HomeMy WebLinkAboutWQ0044732_More Information (Received)_20240116P.O. Box 129 Morrisville, NC 27560 (919)467-1239 MacCONNPLL «Associates, P.C. "Engineering Today For Tomorrows Future" January 16, 2024 To: Elton Luong, Engineer 1 NC Division of Water Resources Division of Water Resources- Non -Discharge Branch 512 N. Salisbury St. Raleigh, NC 27699 Telephone: (919) 707-3658 Dear Mr. Luong: Review Comments are as follows: A. Cover Letter: 1. No comment. B. Application Fee: 1. No comment. C. Application (Form: SFRWWIS 06-16): 1. No comment. D. Property Ownership Documentation: 1. No comment. E. Setback Waivers: 501 Cascade Pointe Lane Suite 103 Cary, NC 27513 www.maccomellandassoc.com Subject: Permit No. WQ0044732 Additional Information Request 919 Marthas Chapel Road SFR Single- Family Residence Wastewater Irrigation System Chatham County 1. Per 15A NCAC 02T .0506(d) and Application Form: SFRWWIS 06-16 Instruction E, please have the setback waivers properly signed and notarized. Added. F. Soil Evaluation: 1. J. Chris Smith of the Raleigh Regional Office has reviewed the soil evaluation and provided the following comments: a. Per Application Form: SFRWWIS 06-16 Item V.15, 15A NCAC 02T .0605(p), and 15A NCAC 02T .0605(g), the depth to a seasonal high water table (SHWT), apparent or perched, was stated as being observed at 15" to 17" at all KsaT locations. DWR Regional Staff found IOYR 7/1 mottles at depths of 8" to 12" at two (2) soil boring locations, which indicates the likely presence of the SHWT at this depth. Please verify and revise. Due to our reliance upon accurate global positioning systems (GPS) as well as accurate site information accessed via geographical information systems (GIS) combined with digital site information provided by the design engineers for this project, Piedmont Environmental Associates can identify soil areas and our position on a given landscape with sub -foot accuracy. For this reason, the proposed drip fields were not flagged by a surveyor, and we also did no field flagging of these soil areas. Respectfully, how can we therefore be assured that our reviewer was evaluating in the correct location on Lot 2A to make this determination as we were not asked to be on site during their review? As we have established, the soils of the Triassic Basin are quite variable, especially in regard to SHWT indicator depths. However, the boring logs and Ksat soil profile descriptions (including 2 new ones, please see below) suggest that the proposed drain field contains the requisite 12" from perched SHWT indicators (see the next comment below for further discussion of perched indicators). b. Per Application Form: SFRWWIS 06-16 Item V.15, 15A NCAC 02T .0605(p), and 15A NCAC 02T .0605(g), the site is described as having a perched SHWT but no evidence has been provided to support this. Please provide evidence of a perched SHWT. Page 94 of the Chatham County Soil Survey reports the following information for seasonally high-water table in the Creedmoor/Green Level Complex: Seasonal high water table: Creedmoor—perched, at a depth of I.0 to 2.0 feet from January through March; Green Level —perched, at a depth of 1.0 to 1.5 feet from December through May This same document goes on to show redoximorphic indicators 62", 65" and 42" below ground surface in the official soil series descriptions of the Creedmoor, Green Level and White Store series respectively. This would suggest that the authors of the soil survey (one of which was a staff soil scientist with DEQ for many years) understood these wetness indicators to be present from a perched condition brought about by the slowly permeable subsoil. We agree with this approach and have always considered it common knowledge that these were perched indicators for Triassic Basin soils. The perched nature of these indicators is now referenced in the soil narrative of our report and made clear on the Ksat soil profile descriptions. c. Per DWR Regional Staff visit on October 20, 2023, the recommended annual loading rate of 18.67 in/yr and drainage coefficient (DC) of 85% is not justified. The DWR Soil Scientist Evaluation Policy and the EPA Process Design Manual: Land Treatment of Municipal Wastewater Effluents (EPA 625/R-06/016) recommends a DC of 4% to 10%. Any greater DC should be accompanied by a statement of justification supported by technical data. The justification provided states that the surface horizon texture supports the high annual loading rate. Surface texture governs instantaneous loading rates and does not increase the maximum vertical drainage capacity of the soil or justify an elevated DC. No supporting data has been provided. Please justify this recommended annual loading rate and drainage coefficient. A narrative justifying this coefficient has been added to our report based on recent conversations with NC DEQ (specifically regarding the criteria outline in Paragraph D of The SFR Loading Rate Policy document). d. Per Application Form: SFRWWIS 06-16 Instruction F and DWR Regional Staff visit on October 20, 2023, no statement has been provided showing that the site has not changed since January 2022, which is when the site was last evaluated. Evaluations conducted more than one (1) year prior to application submission must be accompanied by a statement from the Licensed Soil Scientist (LSS) indicating if the site has changed in any significant way since the evaluation was conducted. Please provide a statement. A statement attesting to soil conditions not changing since our original evaluation has been added to the report. 2. Per Application Form: SFRWWIS 06-16 Instruction F, it is not apparent that the KsaT tests were run until steady-state equilibrium was achieved, as indicated in Attachment 3 — Geometric Mean KsaT Data. All three KsaT tests show inconsistent time measurement intervals, some of which are greater than thirty (30) minutes, and minimal data points to characterize a four to six -hour test. In addition, Lot 2A Nest 1 and Nest 3 ends the test with an empty cylinder, which invalidates the final data point. Please verify and revise the KsaT data to provide more data resolution. Several conversations have taken place recently between our firm and NC DEQ Central and Raleigh Regional staff regarding Ksat data issues. During one of these meetings, our field techniques for collecting Ksat data were outlined. As we explained in this meeting, the readings do not actually run to zero. The zero shown at the last reading of our submitted measurements is from the post processing of our data in the office per our in -person explanation to Chris Smith and Zach Mega on 1/9/24. We recognize that this issue has caused confusion to our reviewers, and we are correcting this approach on all future submittals of Ksat data. To show that it is not of concern in this case, we have normalized the data in the revised report by adding a value of 5 to every water level reading for those readings that previously were reported at zero. As shown in the revised data sets, this does not alter the originally reported data and hopefully shows that the "run to zero" issue is of no concern. We also understand our reviewers' comments regarding variable sample times and are working to correct this issue in future submittals. As we explained during ourl/9/24 meeting, the spreadsheet we use to report our data (provided by the manufacturer of our conductivity device) computes K values regardless of time intervals. However, we will acknowledge that sample intervals with widely varying time gaps could over or underrepresent smaller trends in the data. To help address these concerns in this case, we have collected two additional conductivity readings with more consistent sample intervals (+/- 30 min during steady state readings). We hope the addition of these extra tests in the geometric mean Ksat value will help to alleviate concerns with sample intervals in the originally submitted data, especially since all the tests were relatively consistent (at least in regards to Ksat values, which can vary quite widely as we have discussed). G. Engineering Plans: 1. No comment. H. Specifications: 1. Per page 7 of the Engineering Specifications, there are specifications related to fill work (10, 12, and 13) but no other detail has been provided in other parts of the application. Please clarify if there is fill work being proposed. No fill will be used for this design. Our specifications are written to be generic for single family surface drip irrigation systems. I have revised them for clarification. I. Engineering Calculations: 1. No comment. J. Site Map: 1. No comment. K. Operation & Maintenance Plan: 1. No comment. L. Operation & Maintenance Agreement (Form: SFRWWIS-O&M 09-18): 1. No comment. M. Additional Documentation: ❑ County Health Department Denial Letter: 1. No comment. ➢ Floodway Regulation Compliance: 1. No comment. ➢ Threatened or Endangered Aquatic Species Documentation: 1. No comment. N. Recommendations (Response not required): 1. J. Chris Smith of the Raleigh Regional Office has reviewed the soil evaluation and provided the following comments: a. Please clearly flag KsAT nest locations for future site visits. If you have any questions, please give me or Annie Foxworth a call at (919) 467-1239. Thank you and have a great day. Sir Gary S. McConnell, P.E. President Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Surface Drip Irrigation System with TS-II Pretreatment Application Package for Single Family Residence Project No.: C08504.00 Submittal Date: August 21, 2023 17069 Z3 ,./Z C C00,111 �`• Prepared By: MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 P.O. Box 129 Cary, NC 27513 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Table of Contents • Cover Letter • Form: SFRWWIS 06-16 • Project Narrative • Property Ownership Documentation • Soils Evaluation • Engineering Plans • Specifications • Engineering Calculations • Equipment • Operation & Maintenance Plan • Operation & Maintenance Agreement (09-18) • County Health Department Denial Letter (Email) • Floodway Regulation Compliance • Threatened or Endangered Aquatic Species Documentation 2 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Cover Letter _ SEAL ' 17069 MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 P.O. Box 129 Morrisville, NC 27560 (919)467-1239 MacCONNELL & Associates, P.C. "Engineering Today For Tomorrow's Future" August 9, 2023 To: Nathaniel Thornburg NC Division of Water Resources Division of Water Resources- Non -Discharge Branch Attn: Nathaniel Thornburg- 9t" Floor, Office #942X. 512 N. Salisbury St. Raleigh, NC 27604 Telephone: (919) 707-3653 To Mr. Thornburg: 501 Cascade Pointe Lane Suite 103 Cary, NC 27513 www.macconnellandassoc.com This letter accompanies a Minor Modification Application to an existing Single -Family Residence Wastewater Irrigation System Permit (No. WQ0024709). Within the application package you will find the following information: project narrative, form: SFRWWIS 06-16, property ownership documentation, existing permit, engineering plans, specifications, engineering calculations, equipment, operation & maintenance plan, operation & maintenance agreement (09-18), floodway regulation compliance, and threatened or endangered aquatic species documentation. The project referred to in this package is the construction of a TS-II surface drip system for a 5-bedroom single family home. The proposed system modifications will consist of converting the treatment system to EZ Treat (septic tank, E-Z Treat recirculating media filter, recirculation tank, field dosing tank) and minor changes to the drip irrigation field with all the necessary appurtenances. Thank you for your consideration of this Minor Modification Application to a Single -Family Residence Wastewater Irrigation System. If you have any questions or require additional information, please contact me or Annie Foxworth at (919) 467-1239. Sincerely, Gary MacConnel President -y - PE SEAL 17069 - -,,,, , - , %% ell/ oc z3 S )l1 C ,..� ., A �.� Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Form: SFRWWIS 06-16 17069 (J _7 Z / M C 11&A t PC ac onne ssocia es, . . 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 DWR State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02T .0600 — SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEMS INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION The Division of Water Resources will not accept an application package unless all instructions are followed. Plans, specifications and supporting documents shall be prepared in accordance with 15A NCAC 02L .0100, 15A NCAC 02T .0100, 15A NCAC 02T .0600, 15A NCAC 18A .1900, Division Policies and good engineering practices. Failure to submit all required items may result in the application being returned, and will necessitate additional processing and review time. For more information, visit the Water Quality Permitting Section's Non -Discharge Permitting Unit website General — When submitting a non -discharge application to the Water Quality Permitting Section's Non -Discharge Permitting Unit, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time by assisting the reviewer in locating the required materials and potentially reducing the amount of requested additional information. Unless otherwise noted, the Applicant shall submit one original and at least two copies of the application and supporting documentation. A. Cover Letter (All Application Packages): ® List all items and attached supporting documentation included in the application package, as well as a brief description of the requested permitting action. B. Application Fee (All New and Major Modification Application Packages): ® Submit a check, money order or electronic funds transfer made payable to: North Carolina Department of Environmental Quality (NCDEQ). ® The appropriate fee amount for new and major modification application packages may be found at: Standard Review Project Fees. C. Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) Application (All Application Packages): ® Submit the completed and appropriately executed Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) application. Any unauthorized content changes to FORM: SFRWWIS 06-16 shall result in the application package being returned. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ® If the Applicant Type in Item L2. is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item L2. is a partnership, sole proprietorship, trade name, or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The facility name in Item IL2. shall be consistent with the facility name on the plans, specifications, agreements, etc. ® The Professional Engineer's Certification on Page 6 of the Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 6 of the Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). ❑ If this project is for a renewal without modification, use the Non -Discharge System Renewal (FORM: NDSR) application. D. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., compliance schedules, permit description, monitoring, permit conditions, etc.). E. Property Ownership Documentation (All Application Packages): ® Per 15A NCAC 02T .0604(e), the Applicant shall demonstrate they are the owner of all property containing the wastewater treatment, storage and irrigation facilities: E Legal documentation of ownership (i.e., contract, deed or article of incorporation), or ❑ Written notarized intent to purchase agreement signed by both parties with a plat or survey map, or ❑ Written notarized lease agreement that specifically indicates the intended use of the property and has been signed by both parties, as well as a plat or survey map. Lease agreements shall adhere to the requirements of 15A NCAC 02L .0107. ® Provide all agreements, easements, setback waivers, etc. that have a direct impact on the wastewater treatment, conveyance, storage and irrigation facilities. INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 1 of 4 F. Soil Evaluation (All Application Packages that include new irrigation sites): ®Per 15A NCAC 02T .0604(b) and current Division Policy, submit a detailed soil evaluation that has been signed, sealed and dated by a North Carolina Licensed Soil Scientist and includes at a minimum: ® The report shall identify all the sites/fields with project name, location, and include a statement that the sites/fields were recommended for the proposed land application activity. ® Note, if the soil evaluation was performed more than one year prior to the submittal of this application package, a statement shall be included indicating that the site has not changed since the original investigation. ® Field delineated detailed soils map meeting all of the requirements of the Soil Scientist Evaluation Policy. ® Soil profile descriptions meeting all of the requirements of the Soil Scientist Evaluation Policy. ® Provide all soil boring logs performed at the site. ® Standard soil fertility analysis conducted no more than one year prior to permit application for each map unit in the soil map legend for the following parameters: ❑ Acidity ❑ Exchangeable sodium percentage (by calculation) ❑ Phosphorus ❑ Base saturation (by calculation) ❑ Magnesium ❑ Potassium ❑ Calcium ❑ Manganese ❑ Sodium ❑ Cation exchange capacity ❑ Percent humic matter ❑ Zinc ❑ Copper ❑ pH Note: The number of samples will vary depending upon the project size and past land use history. Multiple samples for each map unit are required if the irrigation zones are separated, and cropland, pasture, hay land and wooded areas shall be sampled separately for the same map unit due to past differences in soil fertility management. ® Saturated hydraulic conductivity (KSAT) data that shall include at a minimum: ® A minimum of three KSAT tests shall be conducted in the most restrictive horizon for each soil series in the soil map. ® All KSAT tests shall be conducted in areas representative of the site. ® All KSAT tests shall be run until steady-state equilibrium has been achieved. ® All collected KSAT data shall be submitted, including copies of field worksheets showing all collected readings. ® Submit a soil profile description for each KSAT data point that shall extend at least one foot below the tested horizon. ® Soil evaluation recommendations shall include at a minimum: ® A brief summary of each map unit and its composition and identification of minor contrasting soils. ® Maximum irrigation precipitation rate (in/hr) for each soil/map unit within the proposed irrigation areas. ® Identification of areas not suitable for wastewater irrigation. ® Recommended geometric mean KSAT rate to be used in determining the SFR Loading Rate Group for each soil/map unit based upon in -situ measurement of the saturated hydraulic conductivity from the most restrictive horizon. ® Recommended annual hydraulic loading rate (in/yr) for each soil/map unit within the proposed irrigation areas based upon in -situ KSAT measurements form the most restrictive soil horizon. The recommended loading rate must be in accordance with the Single -Family Residence Wastewater Irrigation System Loading Rate Calculation Policy. ® A completed copy of the Single -Family Residence Loading Rate Workbook (i.e., Project Information, Potential Evapotranspiration, Precipitation, and Irrigation Area Calculations). G. Engineering Plans (All Application Packages): ® Per 15A NCAC 02T .0604(c)(1), submit standard size and 11 x 17-inch plan sets that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. ® At a minimum, the engineering plans shall include the following items: ® Table of contents with each sheet numbered, as well as cross-referenced with the appropriate application items. ® A general location map with at least two geographic references, vicinity map, topographic map and site map. ® A process and instrumentation diagram showing all flow, recycle/return, electrical paths, etc. ® Plan and profile views of all treatment and storage units, including their piping, valves, and equipment (i.e., pumps, etc.), as well as their dimensions and elevations. ® Details of all piping, valves, pumps, precipitation/soil moisture sensors, etc. ® A hydraulic profile from the treatment plant headworks to the highest irrigation point. ® The irrigation area with an overlay of the suitable irrigation areas depicted in the Soil Evaluation. ® Each nozzle/emitter and their wetted area influence, and each irrigation zone labeled as it will be operated. ® Locations within the irrigation system of air releases, drains, control valves, highest irrigation nozzle/emitter, etc. ® Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the plans may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 2 of 4 H. Specifications (All Application Packages): ® Per 15A NCAC 02T .0604(c)(2), submit specifications that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. ® At a minimum, the specifications shall include the following items: ® Table of contents with each section/page numbered, as well as cross-referenced with the appropriate application items. ® Detailed specifications for each treatment/storage/irrigation unit, as well as all piping, valves, equipment (i.e., pumps, etc.), nozzles/emitters, precipitation/soil moisture sensor, audible/visual high water alarms, liner material, etc. ® Site Work (i.e., earthwork, clearing, grubbing, excavation, trenching, backfilling, compacting, fencing, seeding, etc.) ® Materials (i.e., concrete, masonry, steel, painting, method of construction, etc.) ® Electrical (i.e., control panels, etc.) ® Means for ensuring quality and integrity of the finished product, including leakage, pressure and liner testing. ® Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. L Engineering Calculations (All Application Packages): ® Per 15A NCAC 02T .0604(c)(3), submit engineering calculations that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. ® At a minimum, the engineering calculations shall include the following items: ® Hydraulic and pollutant loading calculations for each treatment unit demonstrating how the designed effluent concentrations in Application Item V.1. were determined (Note: "black box" calculations are unacceptable). ® Sizing criteria for each treatment unit and associated equipment (i.e., pumps, etc.). ® Total and effective storage calculations for each storage unit. ® Friction/total dynamic head calculations and system curve analysis for each pump used. ® Manufacturer's information for all treatment units, pumps, irrigation system, etc. ® Flotation calculations for all treatment and storage units constructed partially or entirely below grade. ® Demonstrate the designed maximum precipitation and annual loading rates do not exceed the recommended rates. ® Demonstrate the specified auxiliary power source is capable of powering all essential treatment units. ® A properly completed and executed Single -Family Residence Loading Rate Workbook. Site Map (All Application Packages): ® Per 15A NCAC 02T .0604(d), submit standard size and 11 x 17-inch site maps that have been signed, sealed and dated by a North Carolina licensed Professional Engineer and/or Professional Land Survevor. ® For clarity, multiple site maps of the facility with cut sheet annotations may be submitted. ® At a minimum, the site map shall include the following: ® A scaled map of the site with topographic contour intervals not exceeding two feet and showing all facility -related structures and fences within the wastewater treatment, storage and irrigation areas. ® Soil mapping units shown on all irrigation sites. ® The location of all wells (including usage and construction details if available), streams (ephemeral, intermittent, and perennial), springs, lakes, ponds, and other surface drainage features within 500 feet of all wastewater treatment, storage and irrigation sites. ® Delineation of the compliance and review boundaries per 15A NCAC 02L .0107(i) and .0108. ® Setbacks as required by 15A NCAC 02T .0606. ® Site property boundaries within 500 feet of all wastewater treatment, storage and irrigation sites. ® All habitable residences or places of public assembly within 500 feet of all treatment, storage and irrigation sites. K. Operation and Maintenance Plan (All Application Packages): ® Per 15A NCAC 02T .0604(f), submit an operation and maintenance (O&M) plan encompassing all wastewater treatment, storage and irrigation systems that at a minimum shall address: ® How to perform routine inspections. ® A maintenance schedule. ® A troubleshooting guide. ® A layman's explanation of the wastewater treatment, storage and irrigation systems. ❑ A crop maintenance and management plan. ® Note a final O&M Plan may be submitted with the partial and/or final Engineering Certification required under 15A NCAC 02T .0116, however, a preliminary O&M Plan shall be submitted with each application package. L. Operation and Maintenance Agreement (All Application Packages): ® Per 15A NCAC 02T .0604(h), submit a notarized Operation and Maintenance Agreement that has been signed and dated by all deeded property owners. INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 3 of 4 M. County Health Department Denial Letter (All New Application Packages): ® Per 15A NCAC 02T .0604(2), provide a written letter from the local County Health Department denying the site for all subsurface systems. N. Floodway Regulation Compliance (All Application Packages where any portion of the wastewater treatment, storage and irrigation system is located within the 100-year floodplain): ® Per 15A NCAC 02T .0105(c)(8), provide written documentation from all local governing entities that the facility is in compliance with Article 21 Part 6 of Chapter 143 of the General Statutes (i.e., § 143-215.51. through § 143-215.61.). O. Threatened or Endangered Aquatic Species Documentation (All Application Packages): ® Per 15A NCAC 02T .0105(c)(10), submit documentation from the Department's Natural Heritage Program demonstrating the presence or absence of threatened or endangered aquatic species within the boundary of the wastewater treatment, storage and irrigation facilities. ® If the facility directly impacts such species, this documentation shall provide information on the need for permit conditions pursuant to 15A NCAC 02B .0110. P. Other Environmental Permits (All Application Packages that include stream or wetland crossings): ❑ Per 15A NCAC 02T .0105(c)(6), submit a copy of either the approved permit/certification or a letter from the appropriate review agency acknowledging receipt of the application for the following applicable permits/certifications: ❑ Division of Water Resources' Water Quality Permitting Section — Wetlands 401 Certification ❑ US Anny Copps of Engineers South Atlantic Division — Nationwide 12 or Section 404 permit ❑ Per 15A NCAC 02T .0105(c)(6), this application shall be considered incomplete or the resulting permit may be issued conditionally, if a pending issuance of any of the aforementioned permits/certifications directly impact the facility herein. THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: By Courier/Special Delivery: 1617 MAIL SERVICE CENTER 512 N. SALISBURY ST. RALEIGH, NORTH CAROLINA 27699-1617 RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: (919) 807-6464 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 4 of 4 DWR State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02T .0600 — SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEMS FORM: SFRWWIS 06-16 I. APPLICANT INFORMATION: 1. Applicant's name as appears on deed, contract or lease agreement: Martha's Vineyard, LLC 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership 3. Signature authority's name: Joel Carpenter per 15A NCAC 02T .0106(b) Title: Manager 4. Applicant's mailing address: 1933 Morrisville Carpenter Road City: Cary State: NC Zip: 27519- 5. Applicant's contact information: Telephone number: (919) 669-4537 Fax number: (_) = Email Address: oldecarpenter(a�bellsouth.net IL FACILITY INFORMATION: 1. Facility name: Martha's Vineyard Lot 2A 2. Facility status: ❑ Existing or ® Proposed 3. Facility's physical address: 919 Martha's Chapel Road City: Apex State: NC Zip: 27523- County: Chatham 4. Wastewater Treatment Facility Coordinates: Latitude: 35' 47' 3 1 " Longitude: -78' 59' 36" Provide the following latitude and longitude coordinate determination information: Datum: Unknown Level of accuracy: Unknown Method of measurement: Address matching 5. USGS Map Name: III. CONSULTANT INFORMATION: 1. Engineer's name: Gary S. MacConnell License Number: 17069 Firm: MacConnell & Associates, PC Engineer's mailing address: PO Box 129 City: Morrisville State: NC Zip: 27560- Telephone number: (919) 467-1239 Fax number: Email Address: garynmacconnellandassoc.com 2. Soil Scientist's name: G. Christopher Murray License Number: 1284 Firm: Piedmont EnvironmentalAssociates, P.A. Soil Scientist's mailing address: 216 S. Swing Road City: Greensboro State: NC Zip: 27409- Telephone number: (336) 215-8820 Fax number: (_)= Email Address: chriskpiedmontsoil.com IV. GENERAL REQUIREMENTS —15A NCAC 02T .0100: 1. Application type: ® New ❑ Major Modification ❑ Minor Modification If a modification, provide the existing permit number: WQ00 and most recent issuance date: 2. Application fee: $60 3. Describe the origin of the wastewater and provide a brief project description: Surface drip irrigation system with TS-II pretreatment for a single family residence. 