Loading...
HomeMy WebLinkAbout820096_5 day POA high Freeboard_20240103II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Lagoon 1 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1+2+3+4+5+6= o. line n 127154 = line I = 338626 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 338626 gallons 12.47 acre inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remairong IRR-2 PAN talame (INacre) V. maximum application rate (Ir") W. maximum applimfimamwnt (imtas) 6242 P2 Ch SG 2.40 75 0.6 1 6242 P1 Ch SG 2.11 75 0.6 1 6242 P6 WaB SG 3.24 60.01 0.6 1 6242 P9 Ch SG 1.05 75 0.6 1 62421 P3 Lm ISG 3.96 751 0.4 1 6242 P4 WaB SG 2.70 51.2 0.6 1 6242 P5 WaB SG 3.03 75 0.6 1 6242 P7 WaB SG 2.91 75 0.6 1 6242 P8 WaB SG 1.08 75 0.6 1 6242 P10 Ch SG 0.95 75 0.6 1 6242 NE1 Ch SG 0.85 75 0.6 1 6242 NE2 Ch SG 0.74 75 0.6 1 6242 NE3 1 Ch SG 1.13 75 0.6 1 6242 NE4 Ch SG 1.90 75 0.6 1 62421 NE5 Ch JSG 1 0.671 751 0.61 1 x. total acres available during 5 day draw down (sum of column t) = 28.72 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE Y. line o = 0.43 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed In line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, Herd has been reduced down to 0 animals and regular irrigation has already been commenced. PoA (5 Day) 2/21/00 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation �;CIG1 Con/�l'j;on �S gV44e. V oc ij.. �r;(4 4o,A'sId /,o;�S ,�i11 UbSxb ;t•r)tjion ',VrjJ(A-'9r+r 2. Date and amount of last rainfall event? DATE: AMOUNT: inches 3. Dates of last wasten event perfield: 5 1 U� � Q � (ec.NJ i �Y��,� °^ 0 0/9 3/.23 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in IOh��G t/rFq Co 0'� T�Pll do�vN ?,; Tor, (A-, l per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to W I ( Aof\ I00 1-0 t Aer AA I4f1\ will mod, -b P'ej ► V,)0 PoA (5 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD 1. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I La oon 1 2. Current liquid volume in structural freeboard a. current liquid level according to marker 6.5 inches b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 3720 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 12.0 inches 5.5 inches 95400 it 327063 gallons 180 days 122939 ft3 ft3 ft3 55650 ft3 11563 gallons 338626 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21 /00