Loading...
HomeMy WebLinkAbout20071222 Ver 2_More Info Letter_20071105~ W A T~ Michael F. Easley, Governor ~Q ~~ ~ ( etar S R J Willi G ,` i Vj r y ecr oss r., am . North Carolina Department of Environment and Natural Resources ~ .~ p ~ Coleen H. Sullins, Director Division of Water Quality November 5, 2007 DWQ Project # 07-1222, Ver 2 Johnston County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Taylor Blakely Blakely Design Group 700 Exposition Drive Raleigh, NC 27615 Subject Property: Smithfield Heart and Vascular Associates Ut to Buffalo Creek [030402, 27-42, C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Blakely: On September 14, 2007, the Division of Water Quality (DWQ) received your application dated September 5, 2007, to fill or otherwise impact 25 linear feet of perennial stream and 1,200 square feet of Zone 1 Neuse River basin protected riparian buffers. On September 26, 2007, the DWQ received additional information regarding this project. The DWQ has reviewed the stormwater management plan that has been approved by the Town of Smithfield per their letter dated August 24, 2007. On August 20, 2007, the DWQ initiated a new policy by which stormwater management plans that have been approved by a local government that is implementing astate-mandated stormwater program do not typically require additional stormwater approval from the DWQ for the issuance of a 401 Certification. Notwithstanding this new policy, DWQ reserves the right to review individual stormwater management plans on a case-by-case basis in order to ensure that a proposed activity will not violate water quality standards. On this project, the DWQ will require a stormwater management plan that complies with the stormwater management provisions of the 401 Certification program as codified in General Certification 3631. The DWQ has made this decision on the following bases: • The high level of impervious surface currently proposed on the site (35 percent) as well as the intent to add additional-impervious surface in the future. The sensitivity of the watershed as a nutrient sensitive water (NSW). The lack of water quality controls on the locally approved stormwater plan as well as the failure of the locally approved plan to account for the nutrient loading associated with the future development plans for this site. 401 Oversight/Express Review Permitting Unit 1650 Mai] Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: h t -h2o.enrstate.nc.us,'ncwetlands No°C Carolina ~Eura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Blake Design Group Page 2 of 3 November 5, 2007 Based on the reasons stated above, the DWQ is requiring that a stormwater management plan that complies with General Certification 3631 be submitted for review and approval. General Certification 3631 requires that projects that are over 30 percent impervious provide stormwater BMPs that treat the runoff from the entire site to a minimum standard of 85%TSS removal and 30% total nitrogen and total phosphorus removal. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please provide stormwater BMPs that removal a minimum of 85%TSS and a minimum of 30% total nitrogen and total phosphorus. The BMPs must be designed according to the latest version of the DWQ BMP Manual. The BMPs should be sized to handle the stormwater from the entire site as currently proposed. If the BMPs are not large enough to handle the flows from the future building planned on this site, then a modified stormwater plan will have to be submitted to DWQ for approval prior to the construction of any future buildings. 2. Please provide a separate BMP Supplement Form for each proposed BMP on the project. Both worksheets must be submitted (Design Summary and Required Items Checklist) along with all of the required items. The new BMP Supplement Forms are available at: http•//h~o enr.state.nc.us/su/bmp forms.htm. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter and an extension has not been requested, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm/aml Blake Design Group Page 3 of 3 November 5, 2007 cc: Lauren Cobb, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Jamie Guerrero, PNT Environmental Consultants, 34 Castlewood Drive, Clayton, NC 27520 G. Marty Anderson, Town of Smithfield, Public Works Dept., 230 Hospital Road, P.O. Box 761, Smithfield, NC 27577 Filename: 071222Ver2SmithfieldHeartAnd VascularAssociates(Johnston)On_Hold2