HomeMy WebLinkAbout090040_POA for high freeboard_20240118PLAN OF ACTION (POA) FOR HIGH FREEBOARD ATr((?ANIMAL FACILITIES
Facility Number. _ - ��t? County: iafiar)
Gracility Name: � � Do F� ni-) )) r
Certified Operator Name: ..... . I. . U Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways,
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Namelidentifier (ID): 4
Spillway (Yes or No):
Level (inches): ! cfr
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section Ili tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: V
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information Is accurate and correct.
(print)
(signature)
Phone: q1D . 0614- 1141.
Date: 1/ g f -)-q
Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: A & H Hog Farm
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m = 538.7 lb PAN
line m = lb PAN
line m = lb PAN
r u 17b1kl1
line m = lb PAN
line m = lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 538.7lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2PAN
balance
(Ib/acre)
t. TOTAL PAN
BALANCEFOR
FIELD (Ib%)
column r x s
u. application
,n,indo„y'
3235
Field 1
overseed
7.65
50.00
382.5
Sept -Mar
3235
Field 2
overseed
11.34
32.00
362.9
Sept -Mar
*** guestimate on PAN left*****
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 745.4 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 538.7 lb. PAN
x. Crop's remaining PAN balance (line v from section III) 745.4 lb. PAN
y. Overall PAN balance (w -x) = -207 lb. PAN
Line y must show as a deficit. If line y does not showas a deficit, list course of action here including
pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options,
recalculate new PAN based on new information. If new fields are to be included as an option for lowering
lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If
animal waste is to be hauled to another permittedfacility, provide information regarding the herd
population and lagconfreeboard levels at the receiving facility.
NARRATIVE:
Will pump as soon as conditions allow.
PoA (30 Day) 2/21/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
A & H Ho Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
16.0 inches
19.0 inches
3.0 inches
102856 ft2
192341 gallons
180 days
g. volume of waste produced according to structural design 121058 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 10/19/23
m. ((lines e + kU1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121058 ft3
Oft3
62270 ft3
228549 gallons
1.28 Ibs/1000 gal.
538.7 Ibs. PAN
PoA (30 Day) 2/21/00