Loading...
HomeMy WebLinkAboutSW6231204_Application Form_20240117 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Runoff from the development will be collected into various drop or curb inlets across the site which will discharge to a perimeter ditch by the shortest route possible.Much of the stormwater will discharge directly into this ditch by flumes along the concrete curb.The ditch will discharge south of the project site. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 64.7 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area(4) -Total Coastal Wetlands Area(5)-Total Surface Water Area(6) =Total Project Area+:64.7 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHVV)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW(or MHi'9 line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/ Total Project Area)X 100 =6.0 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ Receiving Stream Name Stewarts Creek Stream Class * C Stream Index Number* 18-31-21 Total Drainage Area(sf) 2,818,716 On-site Drainage Area(sf) 2,818,716 Off-site Drainage Area(sf) 0 _ Proposed Impervious Area**(sf) 169,040 % Impervious Area**(total) 6.0 Impervious""Surface Area Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ On-site Buildings/Lots(sf) 7,168 On-site Streets (sf) 119,099 On-site Parking (sf) On-site Sidewalks (sf) 10,186 Other on-site (sf) Future(sf) 7,616 Off-site (sf) Existing BUA***(sf) 24,971 Total (sf): 169,040 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas, sidewalks,gravel areas, etc. Form SWU-101 Version Oct.31,2013 Page 3 of 6