Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6230702_Plansheet - 7 Proposed Conditions/Site Plan_20240116 (4)
� � I 0 F� PAVEMENT STRIPE X H� I� � J THOMAS ENGINEERING, INC. BEGIN DEPARTURE TAPER PC STA: 12+74:06 (MINI-SKIP WHITE) I ri G" I O STA: 1i+34.5 PT STA: 16+59 15 � � STA: 34.5 L R= 1750.00' I �l CIVIL ENGINEERING & PLANNING OFFSETL=385.09' BEGIN APPROACH TAPER Q1 T= 193.33' STA: 17+11.6 STA: 18+21.1' BEGIN PAVEMENT OVERLAY A= 12°36'30" OFFSET: 16.1' L OFFSET: 18.0' L STA 11+35 STA: 18+31.5 END APPROACH TAPER STA: 16+93.3 C STA: 20+71.5 OFFSET: 18.0' L _ PAVEMENT STRIPE N END DEPARTURE TAPER � � OFFSET:4.0' L - I � � � N50°59'47"E OFFSET: 12.0' L 143 Charlotte Avenue, Suite 104 _ (SINGLE WHITE) PAVEMENT STRIPE STA: 14+94.5 491.79' N63°36' 16°E _ _ (SOLID WHITE) OFFSET: 18.0' L �� \\I Ln F_ Sanford, North Carolina 27330 274.06' _ d PAVEMENT STRIPE \ 1> // CABLE _ - (919) 777-6010 phone 10+pp U I \ FULL LEFT TURN LANEJz - _ a I V W Y / (L = 50') �� (SOLID WHITE) Q /-O - + 21+5 m _ 27 � d FULL LEFT TURN LANE u~i \\ d APPROACH TAPER L= 360' 21 I00 i� WWW.jthOmaSenglneering.COm _ R / PRO. EP 20+00 license no. C-3389 - 11+pp - DEPARTURE TAPER L � o I12+00 0) PRO. EP X. EP _ - - R END - _ _ _ _ - - T7+1J0 - DE q TUR L STA: zo+71.s STA 20+71 OVERLAY E TA ER = ` END DEPARTURE TAPER - APPRO H TAPER + _ i PRO. EP 0 \�f �I OFFSET: 12.0' R AC ALIGNMENT TIE I _ (L - 360') _ EX EP +00 -1 I'll - - � STA: -10+00.00 - - 50' µv 5 U N: 581945.301 I - _ - - - - - _ _ d E: 2020792.882 BAY TAPER (L = 200' N - PAVEMENT STRIPE (SINGLE WHITE) E �✓L BEGIN BAY TAPER PR STA: 15+81.3 (DOUBLE YELLOW) BEGAN APPROACH TAPER v t OFFS • 1"A STA: 12+44.5 - _ _ STA: 16+31.3 9 STA: 11+34.5 OFFSET: 13.9' R H OFFSET: 6.0' R BEGIN DEPARTURE TAPER -� I OFFSET: 12.2' R O. T to X 70 SIG STA: T: 1 .0' PAVEMENT STRIPE iN TRIANGLE OMS ■ OFFSET: 18.0' R ILEONARD MC (MINI-SKIP WHITE) ■ COMAS I D B' 3966 STA: 14+44.6 - SPENCE 1 769 OFF ET: R KENDALL G� o � THOMAS P PAVEMENT STRIPEPROFESSIONAL ENGINEER'S SEAL IMAP# (DOUBLE YELLOW) / 1,11 END APPROACH TAPER (A PG,512 2007-216 b END FULL TURN LANE 3 STOP' SIGN DB, 927 , PIN END BAY TAPER STA: 14+94.9 0528-11-2502 000 / OFFSET: 30.0' R 8348,000 I BEGIN FULL TURN LANE = PIN �� STA: 14+44.5 0 5 2 8-1 OFFSET: 28.8' R I a / WIDENED PAVEMENT AT ENTRANCE I TO SMITH FARMS DRIVE I 3 I (SEE SHEET 4) (A 1 67 o U a m Z � z I 40 0 20 40 80 a Z J PROPOSED WIDENING / TURN LANES FOR NC 27 W 0 � LAYOUT PLAN SCALE: 1" = 40' >_ a w CL a V Qz I � � >= J 0 3 = a in J = H z � ► X �X P�' W W °C I 0 M, / r, � ( DISCHARGE PRO. O ' �� DITCH TO EX. DITCH 4 �P RE-GRADE ROADSIDE DITCH 3 DISCHARGE PRO. MAINTAIN EX. DITCH LT MAINTAIN EX. DITCH LT DITCH TO EX. DITCH �/ o 1 I STA 14+60 - STA 15+50 / STA 11+35 - STA 13+00 Jz 1> // �\ �\ CABLE IF- � V 21+51 (A imon 10+00 _ - -j - w� -=� --='�z-� - ---I_�f_ H � Y � 7 / d�24,a ' i' ! \\✓\ d /� 21i00- �� z 0 60 - -- ---_�-__- __-- --- _ R / �,,/ 20+00 _ - - I I / _ - _�--_ �- --_ _ -z �5�_ ,H.. / G.v. - \•o - - a - W • V I Ln 12+ p - _ _ _ -- --�J �i� -G _ /�i `1/ - EX. EP _ _ w - r l w w ' l _-- EX. EP - - _ +� - - - - 1\- - "/ _= _ _ w - - w - - � v___ NONE z --- w _ .ram �� \� O - 15+00 - -- ----- +_ gWVA-TERLIN�� O J� �f i W w-�_ - - --- LU � L W REPLACE EX. JB WITH TRAFFIC RATED JB t T M �-- _ /I I I� NCDOT STD DWG 840.34 0 I 16 LF- 24" RCP @ 0.5% MIN �2 \ W Oj IGN © INV OUT EL = 237.3 O a�i I LEONARD \\ ``_- SPENCE -JR. MCC❑ I D.B. 3966 PG MAS �� - '' o ' i l �� \� y THOMAS KENDALI i 769 \ Q. I MAP# ,7z 2007-216 to / /' DB, 927 , PG,512 I PIN 0528- - -, I / I / ROCK OUTLET PROTECTION 11 r�fla nnn / I / / / NCDOT STD DWG 876.02 -8348,000 L = 12' PIN 0528-12 REVISIONS ROADSIDE / SPECIAL DITCH SCHEDULE In / CLASS 'B' RIP RAP y ROAD SIDE BEGIN STATION END STATION DRAINAGE AREA 10-YEAR FLOW BOTTOM WIDTH (BW) DEPTH (D) LENGTH SIDE SLOPE (Z) AVE. SLOPE LINING D/ / SHAPE UP EX. DITCH, MAINTAIN DIMENSIONS, GRADE TO = OR DITCH ID (STA) (STA) (AC) (CFS) (FT) (FT) (FT) (Z:1) (%) I DRAIN, SEED WITH GRASS AND LINE WITH N.A.G. SC75BN RT 11+35 15+08 0.3 1.1 0 1.5 373 3 / 2 (BACKSLOPE) 1.9 GRASS W/ N.A.G. S75BN / �U LT 13+00 14+60 0.6 1.9 0 1.5 160 3 / 2 (BACKSLOPE) 0.9 GRASS W/ N.A.G. S75BN LT 15+50 16+75 0.4 1.5 0 1.5 125 3 / 2 (BACKSLOPE) 2.6 GRASS W/ N.A.G. S75BN RT 15+65 17+55 0.1 0.4 0 1.5 190 3 / 2 (BACKSLOPE) 3.2 GRASS W/ N.A.G. S75BN -�4- / LT 18+40 19+50 0.3 1.1 0 1.5 110 3 / 2 (BACKSLOPE) 1.5 GRASS W/ N.A.G. S75BN / a 40 0 20 40 80 PROPOSED WIDENING / TURN LANES FOR NC 27 STORM DRAINAGE PLAN SCALE: 1" = 40' Q z W Ell W z 0 J SHOULDER z 2"ASPHALT SURFACE COURSE, NCDOT TYPE S9.5C(OVERLAY) 2„ 7. 60' 3"ASPHALT INTERMEDIATE COURSE, NCDOT 119.013 7 o 3" N VAR. VAR(4.5' MIN) 4.0' VAR(0'TO 6) -12' -12' VAR(U TO 6') VAR(U TO IT) 4.0' VAR(4.5' MIN) VAR. EX GROUND j EX GROUND I DITCH DITCH GRASS SHLDR SYMMETRICAL SYMMETRICAL TURN LANE RASS SHLDR DITCH DITCH 5"ASPHALT INTERMEDIATE COURSE, NCDOT B25.0B 7 I� BACKSLOPE FORESLOPE WIDENING FOR WIDENING FOR FORESLOPE BACKSLOPE - - W LEFT TURN LANE 2"OVERLAY LEFT TURN LANE SUBGRADE III-III-III-III-I AGENCY REVIEW ONLY MATCH EX. 4% BREAKOVER MAX. �P�� (98%MIN.STANDARD PROCTOR,TOP V) - -I OU CROSS SLOPE 1/4"/FT E121 (95%MIN.STANDARD PROCTOR,BELOW TOP 1') III-III-III- T S<Op MATCH EX. (VAR) (TYP) -III- F(2.7M CROSS SLOPE EX.CROSS SLOPE(VAR) /� Gv R �kJ (VAR) << NOTES: 1 P�1 EX.PAVEMENT `S<OJO Scale: Drawn by: o SEE DETAIL FOR PAVEMENT DESIGN (2 7 �OQ�l2. a Mg17 1. PAVEMENT DESIGN TO BE APPROVED BY NCDOT. SEE SCALE BAR JRT > 2. REFER TO TYPICAL SECTION OF TURN LANE ON THIS SHEET. Q -- DRIVEWAY CULVERT(TYP LOCATION) 3. PAVEMENT DESIGN TO BE USED FOR PORTION OF PRO. SMITH FARMS DRIVE IN EX. Sheet: D2Slgned by: IN 27 R/W. SEE DETAIL C-13 FOR PAVEMENT DESIGN OF SUBDIVISION ROADS. JRT o DRIVEWAY CULVERT(TYP LOCATION) "' a c DITCH FLOWLINE(SEE PLAN FOR LOCATION) 5 0 2.5 rJ 10 Reviewed by: DITCH FLOWLINE(SEE PLAN FOR LOCATION) PAVEMENT DESIGN FOR WIDENING ON NC 27 7 of 21 JRT j PAVEMENT WIDENING (ON NC 27) TYPICAL SECTION SCALE: 1 5 Project Number: Date: = a� 22-004 01 MAY 2023