HomeMy WebLinkAboutNCC216653_NOT Closeout Documents_20240116 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105
(336) 776-9800
County: Forsyth Project: Kerners Mill Creek Greenway River basin: Yadkin-PeeDee
Person financially responsible:Town of Kemersville-Curtis Swisher Project#: FORSY-2022-011
Address: PO Box 728,Kernersville,NC 27285
1. Project Location: Southern Street,Kernersville
Pictures: Yes-Digital
2. Weather and soil conditions: 70's,sunny,workable Initial inspection: No
3. Is site currently under notice of violation? Yes
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: October 30,2023
9. Corrective action needed:
10. Comments: The site was inspected on October 12,2023 to facilitate a site closure.All construction and
land disturbing activities have been completed at the site.Temporary measures have been
removed.Permanent ground cover sufficient to restrain erosion has been established.No
additional self-monitoring or self-inspections are required.Project is in compliance and
released under the SPCA.Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice
of Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
If you have any questions,please contact the Winston Salem Regional Office or
nate.gainer@deq.nc.gov or 336-776-9660.
Reported by: Nate Gainer Others present:
Date of inspection: October 25,2023 Time arriving on site: 2:30 PM Time leaving site: 3:00 PM
CC: