HomeMy WebLinkAboutNCC205608_NOT Closeout Documents_20240116 SEDIMENTATION INSPECTION REPORT
Town of Weddington
1924 Weddington Rd.Weddington,NC 28104
County:Union Project: Canisteo River basin: Catawba
Person financially responsible: Cam Helms/Scott Threat/Jarod Lalonde /Samantha Sherman Project#2201116-0300
Address: Canisteo Drive Case#
1. Project location: Weddington Road @ Deal Road
Pictures:No:Ekes: ✓❑Video:0 Digital:
2. Weather and soil conditions: Sunny/Dry Soil Conditions First inspection:Yes:O No:E
3. Is site currently under notice of violation? Yes:EINo: l
4. Is the site in compliance with S.P.C.A.and rules? Yes:JNo:0 If no,check violations below:
5. Violations: n
na. No approved plan,G.S. 113A-57(4)and 15A N.C.A.0 4B.0107(c) rig Inadequate buffer zone,G.S. 113A-57(1)
b. Failure to follow approved plan,G.S. 113A-57(5) h. Graded slopes and fills too steep,
..c. Failure to submit revised plan,G.S. 113A-54.1(b)and G.S. 113A-57(2)or 15A N.C.A.C.4B.0124(e)
— 15A N.C.A.C.4B.0118(a) 0 i.Unprotected exposed slopes, G.S. 113A-57(2)
d. Failure to provide adequate groundcover,G.S. 113A-57(3)and ❑j. Failure to install and maintain measures,
15A N.C.A.C.4B.0107(b) 15A N.C.A.C.4B.0113
— 17 k. Failure to self-inspect G.S. 113A-54.1(e)and
e. Insufficient measures to retain sediment on site,G.S. 113A-57(3) 15A N.C.A.C.4B.0131
0 EFailure to take measures to protect property, 15A N.C.A.C.4B.0105 n I. Other(describe)
6. Potential NPDES Permit Violation under NCG 010000? Yes:111No:nNot Applicable:❑If no,check violations below:
. Failure to manage construction site pollutants,NCG 010000 Sec.II,B.1 Fir.Failure to have approved plan and NPDES
m 4. Failure to provide ground stabilization,NCG 010000 Sec.II,B.2 permit on site,NCG 010000 Sec.III,3(d)
Failure to maintain rain gauge or record daily rainfall, J s. Failure to install and maintain BMP's,
NCG 010000 Sec.II,B.1(a,b) NCG 010000 Sec.III,4
p. Failure to meet self-inspection and reporting requirements, t.Failure to operate and maintain control
NCG 010000 Sec.II,B.1(c-i) measures,NCG 010000 Sec.IV, 1
q. Failure to dewater sediment basin from surface, NCG 010000 Sec.II,B.4❑u.Bypass of stormwater control facilities,
NCG 010000,Sec.IV,3
Uv. Other(describe)
7. Has sedimentation damage occurred since last inspection or at l inspection? Yes❑If yes,where?(check all that apply) No:n
Lake/natural watercourse on the tr<ict:0 Lake/natural watercourse off the tract:Other property:El
Description:
Slonnwater Discharge Outfall with sediment loss:
Degree of damage: slight:❑moderate:❑severe:❑
8. Contact made with(name): Cam Helms/S Threat/J Lalonde/S Sherman Title:Owner
Inspection report given:nor sent:Zto person financially responsible. Date given/sent: November 7,2023
9. Corrective actions needed:
None
Report by:Gary Wright Others present:
Date of inspection: November 6,2023 Time arriving on site: 3:30 pm Time leaving site: 4:30 pm
cc: Page 1 of 3
Revised 01/27/2021
SEDIMENTATION INSPECTION REPORT
Local Delegated E&SC Program Name
Address
County:Union Project: Canisteo Project#2201116-0300
9. Corrective actions needed(continued)
Submit an adequate sedimentation and erosion control plan for approval,covering all areas disturbed or to be disturbed.
,—
Install all sedimentation and erosion control measures as shown on the approved plan.
Submit a revised sedimentation and erosion control plan for approval for the following areas:
nProvide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved
plan,including the following areas:
Install erosion and sediment control devices sufficient to retain sediment on the tract at the following areas:
Install temporary sediment traps or basins and associated diversions as shown on the approved plan,including the following locations:
nInstall adequate drop inlet protection as shown on the approved plan,including the following locations:
7I I Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25%of the buffer nearer the land
Lli.Iturbanoe using natural or artificial means(minimum 25-foot width in Trout Waters)including the following areas:
Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established including the following locations:
For disturbed areas less than one acre,provide adequate temporary or permanent ground cover on all graded slopes where rough or fine
grading has been completed for 21 calendar days,including the following locations:
Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation
damage including the following
locations
handle concrete to avoid contact with surface waters,wetlands or buffers and prevent discharge from site.
[Properly
Relocate soil stockpiles at least 50 feet away from storm drain inlets or surface waters.❑
Provide adequate temporary or permanent ground cover on areas where land-disturbing activity has ceased in 7 or 14 days according to
�C'G 01000 permit conditions at the following areas:
Provide sediment basins with a drainage area of one acre or greater with a skimmer or flashboard riser.
Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall event D
on
f1 inch or greater and complete self-monitoring reports.
Maintain a rain gauge in good working order and record daily rainfall amounts.
10.Comments:
Revised 01/27/2021
SEDIMENTATION INSPECTION REPORT
Local Delegated E&SC Program Name
Address
Report by: Date of inspection: Page of
Check only one box, if closing out project.
111 Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are
required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated.
riPermanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are
required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is
available at:dco.nc.Qov/NCGO I.Please note that this correspondence must be uploaded as part of completing the NOT process.
Gary Wright November 6, 2023 3 3
Report by: �+ Date of inspection: Page of