HomeMy WebLinkAbout820096_POA 5 day and 30 day_20240117PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-96 County: Sampson
Facility Name: Mike Matthis Farm
Certified Operator Name: Mike Matthis Operator Number: 20862
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
N
10.5
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially orfully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 1/17/24
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Mike Matthis
Phone: 9109909610
Facility Own�errj/M�/anager (print)
�P1r"1 olb/0 /41- Q �Gf�"i"{'�, -S Date:
Facility r1ya er(signature)
1 /17/24
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon #1
line In =
684.1 lb PAN
2. Structure ID:
line In =
lb PAN
3. Structure ID:
line In =
lb PAN
4. Structure ID:
line In =
lb PAN
5. Structure ID:
line In =
lb PAN
6. Structure ID:
line In =
lb PAN
n.lines 1+2+3+4+5+6=
684.1 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
Pr Pinn Inn WWI ICT FIFI nS Tn WHICH PAN CANNr1T RF APPI IFn n11RINr9 THIS 3n ❑AY PFRIOn_
o. tract #
p. field #
q. crop
r. acres
s. remairirg IRR-2
PAN balance
(Iblmre)
I. TOTAL PAN
BALANCEFOR
FIELD (Ibs.)
column rxs
u.applicslimwindowr
6242
p2
sq
2.40
75.00
180.0
oct-mar
6242
P1
sq
2.11
75.00
158.3
oct-mar
6242
p6
sq
3.24
60.01
194.4
oct-mar
6242
P9
sq
1.05
75.00
78.8
oct-mar
62421
p3
sq
3.96
75.00
297.0
oct-mar
6242
p4
sq
2.70
51.20
138.2
oct-mar
6242
P8
sq
1.08
75.00
81.0
oct-mar
6242
plo
sg
0.95
75.00
71.3
oct-mar
6242
nel
sq
0.85
75.00
63.8
oct-mar
6242
ne2
sq
0.74
75.00
55.5
oct-mar
6242
ne3
sq
1.13
75.00
84.8
oct-mar
6242
ne4
sq
1.90
75.00
142.5
oct-mar
6242
ne5
sq
0.67
75.00
50.3
oct-mar
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1595.7 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 684.1 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1595.7 lb. PAN
y. Overall PAN balance (w -x) = -912 lb. PAN
ymust showas a deficit. If line y does not showas a deficit, list course of action here including pump and haul,
rpulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
nation. If new fields are to be included as an option for lowering lagoon level, add thesefieldsto the PAN balance
PDA (30 Day) 2/21/00
table and recalculate the overall PAN balance. It animal Waste is to be hauled to another permitted taCRlly, provide
information regarding the herd population and lagoon freeboa rd levels at the receiving facility.
onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day) 2121 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line to - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
10.5 inches
19.0 inches
8.5 inches
95400 ft2
505461 gallons
180 days
g. volume of waste produced according to structural design 122939 ft3
h. current herd # certified herd # 3720
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines In + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/12/24
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
ft3
ft3
55650 ft3
69377 gallons
1.19 Ibs/1000 gal.
684.1 Ibs. PAN
PoA (30 Day) 2/21/00
II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: Lagoon 1
2.
structure ID:
3.
structure ID:
4.
structure ID:
5.
structure ID:
6.
structure ID:
n. lines 1+2+3+4+5+6=
o. line n / 27154 =
line I=_ 100762_gallons
line I =
gallons
line I =
gallons
line I =
gallons
line I =
gallons
line I =
gallons
100762 gallons
3.71 acre -inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD'A
'While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste.
p. tract #
q. field #
r. soil type
s. crop
t. acres
u. remaining
IRR-2 PAN
balance
(lblacre)
V. maximum
application rate
(Inw)
W. maximum
application amount
(inches)
6242
P2
Ch
SG
2.40
75
0.6
1
6242
P1
Ch
SG
2.11
75
0.6
1
6242
P6
WaB
SG
3.24
60.01
0.6
1
6242
P9
Ch
SG
1.05
75
0.6
1
6242
P3
Lm
SG
3.961
75
0.41
1
6242
P4
WaB
SG
2.70
51.2
0.6
1
6242
P8
WaB
SG
1.08
75
0.6
1
6242
P10
Ch
SG
0.95
75
0.6
1
6242
NE1
Ch
SG
0.85
75
0.6
1
6242
NE2
Ch
SG
0.74
75
0.6
1
62421
NE3
Ch
ISG
1.13
75
0.6
1
6242
NE4
Ch
SG
1.90
75
N
1
62421
NE5
Ch
SG
0.67
75
0.6
1
x. total acres available during 5 day draw down (sum of column t) = 22.78 acres
IV. FACILITY'S POA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
Y. line o = 0.16 inches per acre to be applied within 5 days
line x
If unable to land apply hydraulic load listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump 8r haul and herd reduction options,
has been reduced down to 0 animals and regular irrigation has already been commenced.
PoA (5 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I La oon 1
2. Current liquid volume in structural freeboard
a. current liquid level according to marker 10.5 inches
b. designed structural freeboard zone
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd # certified herd # 3720
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h+ I +j) x 7.48 x 5 days/line f=
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k =
l 2.01 inches
1.5 inches
95400 ft2
89199 gallons
180 days
122939 ft3
ft3
0 ft3
55650 ft3
11563 gallons
100762 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21 /00