Loading...
HomeMy WebLinkAboutNCC214254_NOT Closeout Documents_20240115 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Alamance Project: Dollar General River basin: Cape Fear Person financially responsible:Glandon Forest Equity,LLC-George T Barnes, Project#: ALAMA-2021-054 Owner/Manager Address: 3825 Barrett Dr,Suite 100,Raleigh,NC 27609 1. Project Location: NC HWY 62,Burlington Pictures: Yes-Digital 2. Weather and soil conditions: Cloudy,60s,workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: November 20,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact me at Robby.Deans@deq.nc.gov or by phone at(336)776-9658. Reported by: Robby Deans Others present: Date of inspection: November 15,2023 Time arriving on site: 2:50 PM Time leaving site: 3:00 PM