HomeMy WebLinkAboutNCG060447_Cover Letter (Signed)_20240122 iw A?
d :�xexQ
ROY COOPER
Governor
ELIZABETH S.BISER
Secretary
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
January 22, 2024
Amazon.com Services LLC
Attn: Belinda McDowell
PO Box 80842
Seattle, WA 98108
Subject: General Permit No. NCG060000
Amazon.com Services LLC—DCD6
COC No. NCG060447
Mecklenburg County
Dear Belinda McDowell:
In accordance with your application for a discharge permit received on December 12,2023,we are forwarding
herewith the subject certificate of coverage (CDC) to discharge under the subject state—NPDES general permit.
This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the
Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated
October 15, 2007 (or as subsequently amended).
In order to comply with the conditions of NCG060000 to which you are now subject,you are required to do the
following:
➢ Develop and Implement a SWPPP within 12 months of permit issuance.
➢ Download and print a copy of the NCG060000 Permit from the General Permits page on the NPDES
Industrial Stormwater Program web site,which can be reached by typing"deg.nc.gov/SW-industria11
into your browser and hitting enter.
➢ When you receive an invoice for your annual permit fee each year, pay it promptly. Electronic payment
is convenient and quick,you can access the ePayment web site by typing"deg.nc.sov/SW-ePayments"
into your browser and hitting enter.
➢ If you have not already enrolled in electronic Data Monitoring Reports (eDMR),view the six step
process and complete the registration by typing "deg.nc.gov/SW-eDMR" into your browser and
hitting enter.
➢ Keep information about your facility name,ownership, legally responsible person, address, and
stormwater outfalls up to date. See the Industrial Stormwater Program web site for instructions.
➢ Per the requirements of the Catawba Riparian (streamside) Buffer Rule (15A NCAC 02B .0243),all
stormwater runoff into the riparian buffer shall meet dispersed flow requirements of 15A NCAC
02H .1002 for portions of the project built after June 30, 2001. Also, drainage conveyances (drainage
ditches, roadside ditches, and stormwater conveyances)through riparian buffer must meet
requirements-of the_Catawba_Riparian buffer-rules,_per_15ANCAC_02B-0243—
North Carolina Department of Environmental Quality I Division of Energy.Mineral and Lord Resources
11 512 North Salisbury Street ; 1612 Mail Service Center I Raleigh,North Carolina 2 769 9-1612
919.707.9200
a""aTEo
ROY COOPER i
Governor
ELIZABETH S.BISERa M ma,
Secretary
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
Please take notice that this certificate of coverage is not transferable except upon approval from the Division of
Energy, Mineral, and Land Resources (Division). The Division may require modification or revocation and
reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Water Resources, the Coastal Area Management Act, or any other federal or local government permit
that may be required.
If you have any questions concerning this permit, please contact Brittany Cook at(919) 707-3648 or by email at
britta nv.cook(ZD ncde n r.eov.
Sincerely,
cVJ �m�
Britta y Cook
NPDES Stormwater Permit Coordinator
Division of Energy, Mineral,and Land Resources
cc: Mooresville Regional Office/J. Eplin
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
70AD�M� 512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
'� tn:,e®w�ro V 919.707.9200