Loading...
HomeMy WebLinkAbout090102_POA high freeboard_20240110OF& PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: R - P ba County: 81ijen Facility Certified Operator Name: Operator # 1. Current liquid level(s) in inches Las measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon NamelIdentifier (ID): 1 Spillway (Yes or No): Level (inches): 0� 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. y Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: __ I / b 2 i hereby certify that i have reviewed the information listed above and included within the attached Plan of Actipnand to the best of my knowledge and ab llitv.tbe-information is accurate and correct. 'hone: �j m Facility YlwneHMana"r (slgnaturs) PoA Cover Page 2121100 910-8?q- 6�oo II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Neill Jackson (9-102) line m = 3.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines I + 2 + 3 + 4 + 5 + 6 = line m = Ib PAN line m = lb PAN line m = lb PAN 3.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN nM=!^n nA uAT I ICY CICI nC TA VJUIPN DAId CArdrAAT RD ADPI Ian nl lPildr THIS in nAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) I. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application windm' 903 5366 overseed 10.50 25.00 262.5 10/1-3/31 ** uesimate on PAN 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 262.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 3.3 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 262.5 Ib. PAN Y. Overall PAN balance (w-x)= -259 lb. PAN NARRATIVE* Will begin pumpingassoon asfield conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Neill Jackson 9-102 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 17.0 inches 19.0 inches 2.0 inches 55517 ft2 69211 gallons 180 days g. volume of waste produced according to structural design 43255 ft3 h. current herd # 3804 certified herd # 3804 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines In + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10l19/23 m. ((lines e + ku1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 43255 ft3 �ft3 34653 ft3 97125 gallons 0.02 Ibs/1000 gal. 3.3 Ibs. PAN PoA (30 Day) 2/21/00