4. Wastewater flow: 600 GPD FORM: SFRWWIS 06-16 Page 1 of 6 IV. GENERAL REQUIREMENTS —15A NCAC 02T .0100 (CONTINUED): 5. Using 15A NCAC 02T .0114, explain how the total wastewater flow was determined: Establishment Type Flow Basis Flow Per Unit Number of Units Flow Single Family Residence gal/day 120 5 600 GPD gal/ GPD Total 600 GPD Per 15A NCAC 02T .0105(c)(6), if the project includes any stream or wetland crossings, what is the status of the following applicable permits/certifications? Date Droved ate Permit/Certification � Permit/Certification No.F Agency Reviewer Submitted A Nationwide 12 or 404 Wetlands 401 7. What is the nearest 100-year flood plain elevation to the facility? 237.8 feet mean sea level. Source: Fema Firmette Are any treatment, storage or irrigation systems located within the 100-year flood plain? ❑ Yes or ® No If yes, has documentation of compliance with Article 21 Part 6 of Chapter 143 of the G.S. been provided? ❑ Yes or ❑ No V. DESIGN CRITERIA AND SETBACKS —15A NCAC 02T .0605 & .0606: 1. Provide the estimated influent and designed effluent concentrations from the engineering calculations to verify conformance with 15A NCAC 02T .0605(b) for the following parameters: Estimated Influent Designed Effluent Minimum Required Parameter Concentration Concentration Degree of Treatment (monthly average) Prior to Stora e Biochemical Oxygen Demand 300 mg/1 6 mg/1 < 30 mg/1 BOD5 — Total Suspended Solids (TSS) 300 mg/1 4.5 mg/1 < 30 mg/1 Ammonia Nitrogen (NH3-N) 25 mg/1 2.87 mg/1 < 15 mg/I Fecal Coliforms 188 per 100 ml < 200 colonies/100 ml 2. Per 15A NCAC 02T .0605(c), is the effluent placed directly in contact with GA classified groundwater? ❑ Yes or ® No If yes, have predictive calculations demonstrating such placement will not contravene GA groundwater standards been provided? ❑ Yes or ❑ No 3. Per 15A NCAC 02T .0605(d), are any of the treatment or storage units excavated into bedrock? ❑ Yes or ® No If yes, has a 10 millimeter synthetic liner been provided? ❑ Yes (Plan Sheet: & Specification Page: ) or ❑ No 4. In accordance with 15A NCAC 02T .0605(e), are any earthen treatment and storage facilities provided? ❑ Yes or ® No 5. In accordance with 15A NCAC 02T .0605(f), have any by-pass or overflow lines been provided? ❑ Yes or ® No 6. If any treatment, storage or irrigation systems are located within the 100-year flood plain, in accordance with 15A NCAC 02T .0605(g), which systems are affected and what measures being taken to protect them against flooding? 7. In accordance with 15A NCAC 02T .0605(h), has an operation and maintenance plan been submitted? ® Yes or ❑ No 8. In accordance with 15A NCAC 02T .0605(i), how will restricted access to the irrigation system be provided? 2-Strand Wire Fence (see desi n) Are all treatment units and control panels locked to prevent entry? ® Yes or ❑ No 9. In accordance with 15A NCAC 02T .0605(i), do the designed irrigation loading rates (see Application Item VIL4.) exceed the soil scientist recommended loading rates (see Application Item VIL3.)? ❑ Yes or ® No 10. In accordance with 15A NCAC 02T .0605(k), does the septic tank design adhere to 15A NCAC 18A .1900? ® Yes or ❑ No FORM: SFRWWIS 06-16 Page 2 of 6 V. DESIGN CRITERIA AND SETBACKS —15A NCAC 02T .0605 & .0606 (CONTINUED): 11. In accordance with 15A NCAC 02T .06050), what is the specified method of disinfection? Ultraviolet If chlorine, specify contact detention time provided: minutes and where contact time occurs: If UV, specify the number of banks: 1, total lamps: 2 and maximum flow capacity: 10 GPM. 12. In accordance with 15A NCAC 02T .0605(m), has a minimum of five days of storage based on average daily flow between the pump off float and inlet invert pipe been provided? ® Yes or ❑ No 13. In accordance with 15A NCAC 02T .0605(n), have all tanks containing pumps been provided with audible and visual alarms that are external to any structure? ® Yes (Plan Sheet: D-102/D-103 & Specification Page: 5, 8) or ❑ No 14. In accordance with 15A NCAC 02T .0605(o), has a precipitation or soil moisture sensor been provided? ® Yes (Plan Sheet: D-105 & Specification Page: D or ❑ No 15. In accordance with 15A NCAC 02T .0605(p), has a minimum of 18 inches of vertical separation between the apparent seasonal high water table (SHWT) and the ground surface been provided? ® Yes or ❑ No 16. In accordance with 15A NCAC 02T .0605(g), has a minimum of 12 inches of vertical separation between any perched seasonal high water table (SHWT) and the ground surface been provided? ® Yes or ❑ No 17. In accordance with 15A NCAC 02T .0605(r), does the designed annual loading rate exceed 50 inches? ❑ Yes or ® No 18. Does the project comply with all setbacks found in the river basin rules (15A NCAC 02B .0200)? ® Yes or ❑ No If no, list non -compliant setbacks: 19. Per 15A NCAC 02T .0606, verify setback compliance by providing the minimum field observed distance (ft) from the facility's irrigation system and treatment/storage units to each listed setback parameter (Note: Distances greater than 500 feet shall be marked N/A): Setback Parameter Irrigation System Treatment / �Storage Units Any habitable residence or place of assembly under separate ownership or not to be maintained as part of the proj.ect site 165 250 Any habitable residence or place of assembly owned by the Permittee to be maintained as art of the project ect site 27 Any private or public water supply source 100 100 Surface waters (streams — intermittent and perennial, perennial waterbodies, and wetlands) N/A N/A Groundwater lowering ditches (where the bottom of the ditch intersects the SHWT) N/A Subsurface groundwater lowering drainage systems N/A Surface water diversions (ephemeral streams, waterways, ditches) N/A Any well with exception of monitoring wells 100 100 Any property line 10 10 Top of slope of embankments or cuts of two feet or more in vertical height N/A Any water line from a disposal system 10 Any swimming pool N/A Public right of way N/A Nitrification field 20 Any building foundation or basement 27 20. Are any setback waivers proposed for this facility? ® Yes or ❑ No If yes, in accordance with 15A NCAC 02T .0606(c), submit the appropriate setback waivers (FORM: NDWSW) that have been notarized, signed by all parties involved and recorded with the County Register of Deeds. Waivers involving the compliance boundary shall be in accordance with 15A NCAC 02L .0107. FORM: SFRWWIS 06-16 Page 3 of 6 VI. WASTEWATER TREATMENT & STORAGE FACILITY DESIGN: 1. Type of treatment system: Septic Tank / EZ Treat 2. Provide the requested information for each treatment/storage unit and its associated mechanical equipment: a. PRELIMINARY / PRIMARY TREATMENT (i.e., physical removal operations): No. of Manufacturer or Dimensions (ft) / Volume Plan Sheet Specification Treatment Unit Units Material Spacings (in) (gal) Reference Reference Septic Tank 1 David Brantley & 9.75x5x4.3 1,250 D-101 2/3 Sons Select Select b. SECONDARY TREATMENT (i.e., physical, biological and recirculation processes): Treatment Unit No. of Manufacturer or Dimensions (ft) Volume Plan Sheet Specification Units Material (gal) Reference Reference David Brantley & Recirculation Tank 1 7.29x4.08x4.17 (LD.) 1,000 D-102 2/3 Sons EZ Treat 1 E-Z Treat 7. 29x4. 08x3. 3 (I. D) 714.6 D-105 5 Select �03011109wlmai No. of Manufacturer or Volume Plan Sheet Specification Treatment Unit Dimensions (ft) Units Material (al) Reference Reference Ultraviolet 1 E-Z Treat 1.40.1 10 gpm D-103 5 Select d. PUMP/STORAGE TANK: Manufacturer or Material No. of Units Dimensions (ft) Total Volume (gal) Effective Volume (al) Effective Storage (days) Plan Sheet Reference Specification Reference Field Dosing 1 David Brantley & Sons 4,500 3,300 5.5 D-103 2/3 e. PUMPS: No. of Manufacturer / Capacity Plan Sheet Specification Location Purpose GPM I TDH Pumps Type Reference Reference Recirculation Tank 1 Dose to E-Z Treat STA-Rite Step 30 13.6 100 D-102 4 Pod 1 /2 h Field Dosing 1 Dose to drip field STA-Rite 30 21.2 114.5 D-103 4 1 hp f. BLOWERS: Location No. of No. Units Served TManufacturer / Type Capacity CF Plan Sheet Reference Specification Reference g. MIXERS: FORM: SFRWWIS 06-16 Page 4 of 6 Location No. of Mixers Units Served Manufacturer / Type Power h Plan Sheet Reference Specification Reference FORM: SFRWWIS 06-16 Page 5 of 6 VII. IRRIGATION SYSTEM DESIGN: 1. Are there any artificial drainage or water movement structures within 200 feet of the irrigation area? ❑ Yes or ® No If yes, please explain if the Soil Evaluation addresses artificial structures and indicate if these structures are to be maintained or modified: 2. What is the proposed cover crop? grass or natural woods 3. Soil Evaluation recommendations: Soil Series Fields within Soil Area Minimum Observed Depth to SHWT (ft) Recommended Loading Rate (in/hr) Recommended Loading Rate (in/yr) Creedmor-White Store Zones 1, 2, 3 1 0.2 18.67 4. Irrigation System Information (Note -this table maybe expanded for additional fields): Field Area (acres) Dominant Soil Series Designed Rate (in/hr) Designed Rate (in/yr) Latitude i (DMS) Longitude i (DMS) Waterbody Stream Index No, Classification 1 0.44 CrB - Creedmor-White Store .05 18.34 35°47'32" -78°59'36" 16-41-(0.5) WS- IV,B;NSW,CA Total a it ' Provide the following latitude and longitude coordinate determination information: Datum: UnknownLevel of accuracy: UnknownMethod of measurement: Address matching 2 For assistance determining the waterbody stream index number and its associated classification, instructions may be downloaded at: https://nedenr.s3.amazonaws.com/s3fs- public/W ater%20Qualiiy/Aquifer%2OProtection/LAU/A ueements/W S CA%2008-13. pdf. Spray Irrigation Design Elements Drip Irrigation Design Elements Nozzle wetted diameter: ft Emitter wetted area: 19,155 ft2 Nozzle wetted area: ft2 Distance between laterals: 3 ft Nozzle capacity: GPM Distance between emitters: 2 ft Nozzle manufacturer/model: / Emitter capacity: 0.53 GPH Elevation of highest nozzle: ft Emitter manufacturer/model: Geoflow / Wasteflow PC Specification Reference: Elevation of highest emitter: 266 ft Specification Reference: 6 FORM: SFRWWIS 06-16 Page 6 of 6 Professional Engineer's Certification: 1. Gary S. MacConnell, PE attest that this application for (Professional Engineer's name from Application Item Ill.1.) Martha's Vineyard Lot 2A (Facility name from Application Item I1.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions, as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design, Note: In accordance with Gc►eral Statutes 143-214.6,-\ and 143_215.611. any person who knowingly, makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a tine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: Applicant's Cxrtification per 15A NC'AC 02T .0106(hl: Joel Carpenter _ (Signature Authurity's name & title from Application Item 1.3.) Martha's Vineyard Lot 2A (Facility name from Application Item 11.1 _ ) _attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge I understand that any discharge of wastewater From this non-cfircharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and -or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated, I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that the applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do not have any overdue annual fees per 15 A N( AC Q 1 .0105 e . Note: In accordance with General Statutes 13 215.6A and 14-1 • ;156B any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10.000 we civil alties up t V5,000 per violation. Signature: r►ve. ►^, V Date: ho 9 Agd Z7 FORM: SFRWWIS 06-16 Page? of 6 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina SCNL ; 17069 f�YG I NE�e Project Narrative MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Project Narrative Introduction Owner Martha's Vineyard, LLC Registered Agent Joel C. Carpenter Property Address 919 Martha's Chapel Rd Facility Bedrooms 5 Flow Reduction 0% Design Flow GPD 600 The Owner proposes to construct a 5-bedroom single family home at the above -mentioned location in Chatham County, North Carolina. The site has been previously determined to be unsuitable for subsurface disposal. Please see section titled County Health Department Denial Letter (Email) for additional details. The onsite wastewater system will be an EZ Treat Treatment System with a surface drip irrigation field. Gary S. MacConnell, PE of MacConnell & Associates, PC has been retained for the design of the surface drip system with TS-11 pretreatment. These plans are being submitted for review and approval to obtain a Single Family Residence Wastewater Irrigation System for the onsite system that will serve the 5-bedroom single family home. The proposed system will consist of a septic tank, an E-Z Treat recirculating media filter, a recirculation tank, a field dosing tank, an E-Z Set drip irrigation system, E-Z Set drip irrigation tubing and the necessary appurtenances. The proposed wastewater treatment and disposal system does not have any conflicts with existing utilities in the area. The system also maintains all the buffers required in the 15A NCAC 02T .0600 rules. The proposed systems shall meet all of the requirements and specifications outlined in: Innovative Wastewater System Approval No: IWWS-2015-03-R2 and Innovative Wastewater System Approval No: IWWS-2007-1-RI. Septic, E-Z Treat Recirculation, and Field Dosing Tank The proposed wastewater treatment system will provide both anaerobic treatment and solids removal in a new 1,250-gallon septic tank. This tank will provide greater than 48 hours of detention providing for adequate anaerobic treatment and solids removal from the wastewater. Septic tank effluent will drain into the E-Z Treat recirculation tank as wastewater flows into the septic tank. The septic tank will contain a Polylok PL-122, SIM/TECH STF-110 or approved equal effluent filter to prevent solids from reaching the E-Z Treat recirculation tank. The E-Z Treat recirculation tank is a new 1,000-gallon pump tank. An effluent bypass valve located in the E-Z Treat recirculation tank will separate the flow once the E-Z Treat treatment unit is dosed. The effluent will be returned to the E-Z Treat recirculation tank until the bypass valve is closed, the remaining effluent will then flow to a field dosing tank. Effluent will be recirculated Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 through the E-Z Treat treatment unit until additional septic tank effluent enters the E-Z Treat recirculation tank causing the bypass valve to close. The field dosing tank is a new 4,500-gallon tank. The field dosing tank will provide treated effluent to dose the fields. E-Z Treat Treatment Unit The Model 600 E-Z Treat treatment unit will be used to provide additional treatment to the septic tank effluent as well as removing any suspended solids not removed by the septic tank. The E-Z Treat treatment unit includes housing, piped distribution system, sprinkler heads, and styrene media. The underdrain system will transport the E-Z Treat treatment unit effluent back through an effluent bypass valve into one of the dosing tanks. E-Z Set Drip Wastewater Subsurface Drip System The E-Z Set drip irrigation system consists of the field dosing controls, vortex filter, hydraulic unit, and pump used to dose the disposal fields. The system controls determine when the pump doses the disposal field. The vortex filter provides even greater filtration to ensure that solids in the effluent do not clog the drip irrigation line emitters. Ultraviolet Disinfection The effluent from the E-Z Treat recirculation tank will be disinfected by ultraviolet light prior to entering the field dosing tank and being irrigated. The ultraviolet disinfection unit shall be by E- Z Treat (Model E-Z UV 102) or approved equal by engineer. Drip Irrigation Lines The drip irrigation lines are dosed by the hydraulic unit. These lines consist of a hollow pipe filled with pressure compensating drip emitters spaced on two -foot intervals. These emitters ensure that there is uniform distribution of the treated wastewater throughout the irrigation zones. The drip lines will follow the contour lines at three-foot horizontal spacing and make a complete loop back to the dosing tank. This ensures that proper pressure is maintained in the drip lines and that there is a means for flushing the lines in the instance that they become clogged. Rain Sensor A Hunter Mini-Clik rain sensor is included in the wastewater design to ensure that irrigation does not occur during precipitation events. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 Project Contacts Names, addresses, phone and fax numbers of the owner, soil scientist, and engineer are as follows: Owner: Martha's Vineyards, LLC Registered Agent: Mr. Joel C. Carpenter 3040 Carpenter Upchurch Road Cary, North Carolina 27519 Phone: (919) 669-4537 Mobile: (919) 467-1517 Soil Scientist: Mr. Chris Murray, L S S Piedmont Environmental Associates, PA 216 S. Swing Road, Suite 1 Greensboro, NC 27409 Phone: (336) 662-5487 Engineer: Mr. Gary S. MacConnell, P.E. MacConnell & Associates, P.C. P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 3 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Property Ownership Documentation MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 1491 0537 FILED CHATHAM COUNTY NC TREVA B. SEAGROVES REGISTER OF DEEDS FILED Dec 07, 2009 AT 10:56.39 am BOOK 01491 START PAGE 0537 END PAGE 0538 INSTRUMENT # 12754 BOOK 14 91 PAGE 0 5 3 7 EXCISE TAX 11,151.00 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $1,050.00 Tax Parcel Nos. 0085290 0085289 0019629 0085291 0085292 and 0085293, Verified by Chatham County on the day of 12009 By: Mail/Box to: Weatherspoon & Voltz LLP, PO Box 10324, Raleigh, NC 27605 This instrument was prepared by: Weatherspoon & Voltz LLP (Without Benefit of Title Examination) Brief description for the Index: Lots 1, 1 A, 2, 3, 41 and 5, Martha's Vineyard, Plat Slide 2007, Page 55 tj THIS DEED is made this srday of ])Q(' P111DLO r-, 2009, by and between GRANTOR GRANTEE HILDA F. CARPENTER, Widow MARTHA'S VINEYARD, LLC, a North Carolina limited liability company 3040 Carpenter Upchurch Road Cary, NC 27519 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WTTNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, that certain lot or parcel of land situated in Williams Township, Chatham County, North Carolina and being described as follows: BEING all of Lots 1, 1A, 2, 3, 4 and 5, containing 26.8 acres, more or less, as shown on that plat recorded in Plat Slide 2007, Page 55, Chatham County Registry. 1491- 0538 BOOK 14 9 I pAoE O 5 3 8 The property hereinabove described was acquired by Grantor by instrument recorded in Book 293, Page 118, Chatham County Registry. A map showing the above described property is recorded in Plat Slide 2007, Page 55, Chatham County Registry. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: 1. Taxes for the year 2010 and subsequent years, a lien not yet due and payable. 2. Easement to Carolina Power & Light Company, d/b/a Progress Energy Carolinas, Inc. recorded in Book 1420, Page 1105, Chatham County Registry. 3. Matters as shown on that plat recorded in Plat Slide 2007, Page 55, Chatham County Registry. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. Hilda F. Carpenter STATE OF NORTH CAROLINA, COUNTY OF WAKE 1, (nl ti tp C-71CI(A l rAa- , a Notary Public for said County and State, do hereby certi l� hvgallltlWk', Carpenter, eit er being personally known to me or proven by satisfactory evidence (said evidence being .�``� q ), personally appeared before me this day, and acknowledged the voluntary due execution of the fdT ng instrumen < him/her/them for the purposes stated therein. ? O N O T A R y WITNESS my hand and Notarial stamp or seal this= day of , 20091a _ = RUBL.IG My Commission Expires: ;h `,� -�" '11A— � Printed Name: m:\users\rob\clients\carpenter,joel\marlha's vineyard\deed.doc CA202307404491 LIMITED LIABILITY COMPANY ANNUAL REPORT 1/6/2022 NAME OF LIMITED LIABILITY COMPANY: Martha's Vinevard, LLC SECRETARY OF STATE ID NUMBER:. 1088850 STATE OF FORMATION: NC REPORT FOR THE CALENDAR YEAR: 2023 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: Joel Carpenter 2: SIGNATURE OF THE NEW REGISTERED AGENT: SOSID: 1088850 Date Filed: 3/15/2023 Elaine F. Marshall North Carolina Secretary of State CA2023 074 04491 Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS & COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 1933 Morrisville Carpenter Road , NC 27519 Wake SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: investments PO Box 891 Morrisville, NC 27560 Wake 2. PRINCIPAL OFFICE PHONE NUMBER: (919) 669-4537 3. PRINCIPAL OFFICE EMAIL Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 5. PRINCIPAL OFFICE MAILING ADDRESS ..' 1933 Morrisville Carpenter Road 1933 Morrisville Carpenter Road , NC 27519 Wake Cary, NC 27519 Wake Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: COMPANY OFFICIALS (Enter additional company officials in Section E.) NAME: Joel Carpenter NAME: TITLE: Manager/Member TITLE: ADDRESS: 1933 Morrisville Carpenter Road Cary, NC 27519 Wake ADDRESS: NAME:' TITLE: ADDRESS: SECTION D• CERTIFICATION OF ANNUAL REPORT.Section D must be completed in its entirety by a person/business entity. `SIGNATURE DATE Form must be by a C pany Official listed under Section C of This form. Print or Type Name of Company Official Print or Type Title of Company Official SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF $200 MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Raleigh,.NC 27626-0525 BK 2380 PG 0169 State of North Carolina Department of Environmental Quality Division of Water Resources FILED CHATHAM COUNTY NC LUNDAYA. RIGGSBEE REGISTER OF DEEDS FILED Sep 07, 2023 AT 11:47:45 am BOOK 02380 START PAGE 0169 END PAGE 0170 INSTRUMENT # 07926 EXCISE TAX (None) NON -DISCHARGE WASTEWATER SYSTEM WAIVER AGREEMENT TO WAIVE SETBACKS AS REQUIRED BY 15A NCAC 02T .0506(a), .0506(b), .0606(a), .0706(a) AND .1006(a) 1, Joel Carpenter (printed name), certify that I am a deeded owner or an authorized agent of the property located at: Address: 997 Marthas Chapel RD (Marthas Vineyard Lot 2) Parcel No.: 96070 City: Apex State: NC Zip Code: 27523 County: Chatham Furthermore, I certify that I am authorized to make decisions regarding this property, and that I do hereby agree that the setback distances cited below be granted to the Applicant/Permittee listed on the following page. I understand the setback requirements set forth in 15A NCAC 02T. For the parcel identified above, I consent to the following reduced setbacks: ❑ Wastewater Irrigation/Infiltration Setback to Property Lines The required setback of feet is reduced to feet, thereby allowing wastewater effluent irrigation or infiltration no closer than feet from my property line. ❑ Wastewater Irri2ation/Infiltration Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing wastewater effluent irrigation or infiltration no closer than feet from my residence(s) or place(s) of assembly. Wastewater Treatment and StoraEe Unit Setback to Property Lines The required setback of 50 feet is reduced to 10 feet, thereby allowing the construction of wastewater treatment and storage units no closer than io feet from my property line. ❑ Wastewater Treatment and Storage Unit Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my residence or place of assembly. (� Signature: Date: 1 /07 /? 7 FORM: NDWS 02-1 -7­252 k1l O/en. c iu <-/ t✓ C Page 1 of 2 BK 2380 PG 0170 Applicant/Permittee: Joel Carpenter Permit No.: Address: 919 Marthas Chapel RD (Marthas Vineyard Lot 2A) Parcel No.: 96071 City: Apex State: NC Zip Code: 27523 NORTH CAROLINA, Wa Kr COUNTY County: Chatham 1, � At, _ 'Sj ► A.�D , a Notary Public for �hj County, North Carolina, do hereby certify that -1p,r d—T�..�5 personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the day of `en*e rj.f_r SEAL REVA SUTTON Notary Public, North Carolina Signature of Notary Public (9 Wake County My Commission Expires May 07, 2025 MY commission expires t)5- O_j- ,2S Once notarized, this form shall be recorded at the Register of Deeds in the county or counties in which the described properties are located. A copy of the recorded waiver shall be sent to the following address: Division of Water Resources Non -Discharge Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDWSW 03-17 Page 2 of 2 BK 2380 PG 0167 State of North Carolina Department of Environmental Quality Division of Water Resources FILED CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Sep 07, 2023 AT 11:47:13 am BOOK 02380 START PAGE 0167 END PAGE 0168 INSTRUMENT # 07925 EXCISE TAX (None) NON -DISCHARGE WASTEWATER SYSTEM WAIVER AGREEMENT TO WAIVE SETBACKS AS REQUIRED BY 15A NCAC 02T .0506(a), .0506(b), .0606(a), .0706(a) AND .1006(a) 1, Joel Carpenter (printed name), certify that I am a deeded owner or an authorized agent of the property located at: Address: 139 Marthas Vineyard Dr (Marthas Vineyard Lot 3) Parcel No.: 85291 City: Apex State: NC Zip Code: 27523 County: Chatham Furthermore, I certify that I am authorized to make decisions regarding this property, and that I do hereby agree that the setback distances cited below be granted to the Applicant/Permittee listed on the following page. I understand the setback requirements set forth in 15A NCAC 02T. For the parcel identified above, I consent to the following reduced setbacks: ® Wastewater Irrieation/Infiltration Setback to Property Lines The required setback of 50 feet is reduced to 10 feet, thereby allowing wastewater effluent irrigation or infiltration no closer than 10 feet from my property line. ❑ Wastewater Irrigation/Infiltration Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing wastewater effluent irrigation or infiltration no closer than feet from my residence(s) or place(s) of assembly. ❑ Wastewater Treatment and Storage Unit Setback to Property Lines The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my property line. ❑ Wastewater Treatment and Storage Unit Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my residence or place of assembly. r-,, A Signature: Date: `% /d7 fZpZ 3 FORM: NDWSW �O2- C41e� 0 wok ?9! 2 7 SG Page I of 2 BK 2380 PG 0168 Applicant/Permittee: Joel Carpenter Permit No.: Address: _ 919 Marthas Chapel RD (Marthas Vineyard Lot 2A) Parcel No.: City: Apex State: NC Zip Code: 27523 NORTH CAROLINA, W o—KC— COUNTY 96071 County: Chatham I, —ae VIC-- , a Notary Public for WCX kc County, North Carolina, do hereby certify that Sn�r` CASAes personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the A day of _6-e.q4--r_mb-er, a" SEAL,�T-� FiEVA SUTTON Notary eubl'c. North Cafolina Signature of Notary Public Wake County jon fifes MY C A� v 07. 202bp My commission expires �S — !�, — S Once notarized, this form shall be recorded at the Register of Deeds in the county or counties in which the described properties are located. A copy of the recorded waiver shall be sent to the following address: Division of Water Resources Non -Discharge Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDWSW 03-17 Page 2 of 2 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Soils Evaluation MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 4:0 PIEDMONT ENVIRONMENTAL ASSOC I A T E S, P. A. 7/19/2023 REVISED 1/11/24 Carpenter Companies PO Box 891 Morrisville, NC, 27560 Project 4 3310 Soils Report for Proposed Residential Surface Spray Wastewater Irrigation System Project Name: Marthas Vineyard, Lot 2A Location: Martha's Vineyard Way, Apex, Chatham, PIN: 0019629 (Approx. 7 acres) A detailed soil evaluation on the above referenced tract was conducted to determine suitability for a subsurface or surface wastewater system. This report is being prepared to satisfy the requirements set forth by 15A NCAC 02T.0600 concerning the soils report for single family surface wastewater systems since this property does not contain enough suitable soils to support a 5-bedroom subsurface septic system. The location and characteristics of a site that is potentially useable for a surface drip irrigation wastewater system was identified. This report details our findings and provides the necessary soil/site information needed for a surface irrigation system to be designed by a professional engineer. This fieldwork was completed in January, 2022. Site conditions have not changed as of re -submittal of this soil report in January of 2024. The potentially useable soil area was located in the field and is shown on the accompanying soils map (Attachment 1). The proposed disposal area is compliant with buffers for surface wastewater systems. The map also shows the locations where measurements of saturated hydraulic conductivity (Ksat) were performed. This site is located in the "Triassic Basin" geologic unit of Chatham County. Upland soils on the site are generally similar to the Creedmoor-Green Level Complex soil series. These soils have expansive clay mineralogy and may have indications of soil wetness present in the subsurface horizons. Soil wetness indicators are considered to be perched based on guidance and interpretations of the Chatham County soil survey document. These types of soils are generally unsuitable for conventional subsurface septic systems. However, the favorable soil characteristics of the surface horizons offer the opportunity for surface application of treated wastewater. Soil Evaluation The soil condition of the proposed wastewater area is described with the borings shown on the attached soils map, as well as in the accompanying Ksat location soil profile descriptions (Attachment 2). 216 S. Swing Rd., Suite 1 Y. Greensboro, NC 27409 /1 336-662-5487 The landscape position for the proposed irrigation field is on a broad side slope with a sandy loam A horizon. We recommend a maximum instantaneous irrigation rate of no greater than 0.2 in/hr for design purposes. Measurements of saturated hydraulic conductivity (Ksat) were conducted within the Bt horizon at five locations within each of the two proposed drip disposal area. The Bt horizon was tested because it was the most restrictive soil horizon based on texture and mineralogy. The geometric mean Ksat of the native Bt horizon (most restrictive) was 0.007 in/hr. Ksat calculations and field data are shown in Attachment 3. Single Family Loadine Rate Worksheet A single-family water balance calculation was conducted per the above referenced regulation. Based on the geometric mean Ksat and our field observations, these soils fall under Loading Rate Group SFR-C and could therefore be loaded from 13.0-19.5 in/yr. Parameters utilized in the SFR Irrigation Area Calculation Worksheet are described below: Potential Evapotranspiration (PET) and 80th Percentile Irrigation: Data from a nearby site (RDU International Weather Station) for a 58 year period was utilized in the model per NC DWQ policy guidelines for these parameters. This data is shown in the attached SFR Irrigation Area Calculation Worksheet (Attachment 4). Drainage Rate and Discussion of Drainage Coefficient Utilized in the SFR Irrigation Area Worksheet: We are proposing a drainage coefficient of 60.7%, which results in an actual Annual Hydraulic Loading Rate of 18.67 inches/year. Drainage coefficients were first introduced by US EPA as a way of "penalizing" wastewater movement through the soil profile since it was assumed that wastewater carried concentrations of organic substances that would form a "biomat", subsequently retarding the rate of this wastewater movement over time. It is generally held that the cleaner the wastewater, the higher the drainage coefficient that could be specified. Unfortunately, to our knowledge, no rigorous scientific testing has been conducted to assess how this coefficient can vary as a function of wastewater treatment. In this case, a relatively high level of treatment (TSII) is specified for the proposed waste stream, and a drainage coefficient of 60.7% allowed for an annual irrigation rate that was in the range of appropriate values for the loading rate groups provided by NC DEQ. Similar annual loading rates have been specified for soils in this region by NC DEQ for many years. In the case of this submittal, the Ksat data were found to be relatively consistent with one another. We recognize that the subsoil is restrictive as evidenced by the perched soil wetness indicators, but the proposed drain field is located mostly on a broad linear side slope with 6-7% slopes, thereby preventing ponding of any applied wastewater. The soil characteristics are also consistent with one another as evidenced by the soil boring logs and soil profile descriptions, suggesting that unexpected soil inclusions should not be of concern. Standard Fertility Analysis Soils within the proposed spray area were also analyzed for current fertility conditions. Because of similar landscape type and management conditions, one composite sample was used to infer soil fertility status within the proposed dispersal area. The standard soil fertility analysis was completed by Waypoint Analytical Laboratories, Inc. Soil sample results are included in "Soil Analysis Report" provided by Waypoint Analytical (Attachment 5). Base saturation and exchangeable sodium percentage were determined by calculation to be 56% and 1.45% respectively. Appendix 5 also contains information on other soil parameters such as specific nutrient indices and pH. Conclusions Site disturbance could create unsuitable conditions for the proposed system and should therefore be minimized prior to construction. A permanent vegetative cover should be immediately established and/or maintained over the entire application field after installation. An individual wastewater system permit will be required for this property prior to obtaining a building permit. This will involve a detailed evaluation by the state to determine, among other things, system size and layout, drive/parking and building location. Only after developing this information can a final determination be made concerning specifics of system design and site utilization. The letter of denial regarding subsurface septic systems issued by Chatham County Environmental Health should also be included in the application for a surface application system. If you have any further questions, please feel free to call (336) 662-5487. Sincerely, G. Christopher Murray, MS NC Licensed Soil Scientist Piedmont Environmental Associates, PA List of Attachments: Attachment 1 - Soil Map Attachment 2 - Soil Profile Descriptions at Ksat Locations Attachment 3 - Ksat Summary and Field Data Attachment 4 - SFR Irrigation Area Workbook Pages (Including Project Information, Potential Evapotranspiration Worksheet, 80' Percentile Precipitation Worksheet and Irrigation Area Calculation Worksheet) Attachment 5 - Standard Fertility Analysis m@§smd « > > - Q} © b7C3 a) ! z ssa ,§S @ > > ^ 2 v `\ w �to aC.)\ 41 � R w t cl Z- _, - 100- �umm�oo Pm t \ \ o $ e IXu W 5 0 / N . z_ �- W ]dam -a man s / ]ZI S.a mon S / / / e 2 \ CD I \ E k E ]OVUg - a m,mlS $ / / / _ -a _ 2 E a > > a mxa 7 u\ w 7 \ \ % 3 \ \ n pm;S &mmom \ \ \ ° / \ 0 a E E E 0g@ g e o Q It 3 \ E e& E O O \\� 2 E§ 2� � o CO g g • a �auo x pa k k 2@= 2 f 2\: A /ƒ 2 � © g o E. EL u= 0 0 E ®t __ ��� + ) \ \ ais emom / / & 0- & E \ \ 7 E / f e3u ep ngVemom , o o _ % / m % E \ c \ \ \ sjo ma emom / / ƒ E f . / 5 g 72 \ m \ \ % \ \ 'IT 00f m m = G = f f ,omo mm a (If e \ � \ \ \ \ $ E > z > » E § 3/ a co § f k>1 ¥ 2 sa m � � = k z c ® = 2 - - \ % ^ 2 q& 7 7 2 2 q+ 7 a 5� uOzIJOH 2 3- a 2 0 2\ 7\ ■ 2 z \ Ow. Z\ 100- u W 50 ZVI W« L7-A: I \ \ E n z m@§smd « >L-L > ® � \ � b ) ssa DJ,§S @ > > m 5 \ c \ \ l§ ,ummsuooPm t \ \ 4 0 $ \ - � o ]dA.a man S 8 \ \ ƒ m / 2 _ _ _ } ]ZI S.a mon S E E E2 \ % 2 / W E m E ]OVUg - a m,mlS $ / / \ _ $ / / � . 7 2 ®/ ® 2 E a : > � > a mxa 7 u\ 7 w 7\\ :: 2: pm;S &mmom \ / / E ' \ R �,Mz • a �auo x Pa ' ) k \ aisemom , 0 0 0 e3u ep ngVemom ' \ / \ / { \ emom a a a \ \ \ f00ff =G=m ,omo xiijew a a E \ \ \ \ § E a m 2 ƒ E * ®\ % u o 2 = E \ 70 - 2 % sa m 2 % n - % §: e& a 3 2 2 e e Fn x 5� uo H< 3 O 0 r - a 2 0 2\ 7 W ■ 2 A< z: o .: z: Do.W k) K §: � L I ! co \) m A< z: o .: z: Do.W k) K §: � L I ! co \) m A< z: o .: z: Do.W k) K §: � L I ! co \) m Appendix 3, Geometric Mean Ksat Data, Martha's Chapel Lot 2A, Jan 2023 Nest Horizon Depth(") Ksat (in/hr) N1 Bt 12 0.003 N2 Bt 12 0.017 N3 Bt 27 0.002 Geometric Mean Ksat: Horizon Ksat (in/hr) Bt 0.005 NEW DATA BELOW Appendix 3, Geometric Mean Ksat Data, Martha's Chapel Lot 2A, Jan 2024 Nest Horizon Depth(") Ksat (in/hr) N4_NEW Bt 16 0.013 N5 NEW Bt 20 0.009 REVISED Geometric Mean Ksat: Horizon Ksat (in/hr) Bt 0.007 INFORMATION SITE ID # Lot 2A Nest 1 LOCATION COORDINATE SYSTEM Date 1 /13/23 Measurement Conducted By CM/SR Job Name Martha's Chapel Rd Job Number 3928 Weather Condition Temperature Soil Horizon Bt Source of Water Depth of Hole 12 Radius of Hole 2.54 Initial Depth of Water in Hole (H) 15.24 cm Final Depth of Water in Hole (H) 15.24 cm Ratio H/r 6.0000 Start Saturation Time Start of Stead State Condition Time No. of Reservoirs Used at Stead State 1 A factor in Equation 2 of Manual 0.001127 Hole Depth: 12 30.48 H,: 6 15.24 Hf: 6 15.24 Clock Time Water Level ReadingWater Time Interval Change in Level Flow Volume Flow rate Q Flow rate Q Ksat Ksat Equivalent Ksat cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/dayd/s . ft 9.08 6.9 10.38 6.5 90.00 0.4 8 0.09 5.3 0.006 0.14 0.04 11.51 6 73.00 0.5 10 0.14 8.2 0.009 0.22, 0.05 12.52 5.75 61.00 0.25 5 0.08 4.9 0.006 0.13, 0.03 14.20 5.35 88.00 0.4 8 0.09 5.5 0.006 0.15, 0.04 15.15 5 55.00 0.35 7 0.13 7.6 0.009 0.21 0.05 - biljerage 0.007 AVERAGE cm/hr: 0.007 in/hr: 0.003 INFORMATION SITE ID # Lot 2A Nest 2 LOCATION COORDINATE SYSTEM Date 1 /13/23 Measurement Conducted By CM/SR Job Name Martha's Chapel Rd Job Number 3928 Weather Condition Temperature Soil Horizon Bt Source of Water Depth of Hole 12 Radius of Hole 2.54 Initial Depth of Water in Hole (H) 15.24 cm Final Depth of Water in Hole (H) 15.24 cm Ratio H/r 6.0000 Start Saturation Time Start of Stead State Condition Time No. of Reservoirs Used at Stead State 1 A factor in Equation 2 of Manual 0.001127 Hole Depth: 12 30.48 H,: 6 15.24 Hf: 6 15.24 Clock Time Water Level Reading Time Interval Change in Water Level Flow Volume Flow rate Q Flow rate Q Ksat Ksat Equivalent Ksat cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day d/sq. ft 10.55 9.3 13.23 5 148.00 4.3 86 0.58 34.9 0.039 0.94 0.23 13.47 4.1 24.00 0.9 18 0.75 45.0 0.051 1.22 0.30 14.07 3.5 20.00 0.6 12 0.60 36.0 0.041 0.97 0.24 14.55 2 48.00 1.5 30 0.62 37.5 0.042 1.01 0.25 15.22 1.1 27.00 0.9 18 0.67 40.0 0.045 1.08 0.27 15.38 1 0.61 16.001 0.51 101 0.631 0.042 1 1.01 0.25 AVERAGE cm/hr: 0.043 in/hr: 0.017 INFORMATION SITE ID # Lot 2A Nest 3 LOCATION COORDINATE SYSTEM Date 1 /13/23 Measurement Conducted By CM/SR Job Name Martha's Chapel Rd Job Number 3928 Weather Condition Temperature Soil Horizon Bt Source of Water Depth of Hole 27 Radius of Hole 2.54 Initial Depth of Water in Hole (H) 15.24 cm Final Depth of Water in Hole (H) 15.24 cm Ratio H/r 6.0000 Start Saturation Time Start of Stead State Condition Time No. of Reservoirs Used at Stead State 1 A factor in Equation 2 of Manual 0.001127 Hole Depth: 27 68.58 H,: 6 15.24 Hf: 6 15.24 Clock Time Water Level Reading Time Interval Change in Water Level Flow Volume Flow rate Q Flow rate Q Ksat Ksat Equivalent Ksat cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day d/sq. ft 9.19 7.1 10.33 6.2 74.00 0.9 18 0.24 14.6 0.016 0.39 0.10 11.41 5.9 68.00 0.3 6 0.09 5.3 0.006 0.14 0.04 12.48 5.6 67.00 0.3 6 0.09 5.4 0.006 0.15 0.04 14.15 5.2 87.00 0.4 8 0.09 5.5 0.006 0.15 0.04 15.11 5 56.00 0.2 4 0.07 4.3 0.005 0.12 0.03 - biljerage 0.006 AVERAGE cm/hr: 0.006 in/hr: 0.002 INFORMATION SITE ID # Lot 2A Nest 4 New LOCATION COORDINATE SYSTEM Date 1 /4/24 Measurement Conducted By CM/SR Job Name Martha's Chapel Rd Job Number 3928 Weather Condition Temperature Soil Horizon Bt Source of Water Depth of Hole 16 Radius of Hole 2.54 Initial Depth of Water in Hole (H) 15.24 cm Final Depth of Water in Hole (H) 15.24 cm Ratio H/r 6.0000 Start Saturation Time Start of Stead State Condition Time No. of Reservoirs Used at Stead State 1 A factor in Equation 2 of Manual 0.001127 Hole Depth: 16 40.64 H,: 6 15.24 Hf: 6 15.24 Clock Time Water Level Reading Time Interval Change in Water Level Flow Volume Flow rate Q Flow rate Q Ksat Ksat Equivalent Ksat cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day d/sq. ft 12.32 45.2 13.01 44 29.00 1.2 24 0.83 49.7 0.056 1.34 0.33 13.55 42 54.00 2 40 0.74 44.4 0.050 1.20 0.30 14.32 41.4 37.00 0.6 12 0.32 19.5 0.022 0.53 0.13 15.031 40.21 31.00 1.21 241 0.771 46.51 0.052 1 1.26 0.31 15.33 39.5 30.00 0.7 14 0.47 28.0 0.032 0.76 0.19 16.06 38.7 33.00 0.8 16 0.48 29.1 0.033 0.79 0.19 16.34 38 28.001 0.7 14 0.50 30.01 0.034 0.81 0.20 17.03 37 29.001 0.7 14 0.48 29.01 0.033 0.78 0.19 - rAverage 0.033 AVERAGE cm/hr: 0.033 in/hr: 0.013 INFORMATION SITE ID # Lot 2A Nest 5 New LOCATION COORDINATE SYSTEM x Date 1 /4/24 Measurement Conducted By CM/SR Job Name Martha's Chapel Rd Job Number 3928 Weather Condition Temperature Soil Horizon Bt Source of Water Depth of Hole 20 Radius of Hole 2.54 Initial Depth of Water in Hole (H) 15.24 cm Final Depth of Water in Hole (H) 15.24 cm Ratio H/r 6.0000 Start Saturation Time Start of Stead State Condition Time No. of Reservoirs Used at Stead State 1 A factor in Equation 2 of Manual 0.001127 Hole Depth: 20 50.8 H,: 6 15.24 Hf: 6 15.24 Clock Time Water Level Reading Time Interval Change in Water Level Flow Volume Flow rate Q Flow rate Q Ksat Ksat Equivalent Ksat cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day d/sq. ft 12.34 44.3 13.03 43.7 29.00 0.6 12 0.41 24.8 0.028 0.67 0.17 13.56 42.6 53.00 1.1 22 0.42 24.9 0.028 0.67 0.17 14.33 42 37.00 0.6 12 0.32 19.5 0.022 0.53 0.13 15.04 41.8 31.00 0.21 4 0.13 7.7 0.009 0.21 0.05 15.35 40.9 31.00 0.91 18 0.58 34.8 0.039 0.94 0.23 16.07 40.4 32.00 0.5 10 0.31 18.8 0.021 0.51 0.12 16.35 39.9 28.00 0.5 10 0.36 21.4 0.024 0.58 0.14 17.05 39 30.00 0.51 10 0.33 20.0 0.023 0.54 0.13 - rAverage 0.023 AVERAGE cm/hr: 0.023 in/hr: 0.009 Project Name: Marthas Vineyard Way Lot 2A Facility Address: Across from 1032 Martha's Chapel Rd. Apex, NC 27523 County: Chatham County, NC Prepared by: G. Christopher Murray, L.S.S. Project Design Flow = 600 gal/day # of Bedrooms Required Flow 2 bedrooms 240 gal/day 3 bedrooms 360 gal/day 4 bedrooms 480 gal/day 5 bedrooms 600 gal/day 6 bedrooms 720 gal/da SFR-LRW 9-08 Project Name: Marthas Vineyard Way Lot 2A Location of Temperature Data: RDU Int. Airport - Raleigh, NC Starting Year of Data Record: 1948 Ending Year of Data Record: 2006 Period of Record (years): 58 Source of Data: State Climate Office of North Carolina Site Latitude (degrees) 35.79 within range Calculated PET: 33.45 inches Mean Monthly Temperature (degrees F) Daylight Hours 112 Heat Index Calculated PET (inches) January 41.1 0.87 1.02 0.29 February 44.8 0.85 1.70 0.50 March 51.2 1.03 3.15 1.20 April 59.4 1.09 5.40 2.30 May 67.6 1.21 8.02 3.96 June 75.6 1.22 10.90 5.55 July 79.0 1.23 12.21 6.39 August 77.7 1.16 11.71 5.74 September 71.1 1.03 9.24 3.92 October 60.6 0.97 5.76 2.19 November 51.5 0.86 3.22 1.02 December 42.6 0.85 1.28 0.37 Total = 73.61 33.45 SFR-LRW 9-08 Project Name: Marthas Vineyard Way Lot 2A Location of Precipitation Data: RDU Int. Airport - Raleigh, NC Starting Year of Data Record: 1948 Ending Year of Data Record: 2006 Period of Record (years): 58 Source of Data: State Climate Office of North Carolina 80th Percentile Annual Precipitation: 54.48 Total = Mean Monthly Precipitation %of Mean Annual Precipitation 80th Percentile Monthly Precipitation 3.60 8.21 4.47 2.88 6.57 3.58 4.30 9.80 5.34 3.06 6.98 3.80 2.26 5.15 2.81 2.93 6.68 3.64 5.51 12.56 6.84 5.00 11.40 6.21 5.81 13.25 7.22 2.90 6.61 3.60 2.75 6.27 3.42 2.86 6.52 3.55 43.86 100.00 54.48 SFR-LRW 9-08 Project Name: Marthas Vineyard Way Lot 2A Design Flow = 600 gal/day SFR Loading Rate Group: SFR-C Limiting Soil Ksat = 0.007 inch/hour Drainage Coefficient = 0.607 Drainage Rate = 0.101976 Annual Hydraulic Loading Rate = 18.67 inch/yr Irrigation Area = 18,819 square ft 0.43203 acres inch/day (Formula: Ida,' Drainage Coefficient' 24) Number of Days in the Month PET in/mo Vertical Drainage inlmo 80th Percentile Monthly Precipitation in/mo Maximum Allowable Irri ation in/mo Maximum Allowable Irrigation allons/da Maximum Allowable Irrigation allons/month January 31 0.29 3.16 4.47 0.00 0 0 February 28 0.50 2.86 3.58 0.00 0 0 M arch 31 1.20 3.16 5.34 0.00 0 0 April 30 2.30 3.06 3.80 1.56 610 18,307 May 31 3.96 3.16 2.81 4.31 1,632 50,606 June 30 5.55 3.06 3.64 4.97 1,945 58,352 July 31 6.39 3.16 6.84 2.70 1,024 31,735 August 31 5.74 3.16 6.21 2.69 1,020 31,605 September 30 3.92 3.06 7.22 0.00 0 0 October 31 2.19 3.16 3.60 1.75 663 20,559 November 30 1.02 3.06 3.42 0.67 261 7,836 December 31 0.37 3.16 3.55 0.00 0 0 TOTAL = 365 33.45 37.22 54.48 Formulas: (Max. Allowable Irrigation) = (PET) + (Drainage) - (Precipitation) SFR Loading Rate Table SFR Maximum Annual Geometric Mean Loading Loading Rate Ksat Range Rate (i n/y r) (i n/h r) GrouD Low - High Low - High SFR-A 26.0 - 50.0 >0.05 SFR-B 19.5 - 26.0 0.015 - 0.05 SFR-C 13.0 -19.5 0.003 - 0.015 SFR-D 0.0 -13.0 0.0 - 0.003 Assignment to a SFR Loading Rate Group for each 15A NCAC 02T .0600 permit application shall be determined by the geometric mean of insitu saturated hydrualic conductivity data collected in the most restrictive horizon for each soil mapping unitwithin the irrigation area. 18.67 7155.37 219,000 Required Flow 2 bedrooms 240 gal/da 87,600 galtyr 3 bedrooms 360 gal/day 131,400 gal/yr 4 bedrooms 480 gal/day 175,200 gal/yr 5 bedrooms 600 gal/day 219,000 gal/yr 6 bedrooms 720 gal/day 262,800 gal/yr Maximum allowable irrigation: 219,000 gal/yr The Maximum Allowable Irrigation number must be greater than or equal to the required flow. SFR-LRW 9-08 Waypoel t. ANALYTICAL Client: Piedmont Enviromental Assoc., P. A. 216 South Swing Road Suite 1 Greensboro NC 27310 Lab No: 22062 2850 Daisy Lane, Wilson, NC 27896 Main 252-206-1721 ° Fax 252-206-9973 "Every acre... Every year®' www.waypointanalytical.com Grower : Report No: PIEDMONT ENVIRONMENTAL Cust No: Date Printed: Date Received PO: Farm: MARTHA CHAPEL Page Field: Sample ID: 2A SOIL ANALYSIS 23-170-0524 06526 06/21/2023 06/19/2023 2 of 4 Test Method Results SOIL TEST RATINGS Calculated Cation Exchange Capacity Very Law Low Medium Optimum Very Hig&A Soil pH 1:1 4.9 � i �� T 6.6 meq/100g Buffer pH BPH 6.64 %Saturation Phosphorus (P) M3 24 ppm %sat meq K 1.9 0.1 Ca 33.1 2.2 Mg 20.5 1.4 H 43.9 2.9 Na 0.8 0.1 Potassium (K) M3 49 ppm Calcium (Ca) M3 437 ppm Magnesium (Mg) M3 162 ppm Sulfur (S) M3 8 ppm Boron (B) M3 0.1 ppm Copper (Cu) M3 0.5 ppm Iron (Fe) M3 181 ppm K/Mg Ratio: 0.09 ❑ Manganese (Mn) M3 15 ppm Ca/Mg Ratio: 1.61 ❑ Zinc (Zn) M3 2.4 ppm Sodium (Na) M3 12 ppm Soluble Salts Organic Matter LOI 0.3 Estimated N Release 47 Ibs/acre Nitrate Nitrogen SOIL FERTILITY GUIDELINES Crop Rec Units: (Ibs) LIME (tons) N PZOS KZO Mg S B Cu Mn Zn Fe Crop : Rec Units: Comments : M3 - Mehlich 3 BPH - Lime Index HIM - Humic Matter LOI - Loss On Ignition 1:1 - Water pH Analysis prepared by: Waypoint Analytical Carolina, Inc. Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Engineering Plans 2G�3 MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 OOL-0 ON'A1Nf100 WVHIVHO 1N3WIV3M13Md II-Sl HIM EZILZISO :3iy0 M916LE(6L6):XVd 6£ZLY94(6LG):131 09SLz HNIlONVO HiMON'3111ASINNOW c J 'd SaIL'TOosS`j 2Y a0't09s00 133H6 S%31SAS dIM030tldMf1S :# 80r ELSLZ VNIZIONVO HIIHON'ANVO 111TI �7�ODOEy HOr'JAV IMOO OMtlA3NIA S.VH1MVW VZ 10� EOL 31V1S'3NVI 31NIOd 30VOSVO LDS 1 �7j�LL�I �L 011'01MUNIA S.VH1MVW 'A8 a0 �= y 2 0 GPP, TN „ \ U z ®� 0 ¢ U r J w J C C -Z CD Y li Jo 0 W WC O �(L a C CD � N (' z u)a d20z Z Uwz0u)n 2 } a LO:i z P=aoJF�wz WO w _ aia y/AJd- ---------LLLL LL LL LL LL LL LL LL LL LL 0 0 a Li O Ids W w OSUHaZF JM W zozNzQzQUz 000000000a W JMQ JwQ wow-' -Ne tM W 1-MM �r 1.6 W O C LL a' a� W i�?} R' W Q H F J J wwwwww JJw JJ 0 z C .. 0 w > Z WFzwQaa -LLa ZN_ww-ww_a aaaaaaaaaaa a� a z OU -Oam ����f-�f-f-�f-f- 00000000000 W J am�O�-Wi W a 0 LL w _ U U) y fA a �� ����� o0000000000 a z U wd L L t £ZOZ' Ld Bny 05MP'J.AO0- OO'tO58O0\s6ul-J0\OIIS-uO- W 101- pJuAOulA s,eyuOW - 011 'WWWA s,uglJOW - 00't0580O\£Z0Z\AJuJq!l\(s10Ofmd) Onu4-1\:2 ON'AIMOO WtlHIVHD £ZI 10 404-0 :RVn I OLS9-6L£ 16L6):XVd 6£ZVL94(6L6):131 lN3WlV9Nl3Nd II -Si HIM 095LZ VNI10?JVO H12IDN'3111ASIHNDW W 31SAS dRl❑ 3Otld21f1S 6ZL XO8 '0'd S310N 9�P ELSLZ VNIIOHVDHINON'Aldvo 7 7 7�7A7O���TA7 Ib4l3N3J O21tlA3NIA S.tlH121tlW tlZ 101 Hdf'dAtl £OL 311f1S'3Ntl131NlOd 3DtlOStlO LOS 1 171�11�L Y �L 0l'1'O21VA3NIA S.VH1NVW :As ._ o m o >� �s & �aa wp �N Ia aa� pw<o o z �X worm o - �~ w cm ao o= - m wN�n w a OJ w p 3 m z_ " O N N } " 3 r 3 x F " .x.. mO o o d J o W N m ~ 3 z x 3 z U w K d Z w F K z D y y O c] m _ o `' o z" w a A 3 o e m ' a z a w a 1.- x=��o w o? o a z- z N g g o K z uz d N w- o a p a w o N N d o z - G r x Ou 3 p p z w J F;? o �. 5 p o a p N o g m r g m o o s p o 3 p w w p w z �. g a m i w y 0 w Q z g v m K > i w ¢ j o ppo wzaa z pu�� <pNoo'G"p " a o z 0 a m o s m ps J ~ cxi rc J w _ z e 111 p a ? x ; a w w u o o N a N o m z g aWw r 3 N Z o Q w w o o o w o w w o w _ "ffiS z �a Gam z x N 3 U p w x pO m d z z - N o i t Ofw p -? p o a " p rc t w r r 3 m 3 N m a w 0 a o m " r " ILI IL I u o uwi oaf " w w �n to r r f n Q o o O oz O - SUU O - O O O _ O zz lw o o m O o o ¢ N 0 5 5 - p Iz w w o w o s _ o o - o Wo I - 5 o o r o - F o o a 0 o z o y v a y F o o w Ls - cz o o - o� o® wo_ _ u m w o j- Z K 4 N z � U z - o O o o a a_ a - o p rc z a o z rz - p r O n aao w o wa u o m- - z z w s o p a l N dl p z tt N r. o wa z o o p= te r `u^ � J w a a Q X a o J j W m j a w j w o o _ a w S N 5 r r s u r a d a x m i¢ 0 0 0 �S Q O a¢ m 3 p p 0 a 0 U¢¢ " d 0 2 3 N p '¢ O w vat z a a- O 9 z 0 o 0 w N ' Or 3 Z U p w S rxn 7 3 O" w w G J O x o O 3 C w U; z z O p a r_- o w az w r y a w Ci F J W a .n O o p " w z y w. a L 4 z-m ¢ O 'z a- a o o a 0 0 `m. w m Z z o a u p r m" s z a a O w �_ m r w w- z a?~ ui my a a i Om 3 zp z O O g d d m a Z w w p 2 J m N w g Q; 5 w z o V 5 o o w w 3 S O¢ a.� N Z- r o vYi O N p p - O - c z a a p m a$ w p t z ? 5" rz w 's m o w oz O S 0 3 3 it ¢ m¢ d wO U"yl 'J .& a o z z_- z w Q p U O p K u�i c4i w" " p 0 G w O m m w o 2 - 3 0 K 'o a rc- " 2 0 0 0 w U ¢-¢ O p a N ro K " N" r ¢ w¢ cf O d d z J N z O _ cn m - w O r z y 3 m m z z> z d ¢ a d m g z p p Z O UO m N$ o o Q p p m to UI o K i Q 0 ¢ N i z-z j G o a Q z w O O z " " z m > p z o 0 0 0 z¢ O a F - d ? OU o j a o ti y 0 o w O a -a.<w<a< w wwa wo<3�zaw a3z g �� o o< o o pm 5 0 0 3<> z x x p n LL a o a<< s . i CA LU a Z J a (U H (U W J LL \ - O z d O K d K 1u11 a m w O 3 K O W w tt 2 - � O a O z W o " O m -z< j p or J Q a m p o s - s a w p s o o o o a w - z mz o F o lco_ a o o& j o a a o o > w J " s z 0 1 3 N p - w z m w v 3 cAz p o r d o u Q o� o w -o - o m a w o _ z o a v o y z w a a a¢ i o o o " " " o O O O p a p w z m w o O w < z u _ O w ¢¢ O< ; Z U d w '.. p i c m 3 i N N - -_ a rn cgi p i r _ to o O K o o m$ a O S o w~ - u cg � p " N IW o o m o P �'1 J w I W -- - X' Q d U - `z OJ z o z 2 z a x ~ J a O w a s - S O C a b r2 mll p V 3 N W O W W W K K K-_¢¢ O O 2 O o_ w-uO m ? 2 0 5 o w Q z om wo w C O Q O X wzz wa=osmo�a m z w w a " w ou z r o o - ap p z w s o o d r r ffir m U U U U r a r a VI ¢¢¢ 6 »kLrom_e mom, ZU a< ,_mi& _ 6CZVL9 ,&& 39m3HOS !em_a9lAd _gym_ ___ _,m, «� a' _aa•D•3 %a�oOSSV �mm�� W _o� _s : £r ,� / 0 an ,s.LVn3Ha aVA3 _sHIMmVZ 10-1 m' m_sar_a30VOSVam n&&a : \ , 7G k$ lK wz o , z \\ p _ K® ( >) ° ~ ` G . Q` � 9in o .� � \ `....... i : ! w � z^ � a \/ a ®` Q \(> _ w �� ° ! I :-.� e / 10 w ! §\)� y -wz ) \ S)_2 U) } ( 2/ z o w F- - , « \� \ �� � \ § 2 2( ) mi K ( IN 2 § - 4§ §/ )� ( - - /� / 2 ) i� / \/o (� w wa z)§ ;! /; !§ ) j \ (f \!§ § ] } (f /w22 a/ /> !;) e § 2� , § ( ,\j!):m 8� zw, �k !- \§ /! % j \\ /§ /% /) /// / §} ®.; : /« %%/t m~ »z, Q: %Gm « ! A _® §»E zz §! ] § !§l�,�! :!!^ !®!§ °!J m:�!® !2 , �, m § §: ® 5 e®.&y ag,;ey.y§R: *k:/!/ / /§6 \\ //9g /2 26 R»Qy, w �`! \ §: `k �m §, !J §!§� |:§§j!m§ |!;u |!,; !§m z. ` ! § ! / ° , ! § 4 4 §} \ ) ! \ \ } \ § \ \ § § § } ! c § § § § : § § - $ \ m 2 \) \ / �� . B!\ 3 ( ( / _ z ON'UMOO WtlHIVH0 £ZILZI80 E04-0 :3VOLS-L166:tl6£ZVL94(6L6):131 2d'Sl HIM '3111ASRRDW D 'd `SaTptZ)OSSV W1N3WlV9Hl3a 09SLZ VNI101dVO HI'dON'W31SAS dRO 30V=lNnS 6ZL XO8 'Od NVId 3AS I eOfELSLZ VNIZIONVO HIIION 'ATIVO 7 7 7�7A7O���TA7 llVU3AO aNVA3NIA S.VHINVW VZ 101 Haf 'iAV £OL 31ins'3NVI 31NIOd 3Otl0SVO LUS 011'O21tlA3NIA S.tlH121tlW axe OO �1 M O CN � / p' ._ ••'gyp-�,. i, l J Q U CD i Np 31bNyy I � \ S Bblyb zw n % w ¢omo-z ' M✓ U U 5 wZZ3z \zr/— \ \ O m nrW w m N ll S\ b J J F \ mo n 0 z9 E Iz zN n GG z m pp I U w o II \ 6� �J LU s9 LU I ii Hi, ....... l,-i r—i 1704-O ON'UMOO WtlHIVH0 £ZILZI80 :3V OLS-L166:V6£ZVL94(6L6):131 2d'Sl HAM a '3111ASRRDW D 'd `SaTptZ)OSSV W1N3WlV9Hl3 09SLZ VNI10?JVO Hl'dON'W31SAS 'Od NV-ld IVSOdSla dRO 30V=lNnS I e0r 'iAV 6ZL XOe ELSLZ VNIlONVO H111ON 'ATIVO 7 7 7�T A7O �I��TA7 aNV 1N3W1V3Nl aNVA3NIA S.VHINVW VZ 101 HQP £OL 31V1S'3Ntl1 31NIOd 3Otl0SVO LUS 011 'O21tlA3NIA S.tlH121tlW �.19 Q CD o n 2- . r U U — (n I \ U O M Q (if Lo CD o I w 0 I 33ZZ � } I I Ly I 1 I �ttoo O dJ z I II m S �® I 00 i w z o o N N � N — I q lw O z z 4lw 9 Ix191, _ m 1 W 0 z zll o J J m o re - / 0 0-- r. vz�i a m rc w w- rc o in rc cJi c+ w 4 m N rc i i z fi LU LU IIIHII 1 1-1 17 Rl—finAn'al'ca_111-11A 1111 11A cl1110-1u_nn�,nronn/c�nT (1v1n1��1�-i�afnl�l aniin_1/-� ON •UMOO WVHIVHO £ZILZI80 SO4-O :31V0 OLS9-6L£lfi Lfi) XVd fi£ZL'L94(fi Lfi) l31 1N3W1tl3N13Hd II'Sl H111A NDN'3ll1ASINNDW aovossa3 0..— VNIIONVO H1 •d `SaTLi�OSSF% ?�' dvIN W315AS dRl❑ 3OVdNf1S fiZL XD8 'O'd ' eOr ELSLZ VNIIONVD HIIION'ATJVD r7 �7!7 �T A7O �1 TA7 V3Nb 00S 0NVA3NIA S,VHINVW VZ 1O1 H0r'JAV £OL 31IO5'3NVl 31NIOd 3OVOSVO LDS 0'11'ONVA3NIA SMHl"W :xe ._ i i ir♦� i -, can, - Rr— fi nn --ca - - y., — - n in Fa — - n,, —A,,, ci it io-iu - -- ....c.nT ani in_ , 9WO ON A1NL10o WVHIVHD 1N3Wltl3ill321d II'Sl HAM09SLZ EZILZI80 :31Vf0 OLS9-6L£(6L6):XVd 6£ZVL94)6L6):131 VNIIONVO H121DN'3111ASIHNOW �.J T L.SaTL'!Z)OSS V N -O •d DD•4DS80O A3>4 1IV134 W31$A$ W31SAS dRlO 3Otld21fiS e0r 6ZL XOaHVD £LSLZ '3NVI 11NIOd ON 7 7 7�T A7O �I��TA7 Haf 'dAV 1N3Wlt/3211 O21tlA3NIA S�tlH121VW tlZ 101 OSVO £OL 311f1S'3NV1 31NIOd 3OVOSVO LOS 0ll'aUVA3 NIA S.VH1NVW :As lK z:a� gNlz uw No w- 7 N Qom: 0 II • G 0 0 z � qq � u �---ter- MEN I I T—i L.— LEE 0 o QI LL LUI o I I Lm_E' NONE I SEE NONE NONE MINE o r MEN Nn I Jrl IIN W �j o I } w II wo 0 LL o Y 1 J MEMO INSMEMO MEMO ! a - �_ a W I as ❑ m? C CN cn I I Z al �I W �N a I �z LU c U I _ I MEN _ ESP r N J � a� �o a H -nc 7 FnvFnnn—va- v7III -n A1111A vofn-Al -III'n A111A vo111-Al-1-1111-717.6iviI-11111fniA1 aniin- 7 ON Al NL1o0 WVH1tlH0 £ZILZISo LWO :31Vf0 OLS9-6L£(6L6):Xtld 6£ZL'L94)6L6):131 1 N3Wltl3ill321d II'Sl HAM09SLZ VN1101WO H121ON'3111ASIHNOW T Sl2lVHO 00'tosa0a 6ZL XOa '0'd T `SaTLiZ)OSSV N 3NI1 dRla aNb W31SAS dRlO 30tld21 f1S e0r ELSLZ VNI1OHVO H111ON'AdVO Q7 SN011tllllcnvo ONVA3NIA S,VH1NVW tlZ 101 Hdf'JAV £OL 31If1S'3Ntl1 31NIOd 30VOSVO LOS ONISOO 0ll'OLItlA3 NIA S.VH1NtlW o: �� z:Q �- 0 O -0, z w Z 0 U n 0 rOf CK N�N a U W Z J a N Z 0 N � U 2 — W Q J z a � ? Ul J J \ \ \ O � w U U U U r o a v ov v a F N a E w o 3 Q O K VJ 7 � Z aZ O w o W Z O U Uv I— Z O O Z o z w o w z �Z U N d Q o wo Zx a M U Q ¢o ��o= r m z Q O fly O m z w w U U Z j o N = U co _ o m m w o �� Q Q Z Q o Q U O W O N ? O J O N o I� ? O w U m w w, Q w H -nc 7 Rnvfinnn—va- nn—ol—Fiii nenoirnaii a-iin-v7 III-nin.(ai 11A vofn-A-n11 'n A111n vofnio ini-nn'�,ncon ��c�n T.6 iv ini ��l ��inafni�1 wniin-i�-z z o it1 O O O O 0 0 0 N Q N N N N N N N N M � g M N O N M V N o] W w Z G p a _ r z O O O O 0 0 = O� it1 0 J W W N N N N N N N N U � Z Lei K O U Q Q Q Q Q Q Q d Q ZZZZZZZZ Q = r o r Z H U' O <O z W 0 0 0 0 0 0 0 N 0 r r r r r r r r Q N N N N N N N N W g W W p ik N J Z O N M� N <O IN 0] W w Z Q p _ r �= w o� a0000aoo N N N N N N N N U � W Z 4 � a ZZZZZZZZ Q a O r Z H c� O a z W O O O O itl it] itl N it] Q N N N N N N N N W N g W N p � N Z O v J N M�� c0 IN o] W w Z Q p _ r 0 0 O W N ifl = � 0 Z i!1 W N N N N N N N N U J W ¢ z ZZZZZZZZ a a O r Z O o N z� ff¢>¢ N z w w z z Q \ w N z z Q 0 w W � lwi w o m 0 b d of a'i'Nao� m Q H w Q o � W � a o K � w b z Z � w o owoOZLL}mow w a3Qwmo:�zo �¢� o�o�aw N U W U Z Z Z a�m�000000No N N a N N I I I z z N N O Iw���oow Y � U1 Z � VI Z U1 ) UI � U1 U1 U U \ \\\ V1 U1 U1 U1 U U V1 N U1 U1 0 U Ul U 2 U O O O O m Q Z O } a p - O J Q w \ Q a z N O \ ❑ U 3 0 w�¢cc — oo z w m a a w o U N w w (n W \amwom aww�oa O� m ~ ti Z O T K O O E w O z O U O o � N m w w N N 3 w z o o m z�� a a a 0WUNf100 WVHIVHO £ZILZI80 804'0 31V0 OLS9-6L£(6L6):XVd 6£ZVL94(6L6):131 1N3W1V3N13Nd II'Sl H11M 095LZ VNI10?JVO H1NON'3111ASIHNO 3�IdW31SAS dRl❑ 3OVdNf1S 0Nd 0D4DS80' 6ZL XO8 'O'd W .d `Sa�Li�OSSv N ' eor ELSLZ VNIIOHVO HIIION'ATIVO Illla �TA7OD w i0l 3NI AIddns 0NVA3NIA S.VHINVW VZ 101 Hdf'AAV £OL 311n5'3NVI 31NIOd 30VOSVO LOS 1 1 11�11 �L 1 `��Y �L 011'0NVA3NIA S.VH121VW axe �gz as 10 � �a 0 zo a; \a ID \ ne G� 0 0 N O U) N N N N N ElevaUOn w J LL O w a cn w z J J a a N LOL-a ON AIM00 WVHIVHO EZOZILZ/80 :3jya DLS?fi LE (6 L6) :Xb•3 6EZ 4-L94 (6 Lfi) :131 1N3W1tl3211321d II-Sl HIMOSSLZ 00't05900 VNll0MV0 HiNON'91�IA91NNOW •'l T s;) jL'!JOssv :y W31SAS dRlO 30tld21f1S szL XO9 'o'd Q (.L da (. ear ELSLZ VNIIONVO H1NON'ANVO rT'T'T ATATO'l'J'�TAT 11 11��7111��1LLL��LL 1Y� ��LL S-lIbj3a MMUNIAS.VHIMVW VZ 101 HOf'JAV cuL 31V1S'3Ntll31NIOd 30VOSVO LDS �L11 3ll'ONVA3NIA S.VHIHVW N w H O Z "o OF m mam za Jw�x� -o zo ;4 o3W m3 z zg= k - 7j��;'•, m a� �o0 two way 0�4 _ o; o ��� ";��� ��� w3 '035 °'sa3w�k�N at O va�� w3 rc mz r� two wir zrc 3 - o a� wmJ �' u ,�•_ 1� 2;4� wow 3mrcowu.— Na,j mF ao� .N a o o a a a <w Wsmo ax = Wc, 6: g_ LL �a oo-Nw�=NwM<` _Q wo <NroW� w s zrc� a'^ m oao Sao _ NW xIJ -Z 3o o �w m J1 f 2= .,y•... w.�: oao wzzm >o zo'rc aoag�mm « N m � m s -Z w m xc �m O .... FQ,� m0, o Kmo-aLOU�U >> Ewa _p�w ZO OiK W� w <~ �p oN_ 30ow 11 lill �pwz �Z - w�6 �xw IzU aKw� YY¢ goo -Fz Y O4 r� m ¢K Zro Ow�m< U�12�p w<ow2 2� �� mQ o 3z wd' Z xJmx3 �Kw U 2 w� O a F�m a wa„= ....i.SN <� Ci wr¢ w\ ON �z Da O_O r xOt~Jlw wVuarO mw ¢ �'a cpior w Km^ O 6 -w o 3j w?� 35�u u mpg zp xoiazYZQm oLu mo&oz oaUi _ so u F� �pN o w�Nz u xir-o I mo x� p - smu Jo A<wa �uxl¢ Jcois �G�a� z�a aUua o,o pa aomo a ao83wa�w a - m_ m -- z _9A o2 o J I2 z, � �wo a\I6 NQ�,99 � II � II �II — — — — — — — — — II II I ill I I I I � I w 2 - wLL �mx o I� I aoz aza I woo - I z� noLLz zx� a� goo :wau ems„ W oE ow �03o J3 w noo I I I z 1-2 a lo o «� met. �& mw do f 20 w0 Iw ao Y Z a o a oz N z N3o SO pm l 0 0 o2 A� od< �o� wiz 5 .N... I a KZ �oz o �w m s m z .� w Zb W 3 N6N N b Y Z .zs a fU H a W F in z ao M d NI41I .9 hr wdZ l:b £ZoZ' LZ o"ny b mp'gmj.4 - oo't05800\s5ul-J0\-IIS-u0- W lol - pJUADUTA s,e4UPW - 011 'PJeAUTA s,UgIJvA - 0o'to5800\£ZOZ\A�e�q!l\(slaalmd) anu4-1\:2 ZO L'0 ON A1Nl10O WVHIVHO EZOZILZ/80 1N3W1VM11321d II-Sl HIM GlV4 OLS916LE(6L6):XV3 6£ZVL9V(6LG):131 09SIZ VNIIONVO HiNON'3111A91NNOW 'o'd •'l T sZ)Tt'!Ooss -T :y Q V 00.405800 LL =10Z W31SAS dR10 3OVd21f1S sop szL X09 ELSLZ VNIIONVO HIIHON'ANVO rT'T'T AT ATO'l'J'�TAT 1 11�7lll��lLlL��LL �L11 1Y ��LL HOf'JAV S-lIV130 MMUNIAS.VH121VW VZ 101 EOL 31V1S'3NVI31NIOd 30VOSVO LDS 0ll'ONVA3NIA S.VHIHVW tq• vJ �.p aw as %G _ oz' woof m a tpi3 / v ;p aa,k,0 p w� N7 p a p p /\U'\� • Ori m�ja 0 7 mp r- -X - n 12 21�w rU / IN wr , 3 es 2(- x z3� wo &w ,I I I I i 04 o umi- z. ul Nm \ x �o 0 0 ' Gawp \ p� n aqa alp wl� I� u7� a-, J Jan w3 \ M \�� ww 41w �LL •. am L O> 3� Q p0 Cm n w \ o N \� _ p mew zo \ \ \ \ Z UJ \ O KQ ao S `/ / o m U 'zW _zY rg o o Z I I m a I z O „OS Z z J A,- au N9 .sZ� o H J II „L9:F II U W , N o oQZ aZ U z N o W/ n Q m IL z O p I I � p oZ _ op u - ;z wo glz Kp _ 0-104 � I p K all a I Np �II �w m I w3 II boa JII �m I R 11 o�p I rcll I Owl III II I �II �ma I I II oo I mll rn ii I ��� oon I I NII ��a I MII III I i1 j; I I I II wdZ l :b £ZOZ ' LZ o"ny 6rmp'sl!ula4 - OO'b05800\s6ulnneLO\a115-u0 - b2 lol - pJuAaulA s,eyUuW - 011 'pJeRulA s,eylJuW - 00't05800\£ZOZ\�Lu�q!l\(slaafmd) anu4-1\:2 £06'0 ON AIM0O WVHIVHO EZOZILZ/80 1N3W1tl3211321d II-SI HIM :3jy4 DLS?fi LE (6L6) :Xb'3 6EZ 4-L94 (6Lfi) :131 OSSLZ VNIl0MV0 H1NON'3l1IA91NNOW •'l 'o'd T sZ)Tt'!Ooss -T :y Q V io 00't0590O W31SAS dR10 3Otld21f1S sop szl X09 rT'T'T Ll =10£ SLSLZ VNIIONVO HIIHON'ANVO AT ATO'l'J'�TAT 1 11��7111��1LLL��LL �D 1Y ��LL HOf'JAV S-lItlj30 MMUNIAS.VHIMVW VZ 101 EOL 31V1S'3NVI31NIOd 30VOSVO LDS 3ll'ONtlA3NIA S.VHIHVW u w p w J a � o o �ul kc.., zdo•G Qi 7o� c opa R � n v o� f S a N z— j 0o sera �<Fi- 0�5 z f ,z .o .NL � " 'o d5 o�w �4u zww aa z a J a Y z a c� z 75 O 0 0 J W LL U W rn Y z a 0 z 75 O 0 0 J W LL n z wdZ l:t £ZOZ' 4Z o"ny 6rmp'gmj.4 - 00't058O3\s5ul-J0\-IIS-u0- W 1-1- pJUAawA s,e4UPW - 011 'PJtiAUTA s,UgIJvA - 00't0580O\£ZOZ\A�e�q!l\(slaafmd) anu4-1\:2 ■m a AIro ma»o mZILZIR , 2< !e_� _�d_!m« __ _,_, n� a� . ae .� .� %a t oossv : / e�S_��__ :£r �£� ,��/Oar svi3a MMUNIAS.VHIM m _101 m'JAV m _sar _a _yam AVAg ms _m mw7 x $ /' }ƒ ` �• . Z J _/ [ .: \ ` - ! w ` LU � ` § \/ R »\i , w w # 7§ « �72 2 2 w y �� £ 2 0 2 \ « )LU :� : ul o \ W \- d � ��� ' ` � � |� > § ( - . » 7 u ! 9 %\ \ \Q -6.�� )I -� WIN - � 0 §°§{/# w w - > > � in `! 2 > )t ) ) ) m 2 � � R J w D }LLw \� L §§ §) - \ _ y y / / / �o. , : )zz w a. - o g /@!; /; � 2 _ « ` S m - ' w cjLL 2 \ \ 0 R \f m - - § � - R _ En \ \z \ ........... \ : maw e mbmp' «<-oo't _3\�5 _ _e«m- PJUADUIA s.PqIJPA-O « JvA _ w<w , SO L'0 ON AIM0O WVHIVHO EZOZILZ/80 1N3W1VM11321d II-Sl HIM GlV4 OLS916LE(6L6):XVd 6£ZVL94(6L6):131 09SIZ VNIIONVO HiNON'3111ASINNOW •'l T 'o'd Q sZ)Tt'!Ooss -T :y V 00'405900 W31SAS dR10 3OVd21f1S sop szL X09 rT'T'TATATOIJ�TAT LL=1OS ELSLZ VNIIONVOHIIHON'ANVO 1 11�7lll��lLlL��LL �L11 1Y ��LL HOf'JAV S-lIV130 MMUNIAS.VH121VW VZ 101 EOL 311L1S'3NVI31NIOd 30VOSVO LDS 3ll'ONVA3NIA S.VHIHVW77 N r � ko- 4k-h 3 0 w p� Z w `no LL O o w m � I a Q o l 001 w f Z N w0 p J Z �o N �'^ �� ® �o � o ' U) Nw ? 2O r Z Z 0 tJ O v O <oNz o� M o�oa aawm wo o o -1 Y- m II o ofJ Ali- D D 0 0 O D O O D u u u O D Oo <3 —= lo o j3a =) o O > a � f 7 L)) - u o a w ) wz O L - _ w o \ oZ C o p Cw w w a W o g-zz Uma H 4 D O O 4 0 0 D O D 0 0 0 0 4 W z _ M w F I I wz � � NIN O 0 wdZ l:t £ZOZ' LZ o"nV 6rmp'sl!elaQ - OO't058O3\s5uI-LO\-lIS-u0- W W-1- pJUADUTA s,eyuPW - 011 'PJtiAUTA s,eylJvW - 00't0580O\£ZOZ\ALe�q!l\(slaalmd) anu4-1\:2 mL-a ON «Neomaaa mzUS , a< ,_mi& _ m� ,&& m_�d_=m_ ___ _,m, X a' _aa.j.3 So DOSS i w�s_,�__ a£, : £r ,� /man sV1313 avA3 NIA s __VZ 101 m' m _sar_a��am oi-i'mmuNIA _ \ 6 � o- V, ' Z �° < c 1 $ may Lo = f Ez R R _ ow _ m . - 2 ,z � R w , . q a w 0 w w 2 LL « w C) R m « -j « m � 2 � o &L-Cl a AIro ma»o mZILZIR , !e_V3 _3lJd11-S!m« 2< ,_mGm «, «m,&m: _,_, n� a� . ae .� .� %a oossv : / __ e�S_°�� - / Oar �£z : sop S� m'JAV svi3a MMUNIAS.VHIM m _101 m _sar _a _yam AVA9 ms _m ^\.. ' o N ' z $ :: y - � z y o_ \may 0 :wZ ~ � \}/� Z ) § }/E - * / m / �ma§/ /\ 2 ! - § !4®i ! 12 ® - ; ) \ ; §§ j® \ , = e) !§� ` Q m\ -x u! _!| � \ \° �§a\; 24}| �Eul o 1. 14. / \ \) w _ _ ; ` I ,! w 2 {{ 0 N � 2 \\ / - - w - § E� , . ` z a z k( 7 7 maw e mbmp' «<-oo't _3\�5 _ _e«m- PJUADUIA s.PqIJPA-O « JvA _ w<w , _L-a a AIro ma»o mZILZIR , !e_� _�d_!m« 2< ,_mGm «, «m,&m: _,_, n� a� . ae .J .d %a L ooSsV : / __ �£, e�S_°�� - : £r S� / Oar JJJ�OD� W ^\ m� s�� M _�� m _� m _sar _a _yam mag_ q.VI41MVLAI �! ,- \\ \( k( oz2 : § !! }j m� maw e mbmp' «<-oo't _3\�5 _ _e«m- PJUADUIA s.PqIJPA-O « JvA _ w<w , 60L'0 ON AIM0O WVHIVH0 EZOZILZ/80 HIM 1N3W1AS :3iyQ OLS9-6LE(6L6):Xb'd 6£ZLY94(6L6):131 OSSLz HNIIONVOH1NON'3111ASINNOW •'l T �saT"�j'JOSC��-T 'X7 'o'd J Q V ld 00'405800 LL�O6 W31SAS dR10 3Otld21f1S dING ov=i lyl :# eor szL X09 ELSLZ VNIIONVOHIIHON'ANVO rT'T'TATATOIJ�TAT 1 11��7111��1LLL��LL �D 1Y� ��LL HOf'JAV S-lItl130 MMUNIAS.VHIMVW VZ 101 EOL 31V1S'3NVI31NIOd 30VOSVO LDS 3ll'ONtlA3NIA S.VHIHVW 'Ae 05 o i aJypuU' a N3az o (N• h -�� ciw waoz i�w� � N �• ��� •. z soNo >oF woww (n c� a5r? au�o3 lz aH ii� a a N A= N m 7-r � m Mtn ,, -- Q - - 3a d �M m m L c 77 a > o z' ii FL .�> o s o w ^ te a � o 15 � N C LAN � D N 49 and N aN m �E O 7 -_- O � D X if1 N > c� rr Z LL 9 - C LL O C_ W NM aa�>U O� oe ~ -_ Q Li a.a > oaLLNz a Q)9 Q a:E LT Faamv - w- Q - N 'a -� N Ci63ULLN -_ _ Q E7. Z z d N O N Y m m W U E m LL Z U oZo H p N o<o- / N� Oal U �I'. = M m EnimU �� UWnpr.. op9E, W F z Q U O m m JCa �' o Z N wd£ l:t £ZOZ' LZ o"ny 6rmp'gmj.4 - OO't05800\s5ul-J0\-IIS-u0- W 1-1- pJUAawA s,e4UPW - 011 'PJtiAUTA s,UgIJvA - 00't05800\£ZOZ\A�e�q!l\(slaafmd) anu4-1\:7 066�0 ON AIM00 WVHIVH0 EZOZILZ/80 1N3W1tl3211321d II-Sl HIMO99LZ :3iyQ OLS916 LE(6L6):Xb'd 6£ZLY94(6L6):131 HNIIONVO H1NON'3111ASINNOW •'l T �sa�"�j'JOSC��-T 'lX7 'o'd Q V d 00'405900 LL�OOL W31SAS dR10 30tld21f1S llll 'A eor szL X09 ELSLZ VNIIONVOH1NON'ANVO rT'T'TATATOIJ�TAT HOf'JAV S-IItll30 MMUNIAS.VHIMVW VZ 101 EOL 31V1S'3Ntl131NIOd 30VOSVO LDS 1 11�7111��1LLL��LL �L11 1Y ��LL 011'021tlA3NIA S.VHIHVW 'Ae O..GQ�`; a - T d - M ai m x E E > z 0 .- p� N U U O 49 o o �• _ n J � o U o U 0. >� u o E z �a W ¢ ¢ a - _ m V --_ - _ U) o mLL '70 V a a LL o - ni CV - Q 7�6" .. i- g N N =- N oLL J - o a m a Q V- W z z NI/I H =' Q �flT �uc� l m 5ia. -- &m" - LL Ell N >q - O v� > v N mLU LL s T� - 3 /I '1 ^ ' 1' ' 1' w w ZC U Q CE€:a f�l to LL w a, = w z a��n �90 c wd£ l:t £ZOZ' LZ o"ny 6rmp'gmj.4 - OO't05800\s5ul-J0\-IIS-u0- W 1-1- pJUAawA s,e4UPW - 011 'PJtiAUTA s,UgIJvA - 00't05800\£ZOZ\A�e�q!l\(slaafmd) anu4-1\:7 666�0 ON AIM00 WVHIVHO EZOZILZ/80 1N3W1tl3211321d II-SI HIMO99LZ :3iyQ OLS916 LE(6W:Xb'd 6£ZLY94(6L6):131 HNIIONVO H1NON'3111ASINNOW •'l T �sa�"�j'JOSC��-T 'lX7 'o'd Q V d 00'405900 dd L• W31SAS dR10 30tld21f1S ly :# eor szL X09 ELSLZ VNIIONVO HIIHON'ANVO IIITHIII �TODOLIW HOf'JAV S-IItl130 MMUNIA S.VHIMVW VZ 101 EOL 31V1S'3NVI 31NIOd 30VOSVO LDS 11�l1 �Ll �L Ll 1 �L 3l1'ONtlA3NIA S.VHIHVW 'Ae N 773H., N ? •' a a-. m � c a p - U a a �I LL z U m z & co it it � F a O m ol - 0 m N o- 3 z N N N � o YWVJ '/A1 -am m -_ C Z Y mm m m d a ui 1 x p U > N � 0 O— s = o— 2 a - a p o- ♦ N � W U] _ _ - Ll U n c - £ L Cl) = - LLQ N N It - M LLI N W_= s = d J �= 0 W - - C 0o O - a w o w Z o 14 D i wd£ l:t £ZoZ' LZ o"ny 6rmp'gmj.4 - oo't058o0\s5ul-J0\-IIS-u0- W 1-1- pJUAawA s,e4UPW - 011 'PJtiAUTA s,UgIJvA - Oo'to5800\£ZOZ\A�e�q!l\(slaafmd) anu4-1\:7 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Specifications SEAL ' 17069 - MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Excavationand Backfilling........................................................................................................................ I Septic, Recirculation, and Field Dosing Tank Installation and Testing ................................................. 2 PipingInstallation and Testing..................................................................................................................4 E-Z Treat Dosing Pump............................................................................................................................ 4 Field Dosing Pump ................................ EZ Treat Combo Control Panel ........... E-Z Treat Treatment Unit Installation In 4 E EffluentBypass Valve................................................................................................................................. 5 DenitrificationAssembly............................................................................................................................ 5 HydraulicUnit Installation........................................................................................................................ 5 UltravioletDisinfection Unit...................................................................................................................... 5 Flow Meter Rain Sensor .................................. Drip Irrigation Line Installation Irrigation Site Cover Crop ......... Electrical ...................................... C 5i ....................................................................................................... 6 7 8 Project Specifications Excavation and Backfilling 1. Excavated materials acceptable as backfill shall be stockpiled in a location approved by the Owner. The materials shall be located away from the edge of any excavations. Excavated materials shall not be stored within the driplines of existing trees. 2. All open excavations shall be barricaded when construction in the area has stopped. Night barricading should include posted warning lights. 3. Protect existing structures, utilities, sidewalks, pavement, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. Protect root systems from damage or dry -out to the greatest extent possible. 4. Soil materials shall be free of boulders, roots, sod, organic matter, and frozen material. 5. Bedding materials for pre -cast concrete structure installation shall be #57 washed stone to the dimensions and depth shown on the construction drawings. 6. All excavation is unclassified and includes excavation to subgrade elevations indicated on the construction drawings regardless of character of materials and obstruction encountered. In the event that rock is encountered, the Contractor shall remove it at no additional cost to the owner. 7. Stability of excavations shall be maintained by sloping of the sides and shall comply with local codes, ordinances, and requirements of agencies having jurisdiction. Where space restrictions prevent sloping of the sides, shoring and bracing of the walls shall be employed in full compliance with OSHA requirements. In the case of pipe installations, sheeting shall remain in place until backfilling progresses to a stage where no damage to the pipe will result from removal. 8. The Contractor shall attempt to prevent surface and subsurface water from flowing into excavations. The Contractor shall provide equipment, materials, and work necessary to dewater any accumulation of water in the excavation to prevent softening of the soils, undercutting of footings, and changes to the soils detrimental to the stability of the improvements. 9. Excavations for structures shall conform to dimensions and elevations shown on the construction drawings within a tolerance of plus or minus 0.10 feet and to the standards of ASTM C891-90. 10. Backfill shall be installed to excavated spaces in 8-inch lifts and tamped by hand or pneumatically around pipe or structu Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 res. Tamping shall be performed evenly on both sides of pipe and around sides of structures to a depth such that damage to the pipe or structures is avoided as a result of subsequent methods of compaction. Extreme care shall be exercised in backfilling operations to avoid displacement of pipe and structures either horizontally or vertically. Backfill consolidation by ponding water is not permitted. Compaction of each layer of backfill and the top 6 inches of subgrade shall achieve a 90 percent maximum dry density as measured by AASHTO method T-99. 11. Remove all waste materials including unacceptable excavated material, trash, and debris and legally dispose of it off Owner's property. Where settling is measurable or observable at excavated areas during project warranty period, the Contractor shall remove surface finish, add backfill material, compact, and replace surface treatment to a quality and appearance matching adjacent areas of previous work. 12. Site specific excavation and backfilling requirement shall also comply as shown on the construction drawings. Septic, Recirculation, and Field Dosing Tank Installation and Testing 1. All tanks shall conform to criteria in 15A NCAC 18A .1952-.1954 and be installed on a 6-inch minimum layer of No. 57 washed stone aggregate. 2. Place bell ends of pre -cast sections or the groove end of the concrete facing down. In preparation for making joints, all surfaces of the portion of the section to be jointed and the factory -made jointing materials shall be clean and dry. Each joint, seam, and pipe penetration inside and outside of joints shall receive liberal applications of non -shrink grout as well as liberal amounts of bitumastic waterproof sealant. 3. Lifting holes and other penetrations of the pre -cast structure wall shall be sealed with nonshrinking grout. Pipe connections shall be made so that the pipe does not project beyond the inside wall of the structure. Grout connections as necessary to make smooth and uniform surfaces on the inside of the structure. 4. Before placing any tank into operation, remove any dropped grout, sand or other imperfections and obstructions from the interior of the structure. Specifically, the inside walls of the tank shall be smooth and uniform. Smooth -finish inverts so that wastewater flow is confined and directed through the inlet and outlet pipes with easy transition. 5. Tanks shall be backfilled in accordance with the applicable specifications herein before described. 6. All pipe penetrations shall be through Press -Seal Cast -A -Seal 402 rubber connectors or approved equal. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 2 7. All joints (mid -seam, top -seam) shall be sealed using Concrete Sealants butyl sealant #CS-102 meeting ASTM C-990. 8. All service access openings will be a minimum of 24 inches. Exceptions may be made on a case -by -case basis with E-Z Treat's and engineer's prior written approval. All access openings shall be fitted with E-Z Set riser assemblies. 9. A 24-hour static water test, in accordance with ASTM standards, shall be performed on all precast tanks in order to insure they are watertight. a. The testing shall be performed in the presence of the engineer or his representative. b. Each tank shall be filled with water and the initial water level shall be measured. c. At the end of the 24-hour period, the level of the water shall be measured again. d. The engineer shall pass the tank if the water level did not drop more than 0.5 inches or if the total volume of the displaced water is less than 1 percent of the total effective liquid capacity of the tank. e. Tanks may also be leak -tested by applying a vacuum of 5-inches of Hg with riser assemblies in place. f Each failed tank shall be tested again. In the event that the tank does not pass the second test, the Contractor shall remove and replace the tank at no additional cost to the owner. 10. Septic Tank and E-Z Treat Recirculation Tank shall meet the following additional criteria: a. Minimum liquid depth of 36 inches. b. Minimum airspace of 9 inches. c. Length shall be at least twice as long as the width. d. Septic tank shall be constructed with a baffle wall dividing the tank interior 2/3rd to 1/3rd The baffle wall shall be constructed to permit passage of effluent through a slot or holes located between 45 and 55 percent of the interior depth. 11. Septic tank shall be fitted with a Sim Tech STF-110, Polylok PL — 122, or Engineer approved effluent filter that extends down to 50 percent of the liquid depth of the tank. 12. Septic tank shall be as specified on the construction drawings. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 3 Piping Installation and Testing 1. Piping shall be PVC and of type and size as shown on the construction drawings. Piping shall be installed with a minimum of three (3) feet of cover unless shown otherwise on the construction drawings. 2. Piping shall be installed to be able to meet a pressure test whereby the pressure remains constant for a minimum of two hours, and the allowable leakage is not more than 10 gpd/inch of pipe diameter/mile. 3. Any line installed under a driveway shall be sleeved in Class 52 Ductile Iron Pipe or encased in concrete and extend a minimum of 5 feet on either side and unless shown otherwise on the construction drawings. 4. Force mains installed under streams and driveways shall be sleeved in Class 52 Ductile Iron Pipe. E-Z Treat Dosing Pump and Control Panel 1. The E-Z Treat dosing pumps shall be one (1) Sta-Rite Step 30 1/2 horsepower multi -stage submersible pump for operation on a single phase, 115 Volt service. Field Dosing Pump 1. The field dosing pump shall be as specified on the construction drawings or approved equal by Engineer. The motor shall meet the horsepower requirement for operation on a single-phase service. EZ Treat Combo Control Panel 1. The control panel shall be EZT-1CD4Z-230-16 provided by E-Z Treat. 2. The control panel shall be in a NEMA 4X enclosure, installed in accordance with the manufacturer's recommendations, and within 10 feet of the E-Z Treat treatment unit. 3. No splices may be placed in the pump tank or riser. All splices shall be made above ground in a NEMA 4x junction box. 4. Control and alarm circuits shall be on separate circuits. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 4 5. RMSYS telemetry control panel or equal shall be connected to a phone line. If the local health department does not have access to the RMSYS website, a direct interface must be provided. System operator must be able to access the panel directly on site and shall be available with a 24 hour notice to the county in the event a direct connection is necessary. 6. The audible/visual alarms shall be external to any structure. E-Z Treat Treatment Unit Installation 1. The E-Z Treat Treatment Units shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. Effluent Bypass Valve 1. The effluent bypass valve shall be by E-Z Treat and shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. Denitrification Assembly 1. Valves and piping back to the front of the septic tank shall be integral with the pod dosing system. Hydraulic Unit Installation 1. The E-Z Set Drip hydraulic unit shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. 2. Electric solenoid zone valves shall be 1" (Model SVLVB-100). 3. Vortex filter shall be 1 1/2" (Model ANE-1.5F-3). Ultraviolet Disinfection Unit 1. The ultraviolet unit shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. The unit shall be by E-Z Treat (Model E-Z UV 102) or approved equal by engineer. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 5 2. A visual alarm shall be provided that alerts the homeowner when the primary bulb fails. After primary bulb failure, the backup bulb shall be good for 10,000 hours. Alarm panel shall be mounted within 6 feet of ultraviolet casing. 2. Casing shall be filled with water prior to powering up lamps. Rain Sensor 1. A Hunter Mini-Clik rain sensor shall be installed adjacent to the hydraulic unit in an area that will receive precipitation (that is not covered by any trees). Flow Meter 1.Water measuring device shall be by badger meter (Model 55) or approved equal by engineer. Drip Irrigation Line Installation 1. The drip irrigation lines shall be installed as shown on the construction drawings. The lines shall be laid parallel to the existing contours and laid completely level. 2. Emitter spacing shall be 24-inches. There shall be 3-feet of spacing between adjacent drip lines. 3. Contractors shall ensure minimum disturbance of the soil in the wooded area. Weeds, trees and bushes less than 2 inches in diameter shall be removed, whereas vegetation that has diameter greater than 2 inches shall not be disturbed. 4. Harrow rake and backfill the soil if necessary. Native soil shall not be disturbed more than 1 inch into the soil profile. 5. Only rubber -tire, light -duty equipment shall be used in these areas. 6. No excavation for initial wastewater disposal field laterals shall occur while the project site is wet. 7. The retained trees shall maintain a minimum of three (3) feet in radius clearance area where no new soils shall be backfilled. Backfilled soils shall be gradually filled where the slope is one (1) vertically and three (3) horizontally. Drip lines shall not be placed within the three (3) feet clearance areas. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 6 8. Retain as many well established trees as possible. Remove pine trees and retain hardwoods preferentially where tree displacements are necessary. 9. Leaf and vegetation matter shall be raked from irrigation site. 10. Limitations of soil disturbance shall be clearly addressed to responsible personnel. Any necessary disturbance that exceeds the soil disturbance limits shall be approved by engineer. 11. If applicable after completion of filling, backfilling, and/or grading, topsoil shall be spread uniformly to a depth of not less than thirteen (13) inches over the seasonal high ground water level. Topsoil shall be compacted lightly in an approved manner. The finished surface shall be in conformity with the lines, grades, and cross -sections shown on the Contract Drawings, as well as free from dips, bumps, and irregularities in alignment. 12. If applicable all fill and backfill shall be free from roots, wood scrap material, and other vegetable matter and refuse. Fill and backfill shall be placed in layers not more than eight (8) inches thick, loose except as specified otherwise herein, and each layer shall be compacted thoroughly and evenly. 13. For pipe trenches, fill and backfill, unless otherwise noted, shall be compacted to at least 90 percent of the maximum density at optimum moisture content, as determined by ASTM D 2167 (Modified Proctor Method). 14. The Contractor shall perform all grading in areas so indicated. Fill shall be brought to finished grades indicated on the Contract Drawings and shall be graded so as to drain water away from structures. Areas directly and indirectly affected by the construction work shall be graded to provide proper drainage and surfaces suitable for the use of mowing machines. 15. Surplus material not required for completion of the construction work or unsuitable for filling, backfilling, and/or grading shall be disposed of at the Contractor's expense in an approved spoil area and in accordance with local ordinances. 16. Field specific installation shall be as shown on the drawings. 17. Drip lines shall be installed in a manner to minimize disturbance to the existing vegetation on the disposal field. Irrigation Site Cover Crop 1. The cover crop shall be grass (lawn) or trees (natural woods). 2. The cover crop shall be tolerant of the climate in the region. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 3. The crop shall be perennial or a mix of annuals that provide a living cover during the entire year. 4. The crop shall be properly maintained to allow access and easy maintenance of the drip field. 5. The cover shall provide full coverage of the drip field. Any bare or dying lawn areas shall be replanted. 6. The drip field shall not receive irrigation in addition to the effluent dose. Electrical 1. All electrical work shall be in accordance with the National Electric Code and all applicable local requirements. 2. No splices may be placed in the pump tank or riser. All splices shall be made above ground in a NEMA 4x junction box. 3. Control and alarm circuits shall be on separate circuits. 4. The audible/visual alarms shall be external to any structure. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 8 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Engineering Calculations 17069 I ���'.p'P�' G I NE e' ��• / MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 MacConneR & Associates, P.C. Project: Surface Drip System with TS-II Pretreatment Project Number: C08504.00 Location: Chatham County, North Carolina Subject: Tank and Treatment Sizing Calculations Date: August 21, 2023 Assumptions And Calculations: 1. Treatment flow is based on unadjusted flow. 2. Irrigation flow is based on reduced flow Number of Bedrooms: Average Daily Flow per Bedroom: Unadjusted Design Flow: Flow Reduction: Adjusted Flow: Note: Input Calculated 5.0 Rooms Given 120 GPD 15A NCAC 18A .1949 600.0 GPD 0 % 15A NCAC 18A .1949 600.0 GPD Sizing Calculations Per Innovative Approval Table 1 -Model 600 and Tank Volumes Minimum Septic Minimum Design Daily Tank Volum Recirculation/Pump Tank Flow(gnd) (gallons) Volume (gallons)** Nomher of Media Pnds < 480 1,000 1,250 1 Model 600 pod 4 Bedrooms 1,000 1,800 1 Model 600 pod 5 Bedrooms 1,250 2,000 1 Model 600 pod 6 Bedrooms 1,500 2,200 2 Model 600 pod 601 - 1,500 V=1.17Q+500 V=1.17Q+500 1 Model 600 pod per 600 gallons 1,501 - 3,000 V=0.75Q+1,125 V=0.75Q+1,125 1 Model 600 pod per 600 gallons **Recirculation/pump tank minimum size based on total internal tank volume. Recirculation/Pump Tank Volume = Recirculation Tank(Chamber) Volume +Pump Tank(Chamber) Volume SEPTIC TANK DESIGN: Minimum Septic Tank Volume Required: Septic Tank Volume Provided: Septic Tank storage and effective volume calculations: Septic Tank Total Void Volume =L * W * D: Tank length: Tank W idth: Tank Depth: Total Void Volume: Septic Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: Tank W idth: Lowest Invert: Effective Volume: 1,250.0 Gallons 1,250.0 Gallons 9.6 foot 4.9 foot 4.3 foot 1,520.9 Gallons 9.6 foot 4.9 foot 3.7 foot 1,286.9 Gallons Septic Tank Treatment Detention Time: 2.1 Days Effective Volume / ADF E-Z TREAT DESIGN: Pod Dimension - Length 7.3 Feet Given Pod Dimension - Width 4.0 Feet Given Pod Dimension - Height 3.3 Feet Given Pod Surface Area 28.9 ft2 L x W Rated Loading Rate per Pod 700.0 GPD Given E-Z Treat Pods Required: 0.9 ADF/Pod Loading Rate E-Z Treat Pods Used: 1 Pod E-Z Treat Dose per Pod: 34.0 Gallons Given E-Z Treat Volume per Dose 34.0 Dose per Pod x Number ofPods Re -Circulation Timer On: 2.5 Minutes Given Re -Circulation Timer Off: 12.0 Minutes Given E-Z Treat Re -Circulation Cycles per Day: 99.3 Cycles Time per Day / Time per Cycle Total E-Z Treat Flow per Day: 3376.6 Gallons E-Z Treat Volume/Dose x Cycles/Day E-Z Treat Re -Circulation Ratio: 5.6 E-Z Treat Flow per Day / ADF Denitrification Gallons Returned: 993.1 GPD Denitrification Return Setting: 4.0 GPM E-Z Treat Surface Area: 28.9 ft2 E-Z Treat Loading Rate: 20.8 GPD/ft2 ADF/Surface Area E-Z Treat Recirculation Pump Selection Shall Be As Shown On Drawings. Minimum Pump/Re-Circulation Tank Volume Required: 1,000.0 Gallons Recirculation Tank Volume Provided: 1,000.0 Gallons Field Dosing Tank Provided: 4,500.0 Gallons Pump/Re-Circulation Tank Volume Provided: 5,500.0 Gallons Recirculation Tank storage and effective volume calculations: Recirculation Tank Total Void Volume = L * W * D: Tank length: 7.3 foot Tank Width: 4.5 foot Tank Depth: 4.2 foot Total Void Volume: 1,013.2 Gallons Recirculation Tank Effective Volume = L *W * Lowest Invert To Tank Bottom: Tank length: 7.3 foot Tank Width: 4.5 foot Lowest Invert To Tank Bottom: 3.4 foot Effective Volume: 830.8 Gallons Recirculation Tank Effective Volume to Pump Off= L * W * Lowest Invert To Pump -Off Elevation: Tank length: 7.3 foot Tank Width: 4.5 foot Lowest Invert To Pump -Off: 1.9 foot Effective Volume: 466.1 Gallons Recirculation tank is an all -time -filled storage/pump tank Field Dosing Tank storage and effective volume calculations: Field Dosing Tank Total Void Volume- L * W * D: Tank length: 12.7 foot Tank Width: 5.5 foot Tank Depth: 8.5 foot Total Void Volume: 4,429.4 Gallons Field Dosing Tank Effective Volume To Tank Bottom = L * W * Lowest Invert To Tank Bottom: Tank length: 12.7 foot Tank Width: 5.5 foot Lowest Invert To Tank Bottom: 7.8 foot Effective Volume: 4,082.0 Gallons Field Dosing Tank Effective Volume To Pump Off= L * W * Lowest Invert To Pump Off Tank length: Tank W idth: Lowest Invert To Pump Off: Effective Volume: Days of Field Dosing Storage (Effective Volume/ADF): Total System Effective Storage = Annual Loading from Soil Scientist: Maximum Instantaneous Loading Rate from Soil Scientist: Total Field Area Required: Total Field Area Provided: (Wetted Area) Annual Loading Rate Provided: (ADF x 365 Days per Year x 43,560 / 27,154 / Area Provided) Total Irrigation Flow: (Set by Design) Instantaneous Loading Rate Provided: (Total Irrigation Flow x 96.3) / Total Field Area Provided 12.7 foot 5.5 foot 6.3 foot 3,300.3 Gallons 5.5 Days >5days per 15A NCAC 02T .0605(m) 5,053.3 Gallons 18.67 Inches/Year 0.2 Inches/Event (Hour) 18,814 Square Feet 19,155 Square Feet 18.34 Inches/Year 9.40 GPM Dose Flow per Geoflow Calculations 0.05 Inches/Hour MacConnell & Associates, P.C. Project: Surface Drip System with TS-II Pretreatment Project Number: C08504.00 Location: Chatham County, North Carolina Subject: E-Z Treat Treatment Calculations Date: June 21, 2023 Assumptions And Calculations: Notes: Input Calculated Influent Characteristics: BOD (5-Day): 300 mg/l From EPA Design Manual TSS: 300 mg/l From EPA Design Manual NH3: 25 mg/l N-Organic: 34 mg/l TKN: 59 mg/l N-Organic + NH3 NO3 + NO2: 1 mg/l TN: 60 mg/l TKN + NO3 + NO2 Total Coliforms: 75,000,000 Number From NSF 350 Approval Effluent Limits: Biochemical Oxygen Demand (BOD5): QO mg/L Proposed Effluent Limit per 15A NCAC 02T .0605 Total Suspended Solids (TSS): QO mg/L Proposed Effluent Limit per 15A NCAC 02T .0605 Ammonia Nitrogen - NH4-N <15 mg/L Proposed Effluent Limit per 15A NCAC 02T .0605 Total Nitrogen (TN) <20 mg/L Proposed Effluent Limit per 15ANCAC 02T .0605 Fecal Coliform: <200 /100 ml Proposed Effluent Limit Geometric Mean per 15A NCAC 02T .0605 Septic Tank: Design: BOD Removal: 60.0 Percent Given TSS Removal: 70.0 Percent Given NH3 Removal: 0.0 Percent Given N-Organic Removal: 35.0 Percent N-Organic Converted to NH3: 50.0 Percent NO3 + NO2 Denitrified: 90.0 Percent Total Coliforms Removal: 50.0 Percent Septic Tank Effluent Concentrations: BOD (5-Day): 120.0 mg/l Concentration - Percent Removed TSS: 90.0 mg/l Concentration - Percent Removed NH3: 42.0 mg/l Concentration - Percent Removed + N-Organic Converted to NH3 N-Organic: 17.0 mg/l Concentration - Percent Removed - N-Organic Converted to NH3 TKN: 59.0 mg/l N-Organic + NH3 NO3 + NO2: 1.0 mg/l NO3 + NO2 Effluent+ Return from Recirc Tank - Denitrified TN: 60.0 mg/l TKN + NO3 + NO2 E. Coliforms: 37,500,000.0 /100 ml Concentration - Percent Removed Media Filters (E-Z Treat Pod): BOD Removal: 95.0 Percent Given TSS Removal: 95.0 Percent Given NH3 Removal (to Air): 2.0 Percent Given NH3 Nitrified to NO3 + NO2 : 95.0 Percent Given N-Organic Converted to NH3: 95.0 Percent NO3 + NO2 to Septic for Denitrification: 90.0 Percent E. Coliforms Removal: 50.0 Percent E-Z Treat/Re-Circ. Tank Effluent Concentrations: BOD (5-Day): 6.00 mg/l Concentration - Percent Removed TSS: 4.50 mg/l Concentration - Percent Removed NF13: 2.87 mg/l Concentration - Percent Removed + (S.T. Cone. + (N-Organic to NF13) Nitrified) N-Organic: 0.85 mg/l Concentration -N-Organic Converted to NF13 TKN: 3.72 mg/l N-Organic + NF13 NO3 + NO2: 2.05 mg/l NO3 + NO2 S.T. Effluent + Nitrified NF13 - Return to Septic Tank TN: 5.76 mg/l TKN + NO3 + NO2 Total Coliforms: 18,750,000.0 /100 ml Concentration - Percent Removed Ultraviolet Disinfection: Desien UV Dosing Rate: Number of Units: BOD Removal: TSS Removal: NF13 Removal: N-Organic Removal: NO3 + NO2 Removal: Total Coliforms Removal: 10.0 gpm 1 Units 0.00 Percent 0.00 Percent 0.00 Percent 0.00 Percent 0.00 Percent 99.999000000 Percent Ultraviolet Disinfection Effluent Concentrations: BOD (5-Day): CBOD: TSS: NF13: N-Organic: TKN: NO3 + NO2: TN: Total Coliforms: Fecal Coliforms: Flow Rate Pump Flow/Dosing Rate Given Given Given Given 6.00 mg/l Concentration - Percent Removed <6.00 mg/l CBOD <BOD5 as CBOD only measures oxidation of carbons. 4.50 mg/l Concentration - Percent Removed 2.87 mg/l Concentration - Percent Removed + (S.T. Cone. + (N-Organic to NF13) Nitrified) 0.85 mg/l Concentration -N-Organic Converted to NF13 3.72 mg/l N-Organic + NF13 2.05 mg/l NO3 + NO2 S.T. Effluent+ Nitrified NF13 - Return to Septic Tank 5.76 mg/l TKN + NO3 + NO2 187.50 /100 ml Concentration - Percent Removed < 187.50 /100 ml Fecal Coliforms < Total Coliforms < 200 colonies/100m1= Okay Septic Tank (11250 ST 323) Basic Dimensions Lid Thickness L 0.33 feet Lid Hole Diameter 1-11 24.00 inches Lid Hole Diameter (1-12) - If tank has only one hole, leave blank. 24.00 (inches) Lid Hole Diameter (1-13) - If tank has only one hole, leave blank. (inches) Length of Tank A 10.38 feet Width of Tank (B) 5.38 (feet) Height of Tank Excluding Lid (C) - This value includes the 4.67 (feet) base thickness but excludes the lid thickness. Depth of Bury (Y) - This measurement extends from the 1.50 (feet) ground level to the top of the lid. Wall Thickness 0.25 feet Base Thickness (E) 0.33 (feet) Distance to Groundwater GW 0.00 feet Customizations To Add Ballast Add Concrete Inside the Tank: Initial Inside Height of Tank - This measurement is the value 4.33 (feet) ofC -E. Add concrete inside the tank to make thicker base? 0.00 (feet) If yes, how much? (U) If no, enter a value of 0. Please note: The value entered must be less than the inside height of the tank. Increase Thickness of the Base: Initial Base Thickness - This measurement is the value of E. 0.33 (feet) Add concrete below the base of the tank to make thicker base? 0.00 (feet) If yes, how much? F If no, enter a value of 0. Create Lip: Extend the base horizontally to create a lip? - The lip will be the thickness of E plus F, below, and it will extend this 0.00 (feet) horizontal distance, P, from all four tank walls. If yes, how much? P If no enter a value of 0. Summary of Final Measurements after Ballast Customizations Final Base Thickness - This measurement is the sum of E 0.33 (feet) and F. Lip Thickness - This measurement is the sum of E and F. 0.33 (feet) Total Height of the Tank from the Top of the Lid to the Bottom of the Base - This measurement is the sum of L, C, and F. 5.00 (feet) This is equivalent to the sum of L, C - E, E, and F. Final Inside Height of Tank - This measurement is the value 4.33 (feet) ofC -E -U. Final Volume of Tank 208.61 (cf) Final Volume of Tank 1560.51(gallons Unit Weights Unit Weight of Water 62.40(lb/co Unit Weight of Dry Soil 110.00 (lb/co Unit Weight of Submerged Soil 47.60 (lb/co Unit Weight of Saturated Soil 120.00 (lb/co Unit Weight of Concrete 145.00 Ib/c Changes in Total Concrete Weight Due to Customizations Weight of extra concrete inside tank used to create thicker 0 (lb) base (Weight of extra concrete due to U Weight of extra concrete on bottom of tank used to create 0 (lb) thicker base (Weight of extra concrete due to F Weight of extra concrete due to lip (Weight of extra concrete 0 (lb) due to P) Weight of concrete removed due to lid hole 301(lb) Soil and Concrete Weights Weight of Soil on Lid 3533(lb) Weight of Soil on Lip 0 (lb) Weight of Lid Alone 2368(lb) Weight of Empty Tank - This value is the sum of weights of the body of the tank, the tank lid, the lip (P, if applicable), the thickened base (F, if applicable), and the extra concrete inside 9854 (lb) tank (U, if applicable), minus the weight of the concrete removed due to the hole in the lid. Water in Tank Water Level in Tank - Please note: The value entered must 0.00 (feet) be less than the final inside height of the tank. Weight of Water in Tank 0 Ib Weight of System Components Total Weight of Soil on Tank 3533 Ib Total Weight of Concrete 9854 (Ib) Total Weight Tank, Water in Tank, and Soil 13387(lb) Sliding Resistance Specific Gravity of Soil, SG 2.75 Friction Factor (Found in Table 1), f 0.30 Void Ratio Found in Table 3), e 0.85 Ratio of Lateral to Vertical Earth Pressure (Found in Table 2), Ka 0.33 ISliding Resistance 15577 Ib Uplift Force Uplift Force 17387.28 (lb) Safety Factor 1.50 Uplift Force with Safety Factor 26080.91(lb) Additional Ballast Required NONE (Ib) Recirculating Tank (1,000 PT 237) Basic Dimensions Lid Thickness (L) 0.33 (feet Lid Hole Diameter (H1) 24.00 (inches) Lid Hole Diameter (1-12) - If tank has only one hole, leave 30.00 (inches) blank. Lid Hole Diameter (H3) - If tank has only one hole, leave 0.00 (inches) blank. Length of Tank (A) 7.79 (feet) Width of Tank B 4.96 feet Height of Tank Excluding Lid (C) - This value includes the 4.50 (feet) base thickness but excludes the lid thickness. Depth of Bury (Y) - This measurement extends from the 1.50 (feet) round level to the to of the lid. Wall Thickness (T) 0.25 (feet) Base Thickness E 0.33 feet Distance to Groundwater GW 0.00 feet Customizations To Add Ballast Add Concrete Inside the Tank: Initial Inside Height of Tank - This measurement is the value 4.17 (feet) ofC -E. Add concrete inside the tank to make thicker base? 0.00 (feet) If yes, how much? (U) If no, enter a value of 0. Please note: The value entered must be less than the inside height of the tank. Increase Thickness of the Base: Initial Base Thickness - This measurement is the value of E. 0.33 (feet) Add concrete below the base of the tank to make thicker base? 0.00 (feet) If yes, how much? (F) If no, enter a value of 0. Create Lip: Extend the base horizontally to create a lip? - The lip will be the thickness of E plus F, below, and it will extend this 0.00 (feet) horizontal distance, P, from all four tank walls. If yes, how much? P If no enter a value of 0. Summary of Final Measurements after Ballast Customizations Final Base Thickness - This measurement is the sum of E 0.33 (feet) and F. Lip Thickness - This measurement is the sum of E and F. 0.33 (feet) Total Height of the Tank from the Top of the Lid to the Bottom of the Base - This measurement is the sum of L, C, and F. 4.83 (feet) This is equivalent to the sum of L, C - E, E, and F. Final Inside Height of Tank - This measurement is the value 4.17 (feet) ofC -E -U. Final Volume of Tank 135.45 (cf) Final Volume of Tank 1013.26(gallons) Unit Weights Unit Weight of Water 62.40 (lb/cf) Unit Weight of Dry Soil 110.00 Ib/cf Unit Weight of Submerged Soil 47.60 (lb/cf) Unit Weight of Saturated Soil 120.00 Ib/cf Unit Weight of Concrete 150.00 Ib/c Changes in Total Concrete Weight Due to Customizations Weight of extra concrete inside tank used to create thicker 0 (lb) base (Weight of extra concrete due to U Weight of extra concrete on bottom of tank used to create 0 (lb) thicker base (Weight of extra concrete due to F) Weight of extra concrete due to lip (Weight of extra concrete 0 (lb) due to P) Weight of concrete removed due to lid hole 398(lb) Soil and Concrete Weights Weight of Soil on Lid 2184(lb) Weight of Soil on Lip 0 (lb) Weight of Lid Alone 1514(lb) Weight of Empty Tank - This value is the sum of weights of the body of the tank, the tank lid, the lip (P, if applicable), the thickened base (F, if applicable), and the extra concrete inside 7274 (lb) tank (U, if applicable), minus the weight of the concrete removed due to the hole in the lid. Water in Tank Water Level in Tank - Please note: The value entered must 0.00 (feet) be less than the final inside height of the tank. Weight of Water in Tank 0(lb) Weight of System Components Total Weight of Soil on Tank 2184 (Ib) Total Weight of Concrete 7274(lb) Total Weight Tank, Water in Tank, and Soil 9457(lb) Sliding Resistance Specific Gravity of Soil, SG 2.75 Friction Factor Found in Table 1), f 0.30 Void Ratio (Found in Table 3), e 0.85 Ratio of Lateral to Vertical Earth Pressure (Found in Table 2), 0.33 Ka Sliding Resistance 11971(lb) Uplift Force Uplift Force 11643.88 (lb) Safety Factor 1.50 Uplift Force with Safety Factor 17465.82(lb) Additional Ballast Required NONE (Ib) Field Dosing Tank (1-12O-506) Basic Dimensions Lid Thickness (L) 0.33 (feet) Lid Hole Diameter (1-11) 24.00 (inches) Lid Hole Diameter (1-12) - If tank has only one hole, leave 30.00 (inches) blank. Lid Hole Diameter (1-13) - If tank has only one hole, leave 0.00 (inches) blank. Length of Tank (A) 13.92 (feet) Width of Tank B 6.50 feet Height of Tank Excluding Lid (C) - This value includes the 9.08 (feet) base thickness but excludes the lid thickness. Depth of Bury (Y) - This measurement extends from the 1.50 (feet) round level to the to of the lid. Wall Thickness (T) 0.50 (feet) Base Thickness E 0.58 feet Distance to Groundwater GW 0.00 feet Customizations To Add Ballast Add Concrete Inside the Tank: Initial Inside Height of Tank - This measurement is the value 8.50 (feet) ofC -E. Add concrete inside the tank to make thicker base? 0.00 (feet) If yes, how much? (U) If no, enter a value of 0. Please note: The value entered must be less than the inside height of the tank. Increase Thickness of the Base: Initial Base Thickness - This measurement is the value of E. 0.58 (feet) Add concrete below the base of the tank to make thicker base? 0.00 (feet) If yes, how much? (F) If no, enter a value of 0. Create Lip: Extend the base horizontally to create a lip? - The lip will be the thickness of E plus F, below, and it will extend this 0.00 (feet) horizontal distance, P, from all four tank walls. If yes, how much? P If no enter a value of 0. Summary of Final Measurements after Ballast Customizations Final Base Thickness - This measurement is the sum of E and F. 0.58 (feet) Lip Thickness - This measurement is the sum of E and F. 0.58 feet Total Height of the Tank from the Top of the Lid to the Bottom of the Base - This measurement is the sum of L, C, and F. 9.41 (feet) This is equivalent to the sum of L, C - E, E, and F. Final Inside Height of Tank - This measurement is the value ofC -E -U. 8.50 (feet) Final Volume of Tank 603.85 (cf) Final Volume of Tank 4517.14(gallons) Unit Weights Unit Weight of Water 62.40 Ib/c Unit Weight of Dry Soil 110.00 (lb/cf) Unit Weight of Submerged Soil 47.60 (lb/cf) Unit Weight of Saturated Soil 120.00 (lb/cf) Unit Weight of Concrete 150.00 Ib/c Changes in Total Concrete Weight Due to Customizations Weight of extra concrete inside tank used to create thicker 0 (lb) base (Weight of extra concrete due to U Weight of extra concrete on bottom of tank used to create 0 (lb) thicker base (Weight of extra concrete due to F Weight of extra concrete due to lip (Weight of extra concrete 0 (lb) due to P Weight of concrete removed due to lid hole 398(lb) Soil and Concrete Weights Weight of Soil on Lid 6459 (lb) Weight of Soil on Lip 0(lb) Weight of Lid Alone 4079 (lb) Weight of Empty Tank - This value is the sum of weights of the body of the tank, the tank lid, the lip (P, if applicable), the thickened base (F, if applicable), and the extra concrete inside 36751 (lb) tank (U, if applicable), minus the weight of the concrete removed due to the hole in the lid. Water in Tank Water Level in Tank - Please note: The value entered must be less than the final inside height of the tank. 0.00 (feet) Weight of Water in Tank 0 Ib Weight of System Components Total Weight of Soil on Tank 6459 (Ib) Total Weight of Concrete 36751(lb) Total Weight Tank Water in Tank and Soil 43209(lb) Sliding Resistance Specific Gravity of Soil, SG 2.75 Friction Factor (Found in Table 1), f 0.30 Void Ratio (Found in Table 3), e 0.85 Ratio of Lateral to Vertical Earth Pressure (Found in Table 2), Ka 0.33 Sliding Resistance 1 56979(lb) Uplift Force Uplift Force 53134.50(lb) Safety Factor 1.50 Uplift Force with Safety Factor 79701.75(lb) (Additional Ballast Required I NONE I (Ib) Subject: E-Z Treat Pod Flotation UDlift Calculations Pod Length = 7.75 ft. Assume the folowing densities: Pod Width = 7.75 ft. Pod Height = 3.00 ft. 5/4 Trex Board = 60 # / Cu. Ft. Natural Soil Depth (for Flotation) = 0.50 ft. Water = 62.4 # / Cu. Ft. Fill Soil Depth (for Ballast) = 2.50 ft. Soil = 100 # / Cu. Ft. 5/4 Trex Board Length = 8.00 ft. 5/4 Trex Board Width = 0.46 ft. 5/4 Trex Board Thickness = 0.09 ft. Number of Boards = 4 Determine Upward Forces: Pod Area = 60.06 sq. ft. Pod Buried Volume = 30.03 Cu. ft. IlTotal Buoyant Force of Basin = 1,874 # 5/4 Trex Board Area = 14.67 sq. ft. 5/4 Trex Board Volume = 1.34 Cu. ft. IlTotal Buoyant Force of Trex Board = 84 # Soil Area Over 5/4 Trex Board = 14.67 sq. ft. Soil Volume Over 5/4 Trex Board = 7.33 Cu. ft. IlTotal Buoyant Force of Soil = 458 # Total Upward Forces = 2,415 # Determine Downward Forces: 5/4 Trex Board Area = 14.67 sq. ft. 5/4 Trex Board Volume = 1.34 Cu. ft. IlTotal Weight of Trex Board = 81 # Soil Area Over 5/4 Trex Board = 14.67 sq. ft. Soil Volume Over 5/4 Trex Board = 36.67 Cu. ft. IlTotal Weight of Soil = 3,667 # Total Downward Forces = 3,747 # Factor of safety = Total Downward = 1.55 Total Upward = 1.55>1.00=OK *Weight of pod, mattress, and piping are not counted in downward forces. FIELD FLOW Project Number: C08504.00 Contact: MacConnell & Associates, PC Prepared by: Annie Foxworth Date: 21-Aug-23 Worksheet 1- Field Flow Total field Total Quantity of effluent to be disposed per day 600 gallons/day Hydraulic loading rate 0.0319 gallons / sq.ft. / day Minimum Dispersal Field Area 18,814 square ft. Total Dispersal Field Area 19,155 square ft. Flow per zone Number of Zones 3 zone(s) Dispersal area per zone 6,385 square ft. Choose line spacing between WASTEFLOW lines 3 ft. Choose emitter spacing between WASTEFLOW emitters 2 ft. Total linear ft.per zone (minimum required) Total number of emitters per zone Select Wasteflow dripline (16mm) 2,128 ft. per zone 1,064 emitters per zone Wasteflow PC - 1/2gph dripline Pressure at the beginning of the dripfield 20 psi Feet of Head at the beginning of the dripfield 46.2 ft. What is the flow rate per emitter in gph? 0.53 gph Dose flow per zone 9.40 gpm Note: A few States or Counties require additional flow for flushing. Please check your local regulations. Flush velocity calculation below is for PC dripline. Classic dripline requires less flow to flush than PC. Please refer to Geoflow s spreadsheet "Design Flow and Flush Curves" at www.geoflow.com or call 800-821 If required, choose flush velocity 2 ft/sec How many lines of WASTEFLOW per zone? 8 lines Fill in the actual length of longest dripline lateral 270 ft. Flush flow required at the end of each dripline 1.48 gpm Total Flow required to achieve flushing velocity 11.84 gpm Total Flow per zone- worst case scenario 21.24 gpm Select Filters and zone valves Select Filter Type Vortex Screen Filter Recommended Filter (item no.) AP4E-1.5F in Screen Filter 0-20gp Select Zone Valve Type Electric Solenoid Recommended Zone Valve (item no.) SVLVB-100 1-in. Solenoid valve Number of doses per day / zone: 2 doses Timer ON. Pump run time per dose/zone: 10.38 mins:secs Timer OFF. Pump off time between doses 11:49 hrs:mins Per Zone - Pump run time per day/zone: 0:21 hrs:mins All Zones - Number of doses per day / all zones 6 doses / day Allow time for field to pressurize 0:00:30 hrs:mins:secs Filter flush timer 0:00:20 hrs:mins:secs Drain timer 0:05:00 hrs:mins:secs Field flush timer 0:01:00 hrs:mins:secs Field flush counter 42 cycles Time required to complete all functions per day 1:44 hrs:mins Dose volume per zone 100 gallons per dose Allow time in the day for controller to have pressurization and drainage time. c?11�oRaowj �MC33M[Q[�L�GC� ©G3ap PUMP SIZING Job Description: Surface Drip System with TS-II Pretreatment Contact: MacConnell & Associates, PC Prepared by: jAnnie Foxworth Date: 1812112023 Worksheet - Pump Sizing Section 1 - Summary from Worksheet 1 Flow required to dose field 9.40 gpm Flow required to flush field 11.84 gpm Flow required to dose & flush field 21.24 gpm Filter AP4E-1.5F No. of Zones 3 zones Zone valve SVLVB-100 Dripline Wasteflow PC - 1/2gph Dripline longest lateral 270.00 ft. Section 2 Ft of head Pressure A. Flush line - Losses through return line Select Pipe from dropdown menu PVC schedule 40 Select Flush Line Diameter 1-1/4" inch Length of return line 405 ft. Equivalent length of fittings 101.3 ft. Elevation change. (if downhill enter 0) 0 ft. Pressure loss in 100 ft of pipe 2.27 ft. 0.98 psi Total pressure loss from end of dripline to return tank 11.5 ft. 4.97 psi B. Dripline - Losses through Wasteflow dripline Length of longest dripline lateral 270 ft. Minimum dosing pressure required at end of dripline 23.10 ft. 10.00 psi Loss through dripline during flushing 8.45 ft. 3.66 psi Total minimum required dripline pressure 31.55 ft. 13.66 psi A+6. Minimum Pressure required at beginning of dripfield CALCULATED pressure required at beginning of dripfield T 43.03 ft. 18.63 psi SPECIFIED pressure at beginning of dripfield (from worksht 1) 1 46.2 ft. 1 20.00 psi Greatl SPECIFIED Pressure is greaterthan CALCULATED Pressure requirement. Go to next step C. Drip components - Losses through headworks Filter 28.4 ft. 12.30 psi Zone valve pressure loss (not in diagram) 4.62 ft. 2.00 psi Flow meter pressure loss (not in diagram) 7.00 ft. 3.03 psi Other pressure losses 5.00 ft. 2.16 psi Total loss through drip components 45.03 ft. 19.49 psi Geoflow, Inc. Pump Selection Worksheet, V.2003H 8/21/2023 D. Supply line - Minimum Pressure head required to get from pump tank to top of dripfield Select Pipe from dropdown menu PVC schedule 40 Select Supply line diameter 1-1/2" inch Length of supply line 150 ft. Equivalent length of fittings 37.5 ft. Height from pump to tank outlet 6.30 ft. Elevation change. (if downhill enter 0) 11 ft. Pressure loss/gain in 100 ft. of pipe 3.16 ft. 1.37 psi Total gain or loss from pump to field 23.2 ft. 10.05 psi Total dynamic head 114.5 ft. 49.55 psi Pump capacity * -Field Flush Flow 21.2 gpm 49.55 psi Field Dose Flow 9.4 gpm Filter Flush Flow - gpm - psi Pump Model Number Sta-Rite Step 20 Voltz / Hp / phase 115v AC, 0.5 HP, 1 Phase Note: Pump capacity flow assumes flow in dripline does not change during a dose cycle. With Wasteflow Classic this can be grossly over stated. For more accurate flows please see Geoflow's Flushing worksheet. If you need assistance designing for this additional flow, please a. See Geoflow flushing worksheet or b. Contact Geoflow at 800-828-3388. Geoflow, Inc. Pump Selection Worksheet, V.2003H 8/21/2023 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Equipment J MAGG,a° MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON -SITE WATER PROTECTION BRANCH INNOVATIVE WASTEWATER SYSTEM APPROVAL INNOVATIVE WASTEWATER SYSTEM NO: IWWS 2015-03-R2 Issued To: E-Z Treat Company PO Box 176 Haymarket, VA 20168 703-408-2911; Fax: 703-753-5043 Contact: Carl Perry, President Michael Stidham, Vice President For: E-Z Treat Model 600 Pretreatment Systems Approval Date: April 24, 2015 June 15, 2015 January 6, 2017 Tank Size and Sampling Revisions Addition of Single Bulb UV Unit In accordance with General Statute 130A-343, 15A NCAC 18A .1969 and.] 970, a proposal by E-Z Treat Company for an approval of subsurface wastewater systems utilizing the E-Z Treat Pretreatment systems has been reviewed, and found to meet the standards of an innovative system when all of the following conditions are met: I. General A. Scope of this Innovative Approval 1. Design, installation, use, and operation and maintenance guidelines for E-Z Treat Pretreatment systems to meet TS-I and TS-II effluent standards pursuant to Rule 15A NCAC 18A .1970. Refer to Rule .1970(a) Table VIII — Effluent Quality Standards for Advanced Pretreatment Systems for treatment performance levels. 2. Operation, maintenance and monitoring requirements for E-Z Treat Pretreatment systems and associated subsurface systems to ensure the treatment performance standards are met. B. This Innovative System Approval is applicable to domestic strength sewage systems (non -industrial wastewater) utilizing E-Z Treat Pretreatment Systems that have a design flow not exceeding 3,000 gallons per day (gpd). Use of E-Z Treat Pretreatment systems for facilities with an influent waste strength that exceeds domestic septic tank quality effluent standards pursuant to Rule 15A NCAC 18A .1970(b) may be proposed by E-Z Treat Company and a North Carolina Professional Engineer to the Department for review and approval on a case -by -case basis, prior to permitting by the local health department (LHD). The system design must include the proposed raw wastewater strength (BOD5, COD, TN, TSS, fats, oils and grease, etc.), the expected organic loading rate (in pounds TWWS-2015-03-R2 January 6, 2017 Page 2 of 10 of BOD), and hydraulic loading rate on the pretreatment system, and the calculations, references, and any other needed information to support the proposed design. C. Any site utilizing these systems shall have wastewater with sufficient alkalinity to facilitate biological treatment processes. The influent shall not have a pH or toxins that significantly inhibit microbial growth. D. Use of E-Z Treat Pretreatment systems that have a design flow exceeding 3,000 gallons per day may be permitted after approval by the Department on a case -by -case basis in accordance with the Large Systems State Review/Approval Process (Rule 15A NCAC 18A.1938). II. System Description The E-Z Treat Pretreatment system consists of the following components: a Department approved septic tank, a recirculation tank (or chamber); single or multiple E-Z Treat Pretreatment pods; and a final dosing tank (or chamber). Additional treatment may be used to ensure that treatment performance standards shall be met. The E-Z Treat Pretreatment system can utilize either a two tank configuration or a three tank configuration. The two tank configuration has the following components: the first tank is a septic tank and the second separate tank has a recirculation chamber and final dosing chamber. The three tank configuration consists of three separate tanks: a septic tank, a recirculation tank, and a final dosing tank. ITT. Siting Criteria The E-Z Treat Pretreatment systems and associated drainfields shall be sited and sized in accordance with Rule .1970 for TS-I and TS-II systems. Drip irrigation systems used with E-Z Treat Pretreatment systems shall be sited and sized in accordance with the manufacturer specific drip approval. The E-Z Treat Pretreatment systems and associated drainfields shall meet all applicable horizontal setback requirements and be located to prevent surface/subsurface water inflow/infiltration. TV. System Sizing The system sizing criteria shall be based upon the long term acceptance rate specified in the appropriate portion of the rules or the Innovative and Experimental system approval for the type of ground absorption system to be used. V. Special Site Evaluation A special site evaluation may be required based on the proposed ground absorption system. Refer to manufacturer specific drip approvals and Rule .1970(p). VI. Design Criteria A. The E-Z Treat Pretreatment system shall be designed in accordance with the following criteria. 1. All tanks, septic, recirculation, and dosing, must be approved by the Department and E-Z Treat Company specifically for use with the E-Z Treat Pretreatment system. 2. The E-Z Treat Pretreatment system can utilize either a two tank configuration or a three tank configuration. The two tank configuration has the following components: the first tank is a TWWS-2015-03-R2 January 6, 2017 Page 3 of 10 septic tank and the second separate tank has a recirculation chamber and final dosing chamber. The three tank configuration consists of three separate tanks: a septic tank, a recirculation tank, and a final dosing tank. 3. The E-Z Treat Pretreatment system consists of a septic tank, a recirculation tank/chamber, a final dosing tank/chamber, and E-Z Treat media pod(s) as specified in Table 1 below. Table 1 — Model 600 and Tank Volumes Design Daily Flow (gpd) Minimum Septic Tank Volume (gallons) Minimum Recirculation/Pump Tank Volume (gall ns)** Number of Media Pods < 480 1,000 1,250 1 Model 600 pod 4 Bedrooms 1,000 1,800 1 Model 600 pod 5 Bedrooms 1,250 2,000 1 Model 600 pod 6 Bedrooms 1,500 2,200 2 Model 600 pods 601— 1,500 V = 1.17Q* + 500 V = 1.17Q + 500 1 Model 600 pod per 600 gallons 1,501 — 3,000 V = 0.75Q + 1,125 V = 0.75Q + 1,125 1 Model 600 pod per 600 gallons *Q — design daily flow **Recirculation/pump tank minimum size based on total internal tank volume. 4. Septic tanks will have an inlet sanitary tee and a Department approved, appropriately sized effluent filter on the outlet end approved by the E-Z Treat Company for use with the E-Z Treat. 5. The minimum required volume in the recirculation chamber/tank prior to discharge to the dosing tank/chamber shall be the design daily flow. 6. The recirculation tank/chamber will contain the recirculating splitter valve or an external splitter box may be used. The recirculation tank/chamber shall have an inlet sanitary tee. The sanitary tee shall be visible and reachable from the riser opening to serve as the influent sampling point. 7. When the recirculation tank and dosing tank are combined, the baffle wall between chambers shall extend to the top of the tank and shall be constructed so that the liquid levels in either compartment are independent. Liquids will not by-pass between compartments except as designated by the system's treatment flow path. 8. The final dosing tank must meet the minimum size requirements of Rule .1952(c)(1). For drip irrigation systems, the requirements of the manufacturer specific drip approval for dosing tanks shall also be met. 9. A drainback configuration without a pump check valve is required for the force main supplying the media pod. 10. Recirculation pump shall be either Sta-Rite Model number STEP 20 or manufacturer approved equal. 11. The E-Z Treat media pod is constructed of a polymer suitable for use in contact with wastewater. The Model 600 pod is approximately 7 ft 4 inches x 4 ft with a surface area approximately of 30 square feet and is 42 inches in depth. The pod is fitted with a weatherproof cover properly secured. The pod is designed and constructed to create channels down the sidewalls to facilitate air flow. The sidewall channels provide airspace to the bottom of the pod. The bottom of the vessel is designed to provide total drainage of the treated effluent back to the recirculation tank/chamber. TWWS-2015-03-R2 January 6, 2017 Page 4 of 10 12. As the effluent enters the recirculation tank/chamber, this tank/chamber acts to further separate the septic tank effluent. The effluent entering the recirculation tank/chamber is charged by the recirculation pump to the media pod(s). The effluent is sprayed over the media mattress(es) using a spray manifold of evenly spaced wide-angle spray nozzles. The nozzles are manufactured with a free passage of 0.0625 inches in diameter. The system is set to recirculate effluent through the media pod on an average of 4 to 6 times prior to discharge. 13. The effluent is sprayed on mattress(es) measuring a total area of 30 square feet. The mattress(es) are fabricated from a non -biodegradable, chemically resistant, loose weave polypropylene material. The openings in the weave allows for effluent and air flow while containing the media. The media inside the mattress(es) are made of a styrene material. The specific gravity of this material meets the following criteria: light enough to prevent compaction which results in a loss of effective surface area, and provides a reduction in channeling across the media (short-circuiting). 14. Effluent passes through the media and enters a schedule 40 pipe located at the bottom of the pod. The effluent than gravity feeds back to the recirculation tank/chamber and the process is repeated. 15. The effluent bypass valve or splitter box is piped to intercept filtered wastewater and deliver it to the recirculation tank/chamber or the dosing tank/chamber, based on liquid volumes. 16. The Control Panel for the E-Z Treat System will consist of: recirculation pump on/off timer, discharge pump alarm, and high/low water alarm. Control panels shall meet the requirements of .1952 and shall be approved in writing by E-Z Treat Company for use in their systems. 17. Separate control and alarm circuits will be provided. The E-Z Treat systems will utilize a device for the recording of measurements of daily water flows. The device shall provide a means for determining at least the daily, 7-day, and 30-day flow monitoring requirements of Rule .1970. This information will be stored in the data logger for drip irrigation systems (provided by the manufacturer of the drip irrigation control panel). For pressure manifold and LPP systems, the Aquaworx control panel or manufacturer approved equal shall be used. The operator in responsible charge (ORC) of the system authorized in writing by E-Z Treat Company must be able to access the panel directly on site and shall be available to the LHD with 24-hour notice in the event a direct connection is necessary. 18. The UV disinfection system shall be rated for the appropriate discharge rate from the E-Z Treat pod. The UV disinfection system will be one of the following: a. E-Z Set UV-10005 (single bulb); b. E-Z Set UV-1000 (dual alternating bulbs); or c. Other UV systems specifically approved by the Department and E-Z Treat Company. 19. All access riser hatches shall be secured by approved tamper -resistant hardware approved by the manufacturer or by other means approved by the manufacturer as equal. Riser construction, attachment to tanks and security systems shall be pre -approved by the Department and E-Z Treat Company in accordance with the E-Z Treat specific approvals for the septic tanks and pump tanks, as applicable. 20. Buoyancy calculations shall be completed by a NC Professional Engineer if any parts of the tanks, pods, or other system components are installed in a seasonal high water table. Additional ballast may be required. 21. Influent samples shall be taken from the inlet sanitary tee into the recirculation tank. Effluent samples shall be taken from the final pump doing tank or a spigot or sampling port that is placed on the force main from the final dosing tank. B. E-Z Treat Pretreatment systems shall be designed by a designer authorized in writing by E-Z Treat Company or a NC Professional Engineer. Systems over 1,000 gallons per day shall be designed by a NC Professional Engineer. TWWS-2015-03-R2 January 6, 2017 Page 5 of 10 VII. Installation and Testing A. A preconstruction conference shall be required to be attended by the designer authorized in writing by E-Z Treat Company, engineer (if applicable), installer authorized in writing by E-Z Treat Company, and LHD prior to beginning construction of the E-Z Treat Pretreatment system. B. All E-Z Treat Pretreatment systems shall be installed according to directions provided by E-Z Treat Company. Additionally, all E-Z Treat Pretreatment systems and components used with, but not manufactured by E-Z Treat Company shall be installed in accordance with all applicable regulations and manufacturer instructions. C. All individuals/companies installing E-Z Treat Pretreatment systems shall be in possession of all necessary permits and licenses before attempting any portion of a new or repair installation. The company/individual must be a Level IV installer and authorized in writing by E-Z Treat Company. D. Watertightness of the tanks shall be tested by either of the following protocols: 24-hour hydrostatic test or a vacuum test. 1. Hydrostatic Test' a. Temporarily seal the inlet and outlet pipes. b. Fill tank with clean water to a point at least two inches above the pipe connections or the seam between the tank and the riser, whichever is highest. Measure the water level. d. Allow the tank to sit for 24 hours. e. Re -measure the water level. f. If the water level change is 1/2-inch or less or one percent of the liquid tank capacity, the tank passes the leak test. g. If the water level change is greater than 1/2-inch, any visible leaks can be repaired and the tank may be topped off with water and allowed to sit for a minimum of one hour. h. The tank passes the leak test if there are no visible leaks (flowing water or dripping in a steady stream) and no measureable drop in water level after one hour. Otherwise, the tank fails the leak test. Vacuum Testa a. Temporarily seal the inlet and outlet pipes. b. A vacuum of four (4) inches of mercury should be pulled on the tank and held for five (5) minutes. c. During the testing, the tank manufacturer or their representative can seal the tank if it is found to be leaking. d. If the tank is repaired, the vacuum must be brought back up to four inches and held for five minutes. E. The distribution of flow to the E-Z Treat Pretreatment system and to the septic tank shall be measured during start-up and set to be in accordance with the system design with start-up settings recorded. Victor D'Amato mud Ishwar Devkota, Development of Prefabricated Septic and Pump Tank Construction and Installation Standards for North Carolina. 2 National Precast Concrete Association, Best Practices Manual Precast Concrete On -Site Wastewater Tanks, Second Edition, October 2005, 24. ' National Precast Concrete Association, Best Practices Manual Precast Concrete On -Site Wastewater Tanks, Second Edition, October 2005, 24. TWWS-2015-03-R2 January 6, 2017 Page 6 of 10 F. Specified site preparation steps and construction specifications for the ground absorption system shall be strictly adhered to, including specified depth of trenches in relation to site limiting conditions, cover material specifications (if needed), trench installation method, etc. G. The installer authorized in writing by E-Z Treat Company, the engineer or designer authorized in writing by E-Z Treat Company, and the ORC authorized in writing by E-Z Treat Company shall conduct an inspection/start-up of the E-Z Treat Pretreatment system and all associated system components. The LHD personnel will attend and observe the inspection/start-up. During the inspection/start-up to include: 1. System watertightness testing. 2. Control panel operation and alarm settings. 3. Pump model numbers and time clock settings. 4. Pressure head on the E-Z Treat pod wastewater distribution system. 5. Return flow to the septic tank set per design and recorded, when applicable. 6. Riser hatches have tamperproof bolts, and/or riser lock ring. VITT. Operation, Maintenance, Monitoring, and Reporting A. E-Z Treat Pretreatment systems shall be classified, at a minimum, as a Type Va system in accordance with Table V(a) of Rule .1961(b). Management and inspection shall be in accordance with Rules .1961 and .1970. B. All E-Z Treat Pretreatment systems require an operation and maintenance agreement between the system owner and E-Z Treat Company, Inc., its authorized representative, or with an operator authorized in writing by E-Z Treat Company as per Rule .1970. The system shall be inspected according to Rule .1961 by a certified subsurface operator authorized in writing by E-Z Treat Company according. The ORC shall be either an employee of E-Z Treat Company or authorized in writing by E-Z Treat Company to operate and maintain the system. The operator authorized in writing by E-Z Treat Company must have proper equipment and training to access and program the control panels on site. C. All E-Z Treat Pretreatment systems shall be operated and maintained according to the latest version of E-Z Treat Company's O&M manual. D. At each E-Z Treat Pretreatment system inspection the ORC authorized in writing by E-Z Treat Company shall, at a minimum, observe, monitor, and record the following: 1. Wastewater level in all the tanks. 2. Sludge, scum, and grease levels in all the tanks. 3. Clogging of effluent filter. 4. Watertightness of tanks, risers, and pipe penetrations at the tanks. 5. Operation of pumps, floats, valves, electrical controls, and alarms. 6. Drainfield pump delivery rate (drawdown test), determination of the average pump run time, and drainfield dosing volume. 7. Any structural damage, accessibility issues, adequate ventilation, excess odors, ponding of effluent, insect infestations, vegetative growth over the drainfield, or surfacing of effluent on the drainfield area. 8. Sample of E-Z Treat Pretreatment system effluent collected from the sampling point to check for effluent clarity and odor and a sample of influent, as required. TWWS-2015-03-R2 January 6, 2017 Page 7 of 10 9. Readings from pump cycle counters and run time meters and any water meter readings, as applicable. 10. Current operational set up for TS-II nitrogen removal enhancement (percent returned to septic tank), and recommendation for modifications (if needed). 11. System operating conditions, from the review stored data for indication of 7-day and 30-day flows and flow variances or other abnormal conditions. E. The ORC authorized in writing by E-Z Treat Company shall also conduct other additional observations, measurements, monitoring, and maintenances activities as specified in the Operation Permit and as recommended by the manufacturer. F. Sampling and Testing 1. All sampling shall be done in accordance with Rule .1970(n)(3) and (5). E-Z Treat systems shall be sampled annually (semi-annually for systems with a design flow of 1,501 to 3,000 gpd)- 2. TS-II systems influent shall be analyzed for TKN. 3. Effluent for all systems shall be tested for effluent CBOD5 and NH4-N. Systems specified to meet the TS-11 standard shall also have the effluent analyzed for TN (TKN and NO3-N). Systems designed to meet the TS-1I standard with design flows of 1,501 gpd to 3,000 gpd shall have the effluent analyzed for fecal coliforms. 4. Additional sampling of effluent or influent may be determined to be necessary by the ORC authorized in writing by E-Z Treat Company during a system inspection to assist with troubleshooting or to verify system performance. 5. Effluent samples shall be taken from the final dosing tank/chamber or a sampling port located downstream from the final treatment process. 6. Influent samples shall be taken from a sampling port located between the septic tank and recirculation tank/chamber. 7. Adjustments in the monitoring schedule and number of parameters sampled may be proposed by E-Z Treat Company and approved by the Department pursuant to Rule .1970(n)(3)(B) or (C). G. Notification and Performance of Maintenance and Repairs 1. The ORC authorized in writing by E-Z Treat Company shall alert E-Z Treat Company, the LHD, and the system owner within 48 hours of needed maintenance or repair activities including but not limited to landscaping, tank sealing, tank pumping, pipe or control system repairs, media replacement, and/or adjustments to any other system component. 2. System troubleshooting and needed maintenance shall be provided to maintain the pump delivery rate and average pump run time within 25% of initial measurements conducted during system startup. The ORC authorized in writing by E-Z Treat Company shall notify the system owner, E-Z Treat Company, and the LHD whenever the pump delivery rate efficiency or average pump ran times are not within 25% of initial measurements conducted prior to system start-up. 3. The septic tank will be pumped as needed upon recommendation of the ORC authorized in writing by E-Z Treat Company and in accordance with the E-Z Treat Pretreatment system operation and maintenance instructions. However, at a minimum, the septic tank will be pumped whenever the solids level exceeds 25% of the tank's total liquid working capacity or the scum layer is more than four inches thick. 4. The tanks shall be pumped by a properly permitted septage management firm, and the septage handled in accordance with 15A NCAC 13B .0800. 5. The ORC authorized in writing by E-Z Treat Company shall notify the LHD, E-Z Treat TWWS-2015-03-R2 January 6, 2017 Page 8 of 10 Company, and the system owner in writing whenever repairs are indicated. All maintenance activities shall be recorded in the ORC reports provided to the system owner, LHD, and E-Z Treat Company. H. Reporting 1. The ORC authorized in writing by E-Z Treat Company shall provide a completed written report to the system owner, E-Z Treat Company, and the LHD within 30 days of each inspection. At a minimum this report shall specify: a. The date and time of inspection, b. System operating conditions according to Section VII.D, ViT.E, and VTT.F. c. Results from any laboratory analysis of any influent and effluent samples, d. Maintenance activities performed since the last inspection report, e. An assessment of overall system performance, 1. A list of any improvements or maintenance needed, g. A determination of whether the system is malfunctioning, and the specific nature of the malfunction, h. Any changes made in system settings, based on recommendations of the manufacturer, and i. A summary report of data retrieved from the control panel verifying actual daily, 7-day, and 30-day flows, flow variances, and other operating conditions. IX. Responsibilities and Permitting Procedures A. Prior to the installation of an E-Z Treat Pretreatment system at a site, the owner or owner's agent shall file an application at the LHD for the proposed use of this system. After the LHD conducts a soil and site evaluation, the LHD may issue an Improvement Permit or Authorization to Construct or amend a previously issued Authorization to Construct allowing for the use of a E-Z Treat Pretreatment system. B. The improvement Permit and Authorization to Construct shall contain all conditions the site approval is based upon, including the proposed used of the innovative system. The Operation Permit will include all conditions specified in the Improvement Permit and the Authorization to Construct. C. When a special site evaluation is required pursuant to Rule .1970(p)(1) or a drip approval, as applicable, an evaluation and written, sealed report from a Licensed Soil Scientist regarding the site shall be provided to the LHD. The report shall contain the information as specified in Rule .1970(p)(2) and "Requirements for Submittals of Soil Reports and Pretreatment and/or Dispersal System Designs". The LHD may request the assistance of their Regional Soil Scientist in evaluating this report prior to permit issuance. D. The E-Z Treat Pretreatment system shall be designed by one of the following: a designer authorized in writing by E-Z Treat Company or a North Carolina Professional Engineer. Systems over 1,000 gallons per day, or as otherwise required for drip irrigation systems, shall be designed by a North Carolina Professional Engineer. E. Prior to issuance of an Authorization to Construct for an E-Z Treat Pretreatment system, a design submittal prepared by a designer authorized in writing by E-Z Treat Company or a North Carolina Professional Engineer shall be submitted for review and approval by the LHD. The TWWS-2015-03-R2 January 6, 2017 Page 9 of 10 design submittal shall include the information required in "Requirements for Submittals of Soil Reports and Pretreatment and/or Dispersal System Designs". F. It is recommended that local authorized environmental health practitioners attend a design training session offered by the manufacturer/authorized representative prior to permitting the system. Also, at the request of the LHD, a Regional Engineer will review the design. G. The designer authorized in writing by E-Z Treat Company shall certify in writing that the E-Z Treat Pretreatment system was installed in accordance with the approved design prior to Operation Permit issuance. H. A North Carolina Professional Engineer shall certify in writing that a system designed by an engineer was installed in accordance with the approved plans and specifications prior to Operation Permit issuance. I. For sites required to be evaluated by a Licensed Soil Scientist or Professional Geologist (see Section V and TX.C), the health department may specify as a condition on the Improvement Permit and Authorization to Construct that a Licensed Soil Scientist or Professional Geologist oversee critical phases of the drainfield installation and certify in writing that the installation was in accordance with their specified site/installation requirements prior to the Operation Permit issuance. J. The ORC authorized in writing by E-Z Treat Company shall be present during the final inspection of the system prior to the issuance of the operation permit. The ORC shall be certified as a NC Subsurface Operator and authorized in writing by E-Z Treat Company. K. The LHD issues the Operation Permit after the following: 1. Field verification of installation completion; 2. Receipt of written documentation from the designer authorized in writing by E-Z Treat Company or the engineer, as applicable, that the system has been designed, installed, and is operating in accordance with the approved plans; and 3. All necessary legal documents have been completed, including the contract between the system owner and the ORC authorized in writing by E-Z Treat Company. K. On an annual basis, E-Z Treat Company shall provide a report to the On -Site Water Protection Branch including the number and location of new system installations during the previous year, and effluent data and operator reports for each operational E-Z Treat Pretreatment system installed in North Carolina under this Innovative Approval. Effluent data should be compiled and submitted electronically. If available, a web -based system for data posting of laboratory results should be utilized. These reports shall provide information to the Department based upon the monitoring data and observations made from the Innovative systems installed pursuant to this Approval. This should include an assessment of system performance in relation to the established treatment performance standards; an assessment of physical and chemical properties of the materials used to construct the system, in terms of strength, durability, and chemical resistance to loads and conditions experienced, recommended areas of applicability for the system; and any conditions and limitations related to the use of the system. The report shall also include an updated list of authorized designers, installers, and ORCs. X. Repair of Systems TWWS-2015-03-R2 January 6, 2017 Page 10 of 10 The provisions of 15A NCAC 18A .1961(1) shall govern the use of the E-Z Treat Pretreatment System for repairs to existing malfunctioning wastewater systems. Approved By: ____ Date: � ELFF Q1 00 �4 t-- p w LV C? wo �t �C* 'o U pY N LLl �Zr4 L� U CL 0 NSF International OFFICIAL LISTING NSF International Certifies that the products appearing on this Listing conform to the requirements of NSF/ANSI Standard 245 - Wastewater Treatment Systems - Nitrogen Reduction This is the Official Listing recorded on December 18, 2015. E-Z Treat P.O. Box 176 Haymarket, VA 20618 703-753-4770 Facility. Rocky Mount, NC Model Number #600 #1200 Rated Capacity Gallons/Day 600 1200 Note: Additions shall not be made to this document without prior evaluation and acceptance by NSF International. 1 of 1 789 N. Dixboro Road. Ann Arbor. Michigan 48105-972i USAC0173848 ] -800-NSF-MARK r 734-769-8010 ww wmsf org XSF NSF International OFFICIAL LISTING NSF International Certifies that the products appearing on this Listing conform to the requirements of NSF/ANSI Standard 350 - Onsite Residential and Commercial Water Reuse Treatment Systems This is the Official Listing recorded on December 18, 2015, L-Z Treat P.O. Box 176 Haymarket, VA 20618 703-753-4770 Facility: Rocky Mount, NC Rated Capacity Model Number Gallons/Day Classification Type #600 600 Class R Wastewater #1200 1200 Class R Wastewater NOTE: Class R - Single family residential dwellings Note: Additions shall not be made to this document without prior evaluation and acceptance by NSF International. 1 of 1 789 N. Dixboro Road. Ann Ai-bor. Michigan 45105-9723 USA C0173848 1-800-NSF-MARK / 734-769-8010 wti«v.nsf arg (9) CAST-A-SEAL 402/402F Submittal Specification A flexible pipe-lo structure connector shall be employed in the connection of the sanitary sewer pipe to precast structures. The connector shall be CAST-A-SEALO 402/402F as manufactured by Press -Seal Corporation, Fort Wayne, Indiana, or approved equal. The connector shall be the sole element relied on to assure a flexible, watertight seal of the pipe to the precast structure, The connector shall consist of a rubber gasket and an external take-up clamp. The rubber gasket element shall be constructed solely of syn- thetic or natural rubber, and shall meet or exceed the physical property requirements of ASTM C 923. The external take-up clamp shall be constructed of Series 300 non-magnetic stainless steel and shall utilize no welds in its construc- tion. The clamp shall be installed by torquing the adjusting screw using a PRODUCT SPECIFICATION and SELECTION torque -setting wrench available from the connector manufacturer. Selection of the propersize connector for the structure and pipe requirement, and installation thereof, shall be in strict conformance with the recommendations of the connector manufacturer. Any dead end pipe stubs installed in connectors shall be restrained from movement per ASTM C 923. The finished connection shall provide sealing to 13 psi (mini- mum) and shall accommodate deflection of the pipe to 7 degrees (mini- mum) without loss of seal. Vacuum testing shall be conducted in strict conformance with ASTM C 1244 prior to backfill. Other testing shall be conducted in strict conformance with the requirements of the connector manufacturer. CAST-A-SEAL402 PIPE SIZE PIPE O.D. RANGE WALLTHICKNESS" APPLICATION 452.0250 1.25' - 2" (31 - 51 MM) 1.5" - 2.75' (38 - 70 mm) 2.5' - 6" (64 - 150 mm) STANDARD 42'. St TQ7 -119 rrlirt) .. ,,.' 2;5"" (54 = t5Q mrnf 452.0402F1 4" (100 mm) 4.2' - 4.7" (107 - 119 mm) 2-5" - 4.0' (54 - 102 MM) Closed Face B°(, b7'(5m "4= (fi 150mrirj ' .SIAIVQARb CAS ADAPTER 3" (75 mm) 3.2" - 3.6' (81 - 91 mm) --- Use with 4" CAST -A -SEAL PRODUCT PERFORMANCE CAST-A-SEAL402/402F meets and/or exceeds all requirements of ASTM C 923, including physical prop- erties of materials and performance testing, including: • 13 psi minimum in straight alignment • 10 psi at minimum 7°angle • 10 psi minimum under shear load of 150 Ibs/in. pipe diameter CAST -A -SEAL 402/402F meets and/or exceeds the requirements of the following Standards, Specifica- tions, Codes, and Test Methods: • ASTM C 923 Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes, and Laterals ASTM C 1644 Standard Specification for Resilient Connectors Between Reinforced Concrete On-Slte Wastewater Tanks and Pipes ASTM C 1478 Standard Specification for Storm Drain Resilient Connectors Between Reinforced Concrete Storm Sewer Structures, Pipes and Laterals ASTM C 1244 Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test IAPMOIANSI Z1000 Standard for Prefabricated Septic Tanks • IAPMOIANSI Z1001 Standard for Prefabricated Gravity Grease Interceptors • NPCA Best Practices Manual for Precast Concrete On -Site Wastewater Tanks NOWRA Model Code Framework TYPICAL TEST RESULTS for CAST -A -SEAL 4020402F (as in ASTM C 1644. C 923. and C 1478) Test ASTM Test Method Test Requirements Typical Result CHEMICAL RESIS- NO WEIGHT TANCE; 1N SULFURIC D 534, AT 22°C FOR NO WEIGHT LOSS LOSS ACID and 1N 48 HRS NO WEIGHT LOSS NO WEIGHT HYDROCHLORIC ACID LOSS TENSILE STRENGTH D 412 1200 PSI, MIN, 2100 PS) -W-GATION AT RRFAK D 412 35D%, MIN. 525% D 2240 (SHORE A *-5 FROM THE HARDNESS DUROMETER) MANUFACTURER'S <2 SPECIFIED HARDNESS DECREASE OF 15%, ACCELERATED D 573, 70: 1°C MAX. OF ORIGINAL 13%TENSILE CHANGE, -14% OVEN -AGING FOR 7 DAYS ENSILE STRENGTH, DE- ELONGATION CREASE OF 20%• MAX. OF ELONGATION CHANGE D 395, METHOD B, DECREASE OF 25%, COMPRESSION TEST AT 70°C FOR 22 HRS MAX. OF ORIGINAL DE. 13% FLECTI ON D 471 IMMERSE 0.75 INCREASE OF 10%. WATER ABSORPTION BY 2-IN.5PECIMEN N DISTILLED WATER MAX. OR ORIGINAL BY 3.50% AT 70"C FOR 48 hrs WEIGHT OZONE RESISTANCE D 1171 RATING 0 PASS LOW -TEMP, BRITTLE POINT D 746 NO FRACTURE AT -40°C PASS TEAR RESISTANCE D 624, METHOD B 200 LBF/IN. (MIN.) 450 LBFIIN. Press -Seal believes all information is accurate as of Its publication date. Information, specifications, and prices are all subject to change without notice. Press -Seal is not responsible for any inadvertent errors. Copyright 2012. 63 Fax: (26 ) 436- 908 PRESS -SEAL CORPORATION Email: sales@press-seal.com Fax (26t)} 436-1908 Protecting Our Planet's Clean Water Supply Web: www.press-seal.com ISO 9001:2008 Re9W-ed • IS(atr.EC 17025Ac edited CAST -A -SEAL 402/402F What It Is CAST -A -SEAL 402/402F is a watertight flexible connector that is cast into the structure when the concrete is poured. The connector is folded into the casting position and placed on the reusable heavy-duty solid plastic mandrel that is installed directly to the form. After the concrete is cured, the form is opened, removing the mandrel from the gasket, but leaving the CAST -A -SEAL 4021402F connector embedded in the concrete. The gasket is then simply unfolded at thejobsite and is tightened around the pipe using the sup- plied stainless steel take-up clamp. CAST -IN BOOT -TYPE CONNECTOR for 1-114" to 6"PVC Pipe (32 mm - 150 mm) How It Performs CAST -A -SEAL 4021402F meets or exceeds Why It's Better all requirements of the following Standards, Codes, Specifications and/or Test Methods: • Simple cast -in design provides flexible watertight connection. • Eliminates infiltration and exfiltration. • Improves on -site system performance and minimizes maintenance. • Protects groundwater from unintended discharges. • Use in on -site treatment structures, grease interceptors, manholes, wet wells, pump and lift stations, stormwater structures, or any application requiring a flexible watertight connector. ASTM C 1227 IAPMO Z1000 ASTM C 11644 1APM0 Z1001 ASTM C 923 NPCA Best Practices ASTM C 1244 NOWRA Model Code ASTM C 1478 Scan (or click) Here To View More info On This Product On The Webi Q9_0A. Attach mandrel Invert gasket Place gasket Strip form and Invert gasket to outside to outside form into casting and mandrel in mandrel, leaving of tank, insert pipe and wall. position. form and pour. gasket in place. tighten take-up clamp. Press -Seal believes all information is accurate as of its publication date. Information, specifications, and prices are all subject to change without notice. Press -Seal is not responsible for any inadvertent errors. Copyright 2012. Phone:800-348-7325 Fax: (260)436-1408 62 PRESS -SEAL CORPORATION Email: sales@press-seal.com Protecting Our Planet's Clean Water Supply Web: www.press-seal.com 190900J.2W8R.XLdvred • 13MEC l 7023Aaemdikd M E set by INFILTRATOR EZset by Infiltrator risers and lids are made from glass reinforced polypropylene, providing superior strength and durability. They come in green or black and in 20", 24", and 30" diameters making them ideal for use with any concrete or plastic tank. The slip resistant lids are fastened using stainless steel screws and can be further secured by installing locking rings. 20" Riser System ■ 20" x 6" Risers (Green or Black) ■ 20" x 12" Risers (Green or Black) ■ 20" Lids (Green or Black) 20" x 6" Riser 20" x 12" Riser 4 20" Lid r 24" Riser System ■ 24" x 6" Risers (Green or Black) ■ 24" x 12" Risers (Green or Black) ■ 24" x 18" Risers (Green or Black) ■ 24" Lids (Green or Black) 24" x 6" Riser 24" x 12" Riser 24" x 18" Riser Adapter Flange 24" Lid 30" Riser System 30" x 12" Risers (Green or Black) 30" Lids (Green or Black) 30" x 12" Riser . . . . . . . . . . 30" Lid - Adhesive Sealant - 20" Locking Rings - 20" Safety Pans - 24" Locking Rings - 24" Safety Pans - 24" Adapter Rings - 30" Locking Rings CDEZset 125 TYP. WALL TH ICKNESS 125 TYP. WALL THI CKNESS 125TYP. WALL THI CKNESS by INFILTRATOR 20" x 6" Riser Cutaway 24" x 6" Riser Cutaway 24" x 18" Riser Cutaway INFILTRATOR WATER TECHNOLOGIES, LLC ("Infiltrator") EZset by Infiltrator LIMITED WARRANTY ONE (1) YEAR MATERIALS AND WORKMANSHIP LIMITED WARRANTY (a) This limited warranty is extended to the end user of an EZset by Infiltrator riser and lid system and other accessories. An EZset system manufactured by Infiltrator, when installed and operated in accordance with Infiltrator's installation instructions and local regulation by a licensed installer, is warranted to you: (i) against defective materials and workmanship for one (1) years after installation. Infiltrator will, at its option, (I) repair the defective product or (ih replace the defective materials. Infiltrator's liability specifically excludes the cost of removal and/or installation of the EZset system. (b) In order to exercise its warranty rights, you must notify Infiltrator in writing at its corporate headquarters in Old Saybrook, Connecticut within fifteen (15) days of the alleged defect. (c) YOUR EXCLUSIVE REMEDY WITH RESPECT TO ANY AND ALL LOSSES OR DAMAGES RESULTING FROM ANY CAUSE WHATSOEVER SHALL BE SPECIFIED IN SUBPARAGRAPH (a) ABOVE. INFILTRATOR SHALL IN NO EVENT BE LIABLE FOR ANY CONSEQUENTIAL OR INCIDENTAL DAMAGES OF ANY KIND, HOWEVER OCCASIONED, WHETHER BY NEGLIGENCE OR OTHERWISE. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THIS LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU. THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE. 4w;�_ INFILTRATOR® systems inc. 4 Business Park Road P.O. Box 768 Old Saybrook, CT 06475 860-577-7000 • Fax 860-577-7001 1-800-221-4436 www.infiltratorwater.com 125 TYP. WALL THICKNESS .125 TYP. WALL TH ICKNESS 125 TYP WALL THICKNESS Riser Specifications 22 20" x 12" Riser Cutaway 24" x 12" Riser Cutaway 30" x 12" Riser Cutaway (d) THIS LIMITED WARRANTY IS THE EXCLUSIVE WARRANTY GIVEN BY INFILTRATOR AND SUPERSEDES ANY PRIOR, CONTRARY, ADDITIONAL, OR SUBSEQUENT REPRESENTATIONS, WHETHER ORAL OR WRITTEN. INFILTRATOR DISCLAIMS AND EXCLUDES TO THE GREATEST EXTENT ALLOWED BY LAW ALL OTHER WARRANTIES, WHETHER EXPRESS OR IMPLIED, OR STATUTORY, INCLUDING ANY WARRANTY OF MERCHANTABILITY, FINESSE FOR A PARTICULAR PURPOSE AND ANY IMPLIED WARRANTIES OTHERWISE ARISING FROM COURSE OF DEALING, COURSE OF PERFORMANCE, OR USAGE OF TRADE. NO PERSON (INCLUDING ANY EMPLOYEE, AGENT, DEALER, OR REPRESENTATIVE) IS AUTHORIZED TO MAKE ANY REPRESENTATION OR WARRANTY CONCERNING THIS PRODUCT, EXCEPT TO REFER YOU TO THIS LIMITED WARRANTY. EXCEPT AS EXPRESSLY SET FORTH HEREIN, THIS WARRANTY IS NOT A WARRANTY OF FUTURE PERFORMANCE, BUT ONLY A WARRANTY TO REPAIR OR REPLACE. (e) YOU MAY ASSIGN THIS LIMITED WARRANTY TO A SUBSEQUENT PURCHASER OF YOUR HOME. (F) NO REPRESENTATIVE OF INFILTRATOR HAS THE AUTHORITY TO CHANGE THIS LIMITED WARRANTY IN ANY MANNER WHATSOEVER, OR TO EXTEND THIS LIMITED WARRANTY. CONDITIONS AND EXCLUSIONS There are certain conditions or applications over which Infiltrator has no control. Defects or problems as a result of such conditions or applications are not the responsibility of Infiltrator and are NOT covered under this warranty. They include failure to install the EZset system In accordance with Instructions or applicable regulatory requirements or guidance, altering the EZset system contrary to the installation Instructions and disposing of chemlcals or other materials contrary to normal EZset system usage. The above represents the Standard Limited Warranty offered by Infiltrator. A limited number of states and counties have different warranty requirements. Any purchaser of an EZset system should contact Infiltrator's corporate headquarters in Old Saybrook, Connecticut, prior to such purchase to obtain a copy of the applicable warranty, and should carefully read that warranty prior to the purchase of an EZset system. U.S. Patents: 4,759,661; 5,017,041; 5,156,488; 5,336,017; 5,401,116; 5,401,459; 5,511,903; 5,716,163; 5,588,778; 5,839,944 Canadian Patents: 1,329,959; 2,004,564 Other patents pending. Infiltrator, Equalizer, Quick4, and SideWinder are registered trademarks of Infiltrator Water Technologies. Infiltrator is a registered trademark in France. Infiltrator Water Technologies, is a registered trademark in Mexico. Contour, MicroLeaching, PolyTuff, ChamberSpacer, MuRiPort, PosiLock, QuickCut, QuickPlay, SnapLock and Straighti are trademarks of Infiltrator Water Technologies. PolyLok is a trademark of PolyLok, Inc. TUF-TITE is a registered trademark of TUF-TITE, INC. Ultra -Rib is a trademark of IPEX Inc. © 2013Infiltrator Water Technologies, LLC. All rights reserved. Printed in U.S.A. SET01 06131SI A lw� M MIJUJI Toll Free: 888-999-3290 1�um Bristle Filter Instructions For STF-110 4" (Installation &Maintenance) Instructions for installation in standard 4" outlet "Tee" of septic tank. 0 Orient the filter so that the wire handle faces opposite the discharge outlet. Push filter into top of "Tee" until the 90 degree wire handle touches the top of the "Tee". The filter is now "installed", as shown in the picture to the right. • The flexibility of the STF-110 bristle filter allows it to be used in just about any situa- tion. If you need help with a custom installation please call Sim/Tech Filter toll free at 888-999-3290. Installed Filter Recommended maintenance schedule For maximum protection, it is recommended that the filter be replaced annually. If not, it should be inspected at least once per year. The filter is capable of lasting three years under normal conditions. Such factors as garbage disposals, pets, laundry, etc. may cause the need for more frequent inspection or service. Instructions for performing maintenance in standard 4" outlet "Tee" of septic tank. STF-130 Maintenance Sleeve • Before removing filter, one of two options must be performed. These options need to be performed to prevent any outflow of unfiltered effluent from the tank while the filter is removed. Option 1 Insert a STF-130 maintenance sleeve (sold separately) with the handle coupling on the same side of the "Tee" as the outlet hole. Push the sleeve into the "Tee" until the handle coupling hits the top of the "Tee". Do not remove the sleeve until a filter has been put back in the "Tee". Option 2 Have the tank pumped down by a professional septic service company. • After performing one of the options above, remove filter by pulling up on the filter handle. • Place the used filter in the provided plastic bag for proper disposal. • Install a new replacement filter as described in the installation instructions at the top of the page. If a maintenance sleeve was used (option 1), remove the sleeve from the outlet "Tee" Maintenance Sleeve partially inserted into "Tee" U.S. Patent # 6,811,692 The STF=110 ;series Effluent Filters it -S, Superior Superior to slotted. "niform designs. Flexible ersatile - The Best rom►nnn debris. P. It's Simple only rhoire in effluent filters. „ d i a. 0@@L50DQQ STF-11¢$B STF-110-7R STF-110-6W do STF-110 J • Mrrpierlur Mtrorism of the most commfln Selids ie ire today's +astewawr systen-M Versatile d��ig" has app#icatiian5 for residential, commercial and industriasystems and fit mang different types of teeFP and huusing� Flexible bristle-daerwign is simple to install and gervire. avan in systems with limited access • Self-larAlki g bt'fst'les hold the filter firmly in place wvitl-h ou need for receiverj5 nr canisters and eliminate filter float -up 1M• HL-_8ris separatr`arr aroma naturally sorts 5oli[#F according to 5i-ze and ma$� for longer filter life Alln'w_4w hFANlJUglc"l rnaterrFrig necessary in vva5tewater treatment system-5 * fluriable enough to de ser Oced and economical enough to tie replaced • Iral rintutfun for protecting and servicing all types of wastewater 5qwWms at a fracUon of the cost of inferior designs Designed after our proven STF-11 D effluent filter that currently protects residential septic systems all over the world, the latest additions to this series of filters were designed with mole demanding For the prvtectr on and perfbrmar;lcae z7F wastevratar syHtams by VV.VVtr - _ ;r teC.�, , CAM BEB-999-2.� US Patorrt # 6r611.692 YL,110W FEATURES Easy, affordable solution for servicing septic tanks •:� Designed with non -directional bristles for unrestricted flaw of effluent .• Allows biological maturing and sloughing to maximize septic tank efficiency v Provides well over '/z mile of filtration media with over 319 cu. in. of open area to eliminate clogging 2,215 sq, in. of filtering surface allow a flow rate of over 1200 GPD. filtering to 1116" diameter Filtering surface is achieved with unique triangular bristle that more than doubles the filtering surface, with no uniform holes or slots to plug 90 degree handle for easy installation and removal Adapts to all types of 4" pipe Self-locking bristles hold the filter firmly in place, eliminating 'filter float up' •:� Flexible design makes it easy to install in hard to reach places and makes replacing the triter a breeze •:� Constructed of polypropylene bristles, wound together with a 316 S.S. core l he filters designed shape creates a debris separation space which naturally sorts debris according to size and mass, ensures even filter usage for a long lifespan and maximizes circular flow Oder pan No. STF-110 STF•130 CAD detail drawing available in DXF format RELATED PRODUCTS STF-110-6W page 4 STF-11+3-7R page 4 STF-110-813 page 4 STF-130 page 14 STF-4TEE page 14 U.S. Patent # 5, 811, 692 it/ 4.313 PVC PIPE: 2.0 MAINTENANCE w SLEEVE 40 3.0 �o 29.25 STF-nil 12.1215 I 5YF4TEE SEPTIC TEE RADIUS 176 I V _. 3-6 PAGE 3 Tall Free 888-999-3290 Office 231-582-1020 Fax 231-582-7324 Ernail slmtech@freeway.net Web www.gag-simtech.com • SIM/TECH FILTER NEW STF-I 10 DISPOSABLE SEPTIC TANK FILTER TURD PARTY VERIFICATION, The Disposable Septic Tank Filter is constructed as a twisted -in -wire brush with 26" long brush body, V4" tip and 2 1/4" long handle end with 90 degree bend. Brush body will have a major diameter of 4.313" for a length of 9 1/2" starting V2" from the 90 degree handle bend, then will transition down to 3 V2" diameter over the next 2 %2" and held at 3 1/2" diameter for the next 14". There will be a scallop cut into the O.D. in the major diameter beginning 2 1/2" from the top, transitioning down to 3 !,T' over the. next 2", and then transitioning up to the major diameter over the next 2". The stem will be 11 -gauge stainless steel and the fill material will be .012 yellow poll.propylene. filter has a total of 2,962 lineal feet of bristle equaling 35,544 lineal inches of bristle. By calculating the total length x the total perimeter of Siniffechs uniquely shaped bristle, it gives us a filtering surface of 2,215 square inches. l Volume of a Ar 'x26" Septic Tee Volume of the STF- I 10 Filter Volume as open for fluid t of stlev / 0 V GARY B. F 10 N 9N EER 3 a] 0 F 326.7 cubic inches 4.265 cubic inches 322.435 cubic inches M TtURD PARTY VERIFICATION OF FILTRATION ON TBE STF- I 10 AND THREE OT MR GRAVITY SEPTIC TANK, FILTERS • Test was checking for filtering qualities with particulate that could be found in septic tank effluent • This test used five types of particulate added to a clean tank • The five types of particulate were hair, seeds, tissue paper, Ent, and chain saw chips (see table A below) • Test tank was riled manually every five minutes while performing tests to represent a large influx of water Water was introduced into the test tank- at 210 gallons per hour • Test was run to a 2" head height above outlet flow • Recorded length of time to achieve a 2" head height (see table B below) • Recorded what was caught in a 1500 micron sieve during the total run time (see table B below) • Recorded what was caught in a 600 micron sieve below the 1500 micron sieve during total run time (see table B below" • Recorded particulate caught while changing filters 15 minutes after ending test using manufacturers recommended instructions (see table B below) • Recorded particulate removed with filters themselves (all filters were removed slowly) (see table B below) • All part ' iculate was recorded in grams using a OHAUS Scout 11 Scale (Serial #BJ380398) with capacity 400 times 0.1 g (purchased scale 11/17101 TABLE A -6�Mms Human hair 2 Horse hair 2 Dog hair I Cat hair I Tomato seeds 2 Pepper seeds 2 Cucumber seeds 2 Dill seeds 2 Charmin tissue paper 2 Scott tissue paper 2 Northern tissue paper 2 Lint 2 Chainsaw chips 1 4 TABLE B Sim/Tech Tuff-Tite Zabel Zoeller Zoeller Time to achieve 2" head height I hr. 40 min. 7 min- 6 min. 2 Particulate caughl in 1500 micron sieve 0 0 0 0 0 Particulate caught in 600 micron sieve 0 0.2 0.3 1.2 Particulate caur�!t while chaneng filter 0 0.3 0 0 Particulate contained within or on filter 6.3 2.2 t2.3 *Ended test at 2 hours, total head height was at 1 3/41, Note: All filters except Sim/Tech caught seeds in 1500 micron sieve but was not recordable in 1/10c, scale 11,11111IM11", I I: I A, Mel 1: 1 a MMI INF W M ATA a W&I a 2 V I W KWAAA 1UN 124 a a 10 K gal k • Test done with clean water and no particulate • Filters placed in a standard outlet tee of S & D type with a 17" tailpiece to outlet level • Test tank was a plastic 55 gallon drum • There was an accurate method to measure head height above outlet level • Test was done for a '/2" and P head height above outlet level • AAI filters tested using the above conditions WMA-1144MI'MM, I EMIN head hei ht above outlet /2 bo flow t I I S MVII 111 0, I" head hekght above outlet now 5. 1 5 of ylc,/ GORY B. N EER tt 32 31 OFE It is my opinion that the Simqech filter will prove to be a superior septic tank filter because of ifs basic design; bristles to catch any "paper like" debris on the outside surface ( guided there because of the bristles bending at the ends under pressure of the flow ) . A dead zone near the center to collect small particles as they M out of the flow. Plus the incalculable water paths through, and around, the filter fibers. Gary B. Johnson P.E. 363 Silver Creek- Rd Petoskey, Mi 49770 `� of a #C.V GARY B- JokV is EER 3t28 I **FES% PAL �X lnc. Innovations in Precast, Drainage " Zabel® & Wastewater Products A Division of Polylok Inc. PL-122 Filter PL-122 Effluent Filter The PL-122 was the original Polylok filter. It was the first filter on the market with an automatic shut-off ball installed with every filter. When the filter is removed for regular servicing, the ball will float up and prevent any solids from leaving the tank. Our patented design cannot be duplicated. Features: • Offers 122 linear feet of 1/16" filter slots, which significantly extends time between cleaning. • Has a flow control ball that shuts off the flow of effluent when the filter is removed for cleaning. • Has its own gas deflector ball which deflects solids away. • Installs easily in new tanks, or retrofits in existing systems. • Comes complete with its own housing. No gluing of tees or pipe, no extra parts to buy. • Has a modular design, allowing for increased filtration. PL-122 Installation: Ideal for residential waste flows up to 3,000 gallons per day (GPD). Easily installs in any new or existing 4" outlet tee. 1. Locate the outlet of the septic tank. 2. Remove the tank cover and pump tank if necessary. 3. Glue the filter housing to the outlet pipe, or use a Polylok Extend & Lok if not enough pipe exists. 4. Insert the PL-122 filter into tee. 5. Replace and secure the septic tank cover. PL-122 Maintenance: The PL-122 Effluent Filter will operate efficiently for several years under normal conditions before requiring cleaning. It is recommended that the filter be cleaned every time the tank is pumped, or at least every three years. 1. Do not use plumbing when filter is removed. 2. Pull PL-122 cartridge out of the tee. 3. Hose off filter over the septic tank. Make sure all solids fall back into septic tank. 4. Insert filter back into tee/housing. Polylok offers the only filter on the market where you can get more GPD by simply snapping our filters together! Patent Numbers 6,015,488 & 5,871,640 In Filter Ready Adapter Connects to Septic Tank Wall Accepts 1/2" PVC :tension Handle Alarm Switch (Optional) 122 Linear Ft. of 1/16" Filtration Slots ilter Housing with & 4" Pipe Adapter " Filtration Slots 31000 GPD 0 Deflector .)matic Shut -Off Ball 6A Outdoor SmartFilter© Alarm Polylok, Zabel & Best filters accept the SmartFilter® switch and alarm. www.polylok.com 1-877-765-9565 NSF. The Public Health and Safety Organization NSF Product and Service Listings These NSF Official Listings are current as of Wednesday, April o6, 2016 at 12.15 a.m. Eastern Time. Please contact NSF International to confirm the status of any Listing, report errors, or make suggestions. Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: htt12://info.nsforg/Certified/Wastewater/Listings.asp? Standard=o 6&Com an = 7oq8o& NSF/ANSI 46 Evaluation of Components and Devices Used in Wastewater Treatment Systems Polylok Inc. 3 Fairfield Boulevard Wallingford, CT o6492 United States 877-765-9565 203-265-6340 Facility: Cheshire, CT Septic Tank Effluent Filters[x] PL-122 PL-250 P L-525 PL-625 PL-68 [1] Performance tested using bead size 0.338 cm ± 0.005 cm (1/8" ± 0.002"). Meets the full requirements of NSF/ANSI 46-2010. Facility: Evansville, IN Septic Tank Effluent Filter Components[i] Alol-12x20 A101-12x28 Alol-BX32 A18ol-018141 A301-12x36 A3ol-8xi8 Alol-12x36 A1o1-8x18 A1801-4X22141151 A301-12x20 A3oi-8X26 A3o1-8x32 Alol-8x26 A3o1-12x28 [11 Septic Tank Effluent Filter Components are exempt from bearing the NSF Component Mark and shall bear the NSF Unit Mark. [4] Filter cartridges Certified in ABS and PVC materials, [5] Failure sensing and signaling equipment of this product not evaluated by NSF. Septic Tank Effluent Filters[21 [31 Aioo-12x20 AloO-12x20-VC Aioo-12x2o/BALL Aioo-8x18-VC A1oo-8x26-VC A100-8x32-VC A1800-4x18-VT-B4o A1800-4x18-VTF-B85A1800-4x18-VTF-B40 A1800-4x22-VT-B40 Ai800-4x22-VTF-B35A1800-4x22-VTF-B40 A3oo-12x20/BALL A3oo-12x28-VC A3oo-12x36-VC A300-8x32-VC Moo-12x2o A600-12x2o/BALL A600-8x18-VC Moo-8x26-VC A600-8x32-VC Aloo-12x28-VC A1oo-12x36-VC A18 oa-4x18-3o142-68 A1800-4x18-VT-B35 A1800-4x22-30142-68A1800-4x22-VT-B35 A300-12x20 A3oo-12x20-VC A3oo-8xi8-VC A3oo-8x26-VC A600-12x28-VC A600-12x36-VC [2] Suffix VC denotes a filter cartridge with Versa -Case assembly. [3] Performance tested using bead size 0.338 cm ± 0.005 cm (1/8" ± 0.002"). Meets the full requirements of NSF/ANSI 46-2010. NOTE: All filters come Smartfilter ready. Number of matching Manufacturers is 1 Number of matching Products is 52 Processing time was o seconds 0 Ul A - Cn W N � N w O O N W O rT O O z W Z O O O O w O O O Z D i00 L m D Z DAVLD BRANTLEY &SONS PREPARED FOR : David Brantley & Sans REMSON NO. DATE BRANTLEY TAN( MODEL 37 Pm Ridge Rd. Origins!Sbmittal April 11, 2014 37 Pine Ridge Rd. Zenulan, NC 27597 Redsi°n I 1,250 ST 323 Zebulon, NC 27597 DATE : April 11, 2014 Office 252-478-3721 Re"'i°° 2 canrncr: Fax 919-573-0443 CORY BRANTLEY Re„slan 3 SHEET NUMBER Naeter Set ----- 1 of 1 linstalleregmail.com N 00 00 CD 4� 00 N z EA cl�N Z O o D n n co m D Z DAVLD BRANTLEY &SONS PREPARED FOR : David Bromley & Sans RENSON NO. DATE BRANTLEY TANK MODEL 37 Pm Ridge Rd. Original Submittal April II, 2014 37 Pine Ridge Rd. Zebulaa, RC 27597 Revision I 1,000 PT 237 Zebulon, NC 27597 DATE : April 11, 2014 Office 252-478-3721 caNrncr: Re"'ion 2 Fax 919-573-0443 CORY BRANTLEY Re„eian 3 SHEET NUMBER Master set ----- 1 of 1 linstalleregmail.com m a _ J O m � m J UT J V Lo i ® �o 01 c O � J W cl O W O J Q1 DAVLD BRANTLEY &SONS PREPARED FOR : David Brantley & Sons REN90N NO. DATE BRANTLEY TANG MODEL 37 Pi,. Ridge Rd. Origins! Sbmittal April II, 2014 4 500 PT 37 Pine Ridge Rd. Zehulan, NC 27597 Redden I Zebulon, NC 27597 DATE: April11, 20I' H2O-506 Office 252-478-3721 CONTACT: Re"'i°" 2 Fax 919-573-0443 CORY BRANUY ReHsion 3 SHEET NUMBER linstallerpgmail.com 1 of 1 EZ-<,-�-- �•TREAT Re -Circulating Synthetic Filter E-Z Treat is a modular system with proven performance in residential and commercial applications. E-Z Treat is prepackaged in a "pod" featuring synthetic media encapsulated in a flexible mesh container. E-Z Treat protects sensitive watersheds through removal of nitrogen and other constituents. Application! Residential Commercial or community Intermittent or seasonal use Space constrained sites Harsh climates Nitrogen sensitive areas Water Reuse Models bearing the NSF mark are certified Class to one or more of the following standards: NSF/ANSI 40 NSF/ANSI245 NSF/ANSI 350 E� TREAT ;;wmowl Re -Circulating Synthetic Filter Why Choose E-Z Treat? o Produces water reuse quality effluent O Certified to NSF/ANSI Standards 40, 245, and 350 o Proven results for over 15 years through third party field testing O Spray nozzles maximize oxygen contact through small water droplet size o Simple to use and suitable for wide range of applications o Prepackaged, lightweight pod for easy installation o Synthetic media: - Resists biological clogging - Provides large, open surface area - Allows free air flow - Requires no media cleaning Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Pre -assembled Pod Flexible configurations Multiple sizes available Lightweight pods Non -clog media High level denitrificatior Optimized for water rep .ZI �" Wq TREAT Re -Circulating Synthetic Filter 1. Collection Sewage flows from the home or facility into a watertight primary tank or chamber. The solids settle and the liquid effluent flows by gravity through an effluent filter to the system. 