Loading...
HomeMy WebLinkAboutSW8921019_Annual Certification Summary (2024)_20240117 Section A-Project Information Permit Number: SW8921019 Project Town/City: Shallotte Project Name: Brunswick Electric Membership Corporation Corporate Facility Project County: Brunswick Permit issued: 10/17/2019 Project Status: completed Section B-Permittee Information Name: Brunswick Electric Membership Corporation Street Address: Mailing Address: Signing Official: Joshua Winslow 795 Ocean Hwy West PO Box 826 Title: CEO Phone Number: 910-754-4391 Ext. Supply,NC 28462 Shallotte,NC 28459 Email Address: joshua.winslow@BEMC.ORG Section C-Property Owner Information Name: Brunswick Electric Membership Corporation Street Address: Mailing Address: Signing Official: Justin Pruitt 795 Ocean Hwy West P.O.Box 826 Title: MGR.Facilitites Phone Number: 910-540-8204 Supply,NC 28462 Shallotte,NC 28459 Email Address: justin.pruitt@bemc.org Section D-Site Conformance with Permitting Conditions Max BUA not exceeded? Yes Veg.setbacks per plans? Yes Site is as shown on plans? Yes SCM BUA not exceeded? Yes Easements recorded? Yes Designer Cart.submitted? Yes Lot BUA not exceeded? NA O&M Agreemt recorded? Yes O&M being performed? Yes BUA as shown on plans? Yes O&M Agreemt on plats? Yes No maintenance issues? Yes SCM/LD area per plans? Yes Deed Restrict.recorded? Yes Maint.records being kept? Yes SCM/LD area accessible? Yes O&M done per E&SC? NA Permit is active? Yes Stormwater outlets stable? Yes SCMs fixed when done? Yes Other conditions met? Yes See Attachment A for a list of all N/A explanations to the above items. Section E-Plan to Bring the Project info Conformance Project is in conformance with all permit conditions. Section F-Project Certifier Information Certifier Signing: Joshua Winslow Street Address: Mailing Address: Title: CEO 795 Ocean Hwy West PO Box 826 Phone Number: 910-754-4391 Ext. Email Address: josh.winslow@bemc.org Supply,NC 28462 Shallotte,NC 28459 Section G-Certification The information in this form is true,accurate,and complete? Yes The project is in conformance with all permit conditions? Yes Electronically signed by Joshua Winslow on January 17,2024. ATTACHMENT A Explanation about why"N/A"items above are not applicable to this project. Max BUA not exceeded N/a: SCM BUA not exceeded N/a: Lot BUA not exceeded N/a: We are a commercial facility/public business BUA as shown on plans N/a: SCM/LD area per plans Nla: SCM/LD area accessible N/a: Stormwater outlets stable N/a: Veg.setbacks per plans N/a: Easements recorded N/a: O&M Agreemt recorded Nla: O&M Agreemt on plats N/a: Deed Restrict.recorded N/a: O&M done per E&SC N/a: Construction is complete SCMs fixed when done N/a: Site is as shown on plans N/a: Designer Cert.submitted N/a: O&M being performed N/a: No maintenance issues N/a: Maint.records being kept N/a: Permit is active N/a: Other conditions met N/a: