2024 3:39 PM To:brad.smith@timmons.com; gsharpe@waxhawvfd.org Cc:Allison Culicerto; Eplin, Jerry W; svc_post_construction_stormwater; Mark Griffin; Khan, Zahid; Helms, Amelia C Subject:RE: SWA000227; Waxhaw Volunteer Fire Department (Union) Attachments:Fast Track ATC Cover Letter & Permit 1-18-24.pdf Good A?ernoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Authoriza?on to Construct (ATC) Applica?on for the subject project on January 9, 2024. Staff review of the plans and specifica?ons has determined that the project, as proposed, will comply with the Stormwater Regula?ons set forth in Rule 15A NCAC 2H.1043. We are forwarding Authoriza?on to Construct Permit No. SWA000227, dated January 18, 2024, for the construc?on, opera?on and maintenance of the subject project and the stormwater system. This permit shall be effec?ve from the date of issuance and shall be subject to the condi?ons and limita?ons as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permi?ee, Gregory Sharpe, at the following address (NOTE: An electronic version of this permit can be found in our online repository: h?ps://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Waxhaw Community Volunteer Fire Department and Rescue Squad, Inc. A?n: Fire Chief Gregory Sharpe, Chief Opera?ng Officer 3500 Waxhaw Parkway Waxhaw, NC 28173-1012 We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are no?ced and correc?ons need to be made) a?er which point, it will be kept on file at the Mooresville Regional Office. If you have any ques?ons, or need addi?onal informa?on concerning this ma?er, please contact us at postconstruc?on@deq.nc.gov. Reminder: Please be aware that per 15A NCAC 02H .1044(2), the Erosion & Sediment Control (E&SC) permit for this site cannot be closed out un?l the as-built stormwater plans for this project are approved by our office. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov 1 From: svc_post_construction_stormwater <postconstruction@deq.nc.gov> Sent: Monday, September 18, 2023 12:56 PM To: brad.smith@timmons.com; gsharpe@waxhawvfd.org Cc: Allison Culicerto <Allison.Culicerto@timmons.com>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: SWA000227; Waxhaw Volunteer Fire Department (Union) Good A?ernoon, We received your post-construc?on stormwater Authoriza?on to Construct (ATC) permit applica?on for the subject project on 9/18/23. Reviews under the Fast-Track permi?ng process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000227 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at postconstruc?on@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov 2 From: Allison Culicerto <Allison.Culicerto@timmons.com> Sent: Monday, September 18, 2023 11:17 AM To: svc_post_construction_stormwater <postconstruction@deq.nc.gov> Cc: Brad Smith <Brad.Smith@timmons.com> Subject: \[External\] RE: Waxhaw Volunteer Fire Department; Waxhaw, Union County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, I have a?ached the updated sheets, please let me know if you need anything else. Allison Allison Culicerto, P.E. Project Engineer III TIMMONS GROUP | www.?mmons.com 610 East Morehead Street, Suite 250 | Charlo?e, NC 28202 Office: 704.790.2919 | Fax: 704.376.1076 Mobile: 304.952.6744 allison.culicerto@?mmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: svc_post_construction_stormwater <postconstruction@deq.nc.gov> Sent: Friday, September 8, 2023 9:17 AM To: Brad Smith <brad.smith@timmons.com>; gsharpe@waxhawvfd.org Subject: RE: Waxhaw Volunteer Fire Department; Waxhaw, Union County CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Brad, I received addi?onal informa?on for your project on 9/6/2023. There are two small issues. - On page 1 of the applica?on, for the projec?on coordinates: The provided coordinates (35° 51’ 54.7” N, 80° 46’ 17.7” W) appear to be incorrect. Please revise this. (NOTE: I apologize for leaving this comment off our last correspondence, it should have been added.) 3 - On page 5 of the applica?on for the receiving waters: Please remove “Catawba River (South Carolina) from receiving water 2. If you could respond to this email with a copy of the corrected applica?on, I can print this out and add it to your package and get it entered ASAP. Thank you, Kaitlin Peck Environmental Specialist Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov From: Peck, Kaitlin Sent: Friday, August 25, 2023 10:05 AM To: brad.smith@timmons.com; gsharpe@waxhawvfd.org Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: RE: Waxhaw Volunteer Fire Department; Waxhaw, Union County My apologies. Please note the revised paragraph: We received your application for a new Fast-Track post-construction stormwater permit on 8/24/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 9/24/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov 4 From: Peck, Kaitlin Sent: Friday, August 25, 2023 10:05 AM To: brad.smith@timmons.com; gsharpe@waxhawvfd.org Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: Waxhaw Volunteer Fire Department; Waxhaw, Union County Good Morning, We received your application for a new Fast-Track post-construction stormwater permit on 8/2/2022. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 10/7/2022) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies and 1x electronic copy of the Application with the following corrections made (These items are required per 15A NCAC 02H .1043(3)(a) and per Section F of the Application):  Section E, 4 - Please use the information for the first named surface water (“Davis Branch”, “C”, “11-139- 3”) for the receiving stream name, classification and index number. This is required per 15A NCAC 02H .1043(3).  2x hard copies and 1x electronic copy of a construc?on sequence that discusses how any future development on the project may be phased. This is required per 15A NCAC 02H .1043(3)(g) and per Sec?on F, 5 of the Applica?on. The construc?on sequence does not need to be lengthy, just a brief descrip?on of how future development on the project (beyond what is shown on the plans) will be phased. If no future development is planned for the project, you can simply state that in the construc?on sequence. This item is different than the E&SC sequence of construc?on. Since these are minor issues. You can a?ach the corrected pages in a follow up email that I can add to your exis?ng applica?on. NOTE: While not required for administra?ve completeness, this project is located in the Waxhaw Watershed and is therefore subject to the Goose Creek Rules (15A NCAC 02B .0602). Please ensure that the difference between the pre- and post-development 1-year 24-hour storm event is used to determine the minimum required treatment volume of the proposed SCM(s). Please also ensure that the proposed SCM promotes infiltra?on of flows and groundwater discharge as required per 15A NCAC 02B .0602 (Goose Creek Rules). It is recommended to revise the stormwater treatment summary, narra?ve, and SCM details as needed to meet all of the requirements of the Goose Creek Rules. If it is not possible/prac?cable to promote infiltra?on, a wri?en explana?on should be provided. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. 5 If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per statute. Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1636 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 6