HomeMy WebLinkAbout20071760 Ver 1_More Info Letter_20071105_ __ _ ,,
~~F W A TF~p Michael F. Easley, Governor
`(~ li William G. Ross Jr., Secretary
fp ~ North Carolina Department of Environment and Natural Resources
~ ~
~ „~ Coleen H. Sullins, Director
Division of Water Quality
November 5, 2007
DWQ Project # 2007-1760
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Reverend John J. Wilkins, Jr.
3805 Tarheel Club Road
Raleigh, NC 27604
Subject Property: Wake Chapel Church
UT to Neuse River [030402, 27-(22.5), C, NSW]
REQUEST FOR MORE INFORMATION
Dear Reverend Wilkins:
On October 17, 2007, the Division of Water Quality. (DWQ) received your application dated October 9,
2007, with additional information received October 25, 2007 to impact 300 square feet (ft2) of Zone 1 of
the protected riparian buffers and 200 square feet (ft2) of Zone 2 of the protected riparian buffers to
construct the proposed level spreader and bypass. The DWQ has determined that your application was
incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional
information in order to process your application to impact protected wetland, streams and/or buffers on
the subject property. Therefore, unless we receive the additional information requested below, we will
have to move toward denial of your application as required by 15A NCAC 2H .0506 and 2B .0233(8) and
will place this project on hold as incomplete until we receive this additional information. Please provide
the following information so that we may continue to review your project.
Additional Information Requested:
1. Since this submittal was made after October 1, 2007, the use of the new BMP Supplement Forms
is required. Please provide a separate BMP Supplement Form for each proposed level spreader
and dry detention pond. Both worksheets must be submitted (Design Summary and Required
Items Checklist) along with all of the required items. The new BMP Supplement Forms are
available at: http://h2o.enr.state.nc.us/su/bmp forms.htm.
2. Please provide the new forms for Inspection and Maintenance (I&M) of BMPs. These are also
available at the above web site. An original signature on the I&M forms is required.
Please respond within three weeks of the date of this letter by sending this information to me in writing
and Lauren Witherspoon of the DWQ Raleigh Regional Office. If we do not hear from you within three
weeks, we will assume that you no longer want to pursue this project and we will consider the project as
withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not ore
No Carolina
401 Oversight/Express Permitting Unit
]650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: htto'//h2o.enr.state.nc.us(ncwetlands
~tura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Reverend James Wilkins
Page 2 of 2
November 5, 2007
authorized (at this time) by the DWQ. Please call Cyndi Karoly or Amy Chapman at 919-733-1786 if
you have any questions regarding or would like to set up a meeting to discuss this matter.
Sincerely,
l~
Cyndi Karoly, pervisor
401 Oversight/Express Review Permits Unit
CBKlijm/asc
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
Niki Maher, NPS Compliance Unit, DWQ
Jay Keller, Keller Environmental, 7921 Haymarket Lane, Raleigh, NC 27615
File Copy
Central Files
Filename: 071760 WakeChapelChurch(Wake)NB R_On_Hold