2. Treatment The E-Z Treat Re -circulating Synthetic Filter provides passive biochemical treatment through an active biofilm matrix. The styrene media is very uniform and provides ample surface area for biological growth. The styrene media contains many voids to accommodate optimum air and liquid flow. The spray nozzles create very small water droplet size (mist), thereby maximizing oxygen contact. 3. Dispersal The re -circulation chamber contains a float ball by-pass valve and re -circulation pump. The by-pass valve connects to the 4" return line from the E-Z Treat pod. The by-pass valve allows the effluent to be constantly re -circulated through the styrene media. Treated effl gravity drainfield or into a pump chamber for dosing LPP, drip irrigation, or other pressurized drainfelds. Effluent is suitable for reuse. UV disinfection may be required. uent exits the by-pass valve and flows into a NSF Testing Performance Summary Parameters Effluent, Avg. BOD5 2 rng/I TSS 2 mg/I DO 3.3 mg/I Turbidity 2 NTU E. col! * 2 MPN/100ml PH 6.8 —7.5 Total Nitrogen Reduction 64% *with optional UV disinfection Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Standard Model Package: A Item Description 1 STEP--2�Pe-circulation Purnp, 1/2 HP 2 FloaL By -Pass Valve 3 Control Panel 4 SLyrene Media *Septic tank effluent filter is supplied by others Please Note: pump is changed to STEP-30 1 /2 hp by E-Z Treat See pump curve and friction/TDH calculations attached in this section. rklfj L . del 1200 314" LL VALVE Eta oo P.mURE GAUGE 1" BALL VALVE • I,[rl 4' $ — 31.)0 8 ]5.50 15.50 41.50 SPRAY NOZZLE E-Z T a Models bearing the NSF mark are certified Class to one or more of the following standards: NSF/ANSI40 NSF/ANSI 245 NSF/ANSI 350 E�IZTREAT Re -Circulating Synthetic Filter Installation or Inspection Checklist NSF Models bearing the NSF mark are certified Class to one or more of the following standards: NSF/ANS140 NSF/ANSI 245 NSF/ANSI 350 ©2017 E-Z Treat 2-2017 Pre -construction Meeting ❑ Pre -construction meeting held? Personnel present at pre -construction meeting (check all that apply): ❑ Owner ❑ Builder ❑ Engineer or Designer ❑ Regulator ❑ Installer ❑ Service Provider Septic Tank ❑ Septic tank sized per code or certification criteria? ❑ Is septic tank installed per manufacturer's requirements? N ❑ Does septic tank, riser(s), and access cover(s) meet applicable structural standards? ❑ 1/16" commercial effluent filter/screen installed on outlet? ❑ Is effluent filter/screen able to be removed for cleaning? rt ❑ Is septic tank accessible? 0 ❑ Are septic tank, risers, and access covers watertight? 0 Re -circulation Tank I ❑ Re -circulation tank sized per code or certification criteria? N .a ❑ Is re -circulation tank installed per manufacturer's requirements? (p ❑ Does re -circulation tank, riser(s), and access cover(s) meet applicable structural standards? 0 ❑ Is re -circulation tank accessible? 0• ❑ Are re -circulation tank, risers, and access covers watertight? ❑ All piping from septic tank to re -circulation tank installed per code? n ❑ Is the by-pass valve installed in the re -circulation tank properly? S ❑ Is the by-pass valve inlet connection from E-Z Treat pod installed properly? n ❑ Is the by-pass valve outlet connection to gravity drainfield or to drainfield pump tank/basin installed properly? r+ Pump ❑ Is pump installed per manufacturer's requirements and code? ❑ Is pump accessible and removable? ❑ Is quick disconnect method (union, camlock, or pitless adapter) installed? (Don't install a check valve!) ❑ Is 1/8" drainage and anti -siphon hole drilled in the PVC pump supply pipe just above the discharge end of the pump? ❑ Is pump installed, connected, and tested? (type, gauge and length of wire, connected using water -proof connectors and the conduit sealed -off) Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Forre Mair, ❑ Is force main been installed with pressure rated fittings/pipe and per code? ❑ Are PVC fittings and pipe cleaned, primed, and glued properly? ❑ Is the force main sized according to manufacturer's recommendations? ❑ Is force main watertight? ❑ Is the force main installed to allow for drain -back to prevent freezing of piping, if applicable? E-Z Treat Pod ❑ Stone pad size large enough for pod to set on (6'W x 91 x 4'H)? ❑ Stone pad depth sufficient and leveled for pod to drain towards 4" outlet? ❑ Is pod leveled and sloped V toward the bottom outlet drain? Ila ❑ Is 4" return line to by-pass valve installed and per code? El Are PVC fittings and pipe cleaned, primed, and glued properly? N❑ Is the return line sized according to manufacturer's recommendations? ❑ Is return line watertight? ❑ Pod lid secured and cleaned off? fu r+ p' Soil Grading Around Pad O ❑ Is area covered with suitable topsoil (free from large stones or sharp objects) around the pod? ❑ Is suitable topsoil packed around pod? 3 ❑ Is suitable topsoil been lightly compacted around lid of pod to prevent settling? (A ❑ Is the area been seeded and straw placed on top of topsoil for stabilization? fD n COkILF V1 rcanri and Elcctrlta, r+ C• Check all that apply: 0 Type of timer: ❑ Analog ❑ Digital S Elapsed Time Meter: ❑ Yes ❑ No nCycle Counter: ❑ Yes ❑ No Panel heater: ❑ Yes ❑ No (A rF ❑ Is control panel installed per manufacturer's requirements and code? ❑ Is a NEMA 4Xjunction box used for all float and pump connections? ❑ Are floats installed, connected, and tested? (type, gauge and length of wire, connected using water -proof connectors, and the conduit sealed -off) ❑ Is power connected per code? (type, gauge and length of wire, and the conduit sealed -off) ❑ Is conduit used between control panel and re -circulation tank? ❑ Is the re -circulation pump timer set based on the manufacturer's criteria? Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat EnZ4�01TREAT Re -Circulating Synthetic Filter Design Guide and Installation Manual NSF Models bearing the NSF mark are certified Class to one or more of the following standards: NSF/ANSI 40 NSF/ANSI 245 NSF/ANSI 350 ©2017 E-Z Treat 2-2017 TABLE OF CONTENTS 1.0 Treatment Process Overview 2.0 Design 2.1 Re -circulation Tank Sizing 2.2 Filter Performance 2.3 Operating Costs 2.4 E-Z Treat Loading Rates 2.5 System Overview 2.6 Spray Manifold System 2.7 Filter Media Mattress Material 2.8 Decentralized Design Options for Commercial, Community, or Large On -site Systems 3.0 Installation Instructions 3.1 Pre -construction Meeting 3.2 Off Loading Treatment System 3.3 Excavating and Installing the Pod 3.4 Piping the E-Z Treat Pod Supply and Return 3.5 Installing the By -Pass Valve 3.6 Installing the Re -circulation Pump 3.7 Setting Pump Control Floats 4.0 Start-up Appendix 1: Model 600 Configurations Appendix 2: Model 1200 Configurations Appendix 3: Typical Commercial Configurations Appendix 4: High Strength Waste Case Study 1 1 1 2 2 2 3 7 7 rH 12 12 12 13 13 13 14 14 15 18 20 22 24 v M l0� 3 0 C M r 1.0 Treatment Process Overview The E-Z Treat Re -circulating Synthetic Filter system operates as a fixed media, packed bed filter system. In these treatment systems, larger solids contained in the applied effluent are retained within the media by filtration, typically in the upper level of the filter media. A bacterial film forms on the surface of media grains and provides for removal of soluble organic material and small colloidal matter by absorption by the bacteria in the film. Decomposition of the absorbed material occurs during rest periods in the filter, when there is no application of effluent. The organic material becomes an energy source for the bacteria to maintain them- selves and produce new cells. Over time, as the filter matures, the film layer forms through- out the depth of the filter media and by-products of the biological process pass out of the fil- ter. Re -circulation of the water leaving the filter back through the filter surface provides for additional treatment by the bacteria in the media bed, as well as a mechanism for moving par- tially decomposed organic materials, bacterial waste products and other debris from the fil- ter. This keeps the pore spaces within the media from clogging. Treatment using recirculating media filtration systems is generally an aerobic process and re -aeration of the media, which occurs during the resting (non -dosing) periods, is essential for proper treatment. 2.0 Design Many types of media are used in packed bed filters. Washed, graded sand was the most common. Other granular media used include crushed glass, garnet, anthracite, plastic, expanded clay, expanded shale, open -cell foam, extruded poly- styrene, and bottom ash from coal-fired power plants. Table 1 Recommended System & Re -circulation Chamber Sizes for Residential Applications 300 750 300 1 1 400 750 400 1 1 500 900 500 1 1 600 900 600 1 1 700 1000 700 1 1 800 1000 800 2 1 900 1500 900 2 1 1000 1500 1000 2 1 1100 1500 1100 2 1 1200 2000 1200 2 1 1300 2000 1300 2 1 1400 2000 1400 2 1 Notes: 1. Tank sizing are not exact and may vary (+ or —10%) based on availability of locally Media characteristics produced tanks. can limit the number of 2. For seasonal or intermittent use applications, please contact us for design guidance. doses possible. Media re -aeration must occur between doses. As the effective size of the media decreases, the time for drainage and re -aeration of the media increases. The BOD5 loading should decrease with decreasing effective size of the sand. 2.1 Re -circulation Tank Sizing For single-family home systems, the re- circulation tank is typically sized to be equal to 0.75 to 1 times the design peak daily flow. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat C 2.2 Filter Performance When treating domestic strength sewage (300 mg/I BOD5 or less) up to the design flows and loads, a properly maintained E-Z Treat Re -circulating Synthetic Filter will typically perform better than the 30-day average requirements of NSF Standard 40 Class 1 (25 mg/I CBOD5 and 30 mg/I TSS). Reductions in the CBOD5 and suspended solids (TSS) influent concentrations will be attained within a few weeks of commissioning and should be consistently achieved over the lifetime of the styrene media. CBOD5 and suspended solids (TSS) treatment performance in the styrene media is not subject to significant variation with ambient air temperature fluctuations. 2.3 Operating Costs Power costs for pumping at 3 to 4 kWh/day are in the range of $9 to $12/month. The E-Z Treat Re -circulating Synthetic Filter system incorporates technology resulting from years of independent research in re -circulation sand bio-filtration. Our system applies each area of this technology in a pre- packaged system. This ensures consistent field performance in reducing BOD, TSS and Total Nitrogen. The system addresses media size and composition, drainage and ventilation, optimum dosing cycles per hour, depth of filter media, pre-treatment of effluent, pre -filtering of effluent to ensure particle size, even distribution of effluent over the media, and piping design that optimize treatment within the system. Table 2 NSF Testing Performance Summary Parameter Effluent, Avg. BODS 2 mgll TSS 2 mgll DO 3.3 mg/I Turbidity 2 NTU E. coli 2 MPN/100mi pH 6.8 - 7.5 Total Nitrogen Reduction 64% *with optional UV disinfection 2.4 - -Treat Loading Rate! In accordance with the EPA Design Guidelines and field testing of the E-Z Treat Re -circulating Synthetic Filter Model 600 can be continuously loaded at 750 GPD and 2lb BOD. Model 1200 can be continuously loaded at 1400 GPD and 4lb BOD. EPA research and testing has proven that system designs, such as the E-Z Treat Re -circulating Synthetic Filter system, will produce a high quality effluent at loading rates in excess of 25 gal/ft2/day. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat 2.5 System Overview Prior to entering the re -circulating pump tank the effluent will be treated in an anaerobic chamber fitted with an effluent filter; this filter should remove any solids greater than 1/16". The second chamber will be a re -circulation chamber fitted with a float ball by-pass valve and re -circulation pump. The float ball by-pass valve connects, inside the re -circulation tank, to the 4" return line from the pod. The float by-pass valve maintains a constant liquid volume in the re -circulation tank. The float by-pass valve allows the effluent to be constantly re -circulated through the synthetic filter discharging only the daily forward flow volume after it has passed through the pod. In designs using an external splitter box the float by-pass valve would be eliminated from the re -circulation chamber. Standard Model 600 Package: 1 Model 600 Pod 2 STEP-20 Re -circulation Pump, 1/2 HP 3 Float By -Pass Valve 4 Control Panel 5 Septic Tank Effluent Filter (supplied by others) Recirculation Pump is changed to STEP 30 1 /2 hp by E-Z Treat © ! Please see the pump curve and friction/TDH calculations provided by E-Z Treat Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat STEP-20 Re -circulation Pump Table 3 Pump Specifications Recirculation Pump is changed to STEP 30 1/2 hp by E-Z Treat Please see the pump curve and friction/TDH calculations provided by E-Z Treat Shell Stainless steel Discharge 10, 20 and 30 GPM models: fiberglass -reinforced thermoplastic; 50 GPM models: stainless steel Discharge Bearing Nylatron'F' Impellers Delrin' Diffusers Polycarbonate Suction Caps Polycarbonate with stainless steel wear ring Thrust Pads Proprietary specification Shaft and Coupling Stainless steel 300 grade Intake Fiberglass -reinforced thermoplastic Intake Screen Polypropylene Jacketed Cord 300 volt "SOOW" jacketed 10" leads (2-wire with ground); optional 20", 30", 50" and 100" lengths available Delrin° is a registered trademark of E.I. Dupont de Nemours & Company Nylatron® is a registered trademark of Polymer Corporation S.T.E.P. Plus is a registered trademark of Pentair Water In order to provide the best products possible, specifications ar subject to change. Table Pump Performance —20GPM Capacity Liters per Minute 0 25 50 75 100 300 80 250 zoo so °' CD ,CUD 150 _FU= 40 'C'D' I° 100 20 50 0 10 20 30 Capacity Gallons per Minute Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat 2.6 Spray Manifold System To maximize the effectiveness of every cubic inch of the media material, the Model 600 employs a spray manifold with 8 evenly spaced wide-angle spray nozzles and Model 1200 employs 12 nozzles. The nozzles are plastic rant 1 construction with a free passage of 0.0625" in diameter; this large free passage helps prevent nozzle clogging while maintaining a consistent misting spray. The manifold is assembled with a pressure gauge and valves } allowing for flow rate adjustments. Q Mod iD to 2.7 ruler meuia maLLress maLenak ts, n The E-Z Treat Re -circulating Synthetic Filter C7 system employs a manufactured synthetic C media which is encapsulated in a mattress �. like container. The mattress is fabricated from (D a non -biodegradable; chemically resistant, 0) loose weave polypropylene material with a weave pattern at 90 degree intersections creating 0.078 square openings allowing effluent and air to flow freely while containing e-F the media material. This media is very uniform and provides ample r F surface area for biological growth. The media p also has enough voids to accommodate good air and liquid flow. These void spaces also 3 allow the passage of very small solids that fll would clog many filters. The media is very lightweight making it resistant to compaction 0) which can lead to poor air and liquid flows, a problem that plagues many media filters. The media consists of lightweight, non - biodegradable plastic spheres. 9.3M Polypropylene Mattress Material Styrene Media IIVALVE Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat 3.0 Installation Instructions E-Z Treat Company or its representative will conduct on -site training with each installer before they are certified to install E-Z Treat systems. The training will include instruction on proper site prep, locating pod, equipment handling, excavation, pod placement, piping, wiring and start up of the E-Z Treat system. Annual classroom training will be a requirement for installers to maintain their certification. As a condition of E-Z Treat certification, contractors must have proper state and local licenses and appropriate insurance policies. E-Z Treat distributors will only sell or authorize installations by E-Z Treat certified installers. The E-Z Treatment pod will ship pre -assembled, requiring only field piping of the pod supply line and discharge line, installing the re -circulation pump, 4" float by-pass valve and the re -circulation control. When installing the E-Z Treat system the order of components installation is not critical and each segment can be installed independently. 3.1 Pre -construction Meeting A pre -construction meeting is recommended before any construction commences. This meeting is an opportunity for the owner, builder, engineer/designer, local regulatory agencies, service provider and installer to clarify property lines, building location, system location, power sources, drainage areas, final site grading and answer general questions. 3.2 Off Loading Treatment System The E-Z Treat Re -circulation Synthetic Filter pod is injection molded polyethylene weighing about 300 pounds. Because of the relative light weight and toughness of the material, special handling is not required. Two people can easily unload the pod. If machinery is used to off load the pod or transport it to the excavated hole; nylon straps, chains or cables used to lift the pod should be in good condition and rated for at least 1000 pounds. The re -circulation pump and control will be shipped in factory sealed cardboard box, these items are not fragile but should be handled with reasonable care not dropped or thrown. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat 3.3 Excavating and Installing the Pod The first consideration when installing the E-Z Treat pod is to assure the pod is not located in a drainage area and the pod is located above the seasonal high water table, this will protect the pod from floating and prevent surface water infiltration. Excavate a hole approximately 6'W x 9'L x 4'H. Place 3/4" to 1" stone or equal to a height of 4" in the bottom of the excavation forming a level base for the pod to set, this will prevent settling of the pod and allow for leveling of the pod. Backfill the pod with clean fill soil, free of rocks and foreign material. Do not compact the fill, allow the soil to settle naturally. Once the pod is placed in the excavation adjust the pod to slope 1" toward the 4" PVC outlet this assure proper drainage. 3.4 Piping the E-Z Treat Pod Supply and Return Once the pod is placed and leveled, connect 4" PVC pipe between the outlet of the pod and the by-pass valve located in the re -circulation tank. Attach 1" PVC supply line between the 1" inlet on the pod and the re -circulation pump. 3.5 Installing the By -Pass Valve The by-pass valve is located in the re -circu- lation tank and one side is connected to the 4" PVC drain line coming from the pod and the other side is connected to the 4" PVC effluent discharge line or into the effluent pump tank. Model 600 Pod Flor 4" Outlet Weir Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat 3.6 Installing the Re -circulation Pump Connect the 1" PVC pipe between the inlet of the pod and the re -circulation pump. Always provide a quick disconnect device for removing the pump, this can be accomplished with a union, camlock coupler or pitless adapter. DO NOT install a check valve in the pump supply line this will prevent the supply line to the pod spray manifold from draining and may cause freezing. To ensure complete drainage of the spray manifold drill an 1/8" hole in the PVC pump supply pipe just above the discharge end of the pump. 3.7 Setting Pump Control Floats (see page 6) The control panel will come with three liquid level floats: 1. Low Level Alarm Float protects the pump from run dry damage by turning off the pump and sound an audible and visual alarm. Set float to activate if the effluent level drops to 4" above the pump intake. 2. Timer Enable Float activates the pump run time and assures the pump only runs when there is sufficient effluent in the re -circulation tank. Set float to activate when effluent level in the recirculation tank is filled to 50%. 3. High Level Alarm Float will sound an audible and visual alarm when the effluent in the re -circulation tank is too high. Set float to activate when the effluent level in the in the re- circulation tank is level with the top of the by-pass valve. Float Settings 60% '­Y Liquid Level Wide Angle Float Low Level Alarm Float 4" above pump inlet 1/8" Hole High Level Float Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat 4.0 Start-up Septic Tank and Re -circulation Tank The septic and re -circulation tank shall be inspected prior to start up to: 1. Verify the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks. The sys- tem must remain watertight to perform properly. 2. Inspect the outlet effluent filter installation to insure it is installed in accordance with the effluent filter manufacturer's specifi- cations. 3. Inspect the liquid level in the recirculation tank, the liquid should be sufficient to activate the Timer Enable Float. 4. Inspect the location of the float controls. They should be securely attached to the float bracket, free to float without obstructions and the location of the floats should correspond with the float diagram on page 10. Power Supply 1. Verify the main power supply to the re- circulation panel has properly sized breakers, the proper voltage and is installed in protection water tight conduit. 2. Check the voltage and motor amp draw. If the readings are beyond the limits speci- fied on the pump have an electrician check the main service line feeding the system control panel. By -Pass Valve 1. Verify the main power supply to the re- circulation panel has properly sized breakers, the proper voltage and is installed in protection water tight conduit. 2. Check the voltage and motor amp draw. If the readings are beyond the limits specified on the pump have an electrician check the main service line feeding the system control panel. Flush the Spray Manifold 1. At initial system start-up, remove the end caps from the spray manifold. Operate the re -circulation pump by turning the pump control to the "HAND -ON" position. Let the pump run for one minute then turn the pump control to the "OFF" position repeat this procedure three times to flush any construction debris such as dirt or pipe shavings from the spray manifold. Replace the end caps hand tight —do not use wrenches or pliers. Re -set the pump con- trol selector switch to the "AUTO" position. 2. Using the ball valve located in the manifold supply line adjust the manifold pressure to 20 to 25 PSI. 3. Observe the system as it re -circulates. Visually verify all liquids flows freely through the system. Setting the Re -circulation Pump Control 1. Check the functions of the E-Z Treat Re -circulating Synthetic Filter control panel. Control: Main Control "ON/OFF" switch Function: Turns power ON or OFF Control: System Setting Switch "MANUAL ON" and "AUTO ON" Function: "MANUAL ON" overrides all float switches and time clock switches. "AUTO ON" allows for normal operations dictated by the time clock and float switches. Control: Timer "MINUTES ON" and "MINUTES OFF" Function: Controls run time of re -circulation pump i.e. GPD re -circulated through media Control: High and Low WaterAlarm "ALARM ON", "ALARM AUTO" and "ALARM SILENCE" Function: "ALARM ON" will manually turn on the audio/visual alarms. "ALARM AUTO" is the normal operational setting and "ALARM SILENCE" turns off the alarms. 2. Check re -circulation pump. Place the system in the manual mode by turning the re -circu- lation pump switch to "ON': The re -circula- tion pump should begin to supply effluent to the spray nozzles in the treatment pod. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Control Panel/Pumps/Alarms 1. Place the system in the normal operating mode by turning the re -circulation pump switch to "AUTO". Verify the timer ON/OFF set the ON/OFF time to match Table 5 below. 2. Verify the accuracy of the system ON/OFF Timer. To accomplish this use a stop watch and verify the length of time the re -circulation pump is OFF then verify the time the re -circulation pump is ON. Those times should match the ON/OFF Timer settings in the control panel. 3. Confirm the operation of the visual and audible "HIGH" and "LOW" water alarms. The control has an alarm switch clearly marked Alarm "ON", Alarm "AUTO" and Alarm "SILENCE". Place the Alarm Switch in the "ON" position, you will hear a loud buzzer and see a red flashing light. Move the switch to the Alarm" SILENCE" position the red light and buzzer will go dormant. Once the alarms have been triggered return all settings to their original position of Alarm "AUTO" Table 5 Timer Settings 4. Verify the floats are operational by manually raising and lowering the floats to simulate the systems normal operation. Verify proper operation of "High Level Float" by lifting the float while the system timer is in the "OFF" time mode, the re -circulation pump should turn on over riding the "OFF" timer, the Visual and Audible alarms should activate. Return the float to its normal position the re -circulation pump will turn off. Reset the alarms and manually lower the "Low Water Float" with timer in the "ON" mode, the re -circulation pump will turn off and the visual/audible alarms will activate. Return the float to the normal position and the re -circulation pump will run. Reset the Alarms. 5. Verify all control breakers are in the "ON" position and all control switches are in the "AUTO" position before closing and securing the system. 300 750 300 2.5 24 2.5 39 400 750 400 2.5 20 2.5 28 500 900 500 2.5 16 2.5 22 600 900 600 2.5 14 2.5 18 700 1000 700 2.5 21 2.5 15 800 1000 800 2.5 18 2.5 13 900 1500 900 2.5 15 2.5 11 1000 1500 1000 2.5 13 2.5 9 1100 1500 1100 2.5 12 2.5 8 1200 2000 1200 2.5 10 2.5 7.5 Note: Tank sizing are noL exact and may vary (+or-10'/0) based on availabili Ly of locally produced Lanks. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Appendix 4 High Strength Waste Case Study Below are the test results of E-Z Treat Re -Circulating Synthetic Filter system in a high strength waste application. This was a repair of a failed High Strength Aerobic Treatment Unit at a restaurant. The effluent from the ATU plugged the drip field and the tubing had to be replaced. The health department required the effluent to achieve residential strength quality before dispersal to the subsurface drip tubing. The solution was to install two Model 1200 pods. The state required monthly testing the first six months and annual testing thereafter. The average 1 daily flow is 1,500 GPD. The system has been operation since 2009 and the media has not been replaced or cleaned. Table 6 BOD Loading vParameter Effluent, Avg (D Daily Flow 1,500 fA Influent BOD loading 1900 mg/I (pInfluent BOD mass load 24 Ibs/day 3 BOD mass load per pod 12 Ibs/day 0 C (D Ol 3 fA e* Ol Ol r+ O 3 sv Table 7 Commercial Test Results (sample restaurant) Intluert sarnple location: First septic tank outlet Effluent sample location. E-Z Treat outfall Note: System repairs completed by 7/9/2009 Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Recirculation Pump STA-RITEO ST,E,P Plus Series 4" high -head multi -stage submersible effluent pumps The STEP Plus 4" submersible filtered effluent pumps in 10, 20, 30 and 50 GPM models offer dependable performance and value for high pressure filtered effluent applications. These STEP Plus pumps will handle "dry run" conditions. The 10, 20,30 and 50 GPM are industry standard 3-3/4" in diameter. Filtered Effluent... for residential, commercial, and agricultural use