Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ross Barefoot 82-521
Type of Visit: ©'Compliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: .a'Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: %(s r} Arrival Time: i /„'/ Departure Time: County: Region: 1C;e0 Farm Name: _ _ %3L�u .(� Owner Email: Owner Name: �Po Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Title: Phone: Integrator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: t4$', "b YT?p44N 4a.,.E4u-. K. n.0 4b 44P 04 &, i4#4 4i4f 'b #88roAaH&Ux9*,Y#>wxa aHHH K4H»`-§#rr a6�,,#R#,�a a%.8€xrimna 'i rixs H#.'€Yffi.t.Y,rt*F6d#9'4x �b er A4g-x k2L• esl¢¢m ��tt nnRents H6#imtr#nka w# ex?+rd#d#ae5 kgitt cr§$�Hpy'#yt#W&•dF 3-±AfW�45l.nrYl:W4ridr. B##R #}^.z#p axM YlbNeR%.ItT,Pctt,*t�Sy�R'%#4R#A},{%S##3YR<&.AY 43)aRSw,%Y$a5•-;taSar F4Y3'Aii.#iF#'6§b d to a (v&NNk�tJ%AP Ma 93 H#k#'§#.YvaSt+COult€r.y, Hr ya a6kt%'s aUcdl li x: M aas As ro�a*A �%9� zro nx uW ,0*41+s§H 5 d.Y 4t'R 3'A s}# es #H % ? HiA#J.5:Xy�4µ&AiP#ura9&+w t%*&3dai 64#4As A•••oot,sm# a A.#sA p A sa �§x a 9C # t4 P%k Y. h5&6#;ea as # '# & " 9Kw RP }}kk #H 0.•%#'1#k###83k xH8, VAd##%-0:Y $i#qt #. 4P# %.4%aH It0-t' 4f x$•%i ## « H#�s a# are %P Wean to Finish La er y 1g Dairy Cow Wean to Feeder as Non Layer Dairy Calf s Feeder to Finish #r #t§€###%a} # a rs ( .. §#altar ali„o,4's lamer*#jx r A DairyHeifer Farrow to Wean§', AH AausAA%#• #a% ease§ § r• haws#msasax#H ar�S a a«u#§xax aaag'.. Dry Cow #A Farrow to Feeder % saaAHH#.�•.#. Non-Dairya Farrow to Finish � � Layers Beef Stocker At Gilts', Non -Layers ¢1* BHA Beef Feeder to # Boars O'A Pullets # Beef Brood Cow Ni #s x *a t4%i# Oil Turkeys tootoo Akfib.Y#6#3'}% d y H<# #« # .+�F#+#€4# «a$'. pig bS'R. p4 we4+d tk ax to t}bw zE%Cxtl*x.4k#A4S&####%R&1¢. % t to, E#t4.wh} tJtrler§.>'xi w€#SN Y# 54b :k d'%±m#aWai#Y:bYd6463 A ib@.£�ixd NAP-, �..,,��.,. «§t §te aara§##m�a}oAs Turkey Poults 4Aa#aa§Aaa waaAa mAa a�AAxka sa}Aael##&24' Other anAAasaaaad�r:aa#"�Yv€a&gi°a#'a##sa,. -'sAs uaHNau#N*#R.t#4 #e�EEA§#,+ S%}a& a46kHa oU kt Uba #e Yfbo#,VWfrvA4 Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3, Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes E]'No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes'rNo ❑ NA ❑ NE ❑ Yes 2No [:]NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: - csvZ / Date of Inspection: 17t Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ':allo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 7 V �- Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ETNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ['No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ENo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ,❑'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require �❑ I es ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ETNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s) 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes EfrNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑/ "No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑'No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes L'No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 12'No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ,FNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. 'Ej'No ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E�rNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [—]Yes ❑/'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [—]Yes 0"No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: Date of Inspection: lIr 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ..e'No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ,❑-No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ NA ❑ NE ❑ NA ❑ NE 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 4�'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes E7No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Q o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑'No ❑ NA ❑ NE ❑ Yes J'No ❑ NA ❑ NE ❑ Yes En -No ❑ NA ❑ NE ❑ Yes E�No ❑ NA ❑ NE ❑ Yes En No ❑ NA ❑ NE ❑ Yes F.:�No ❑ NA ❑ NE 440e_� Aeco 6 I t Ild-IM c) cow 0_69;P� � ,9v&r-FLOW�r7�dl / r� d l/ 'l p � f] v�d` FLDU/ � ���' ��; l l d � Ca-n��r7�ro�• Reviewer/Inspector Name: Q iq n e° 77 f— e /5'1) J 6u , Phone: 'Flee) $-%/1, Reviewer/Inspector Signature: 2 z'nt Date: Page 3 of 3 511212020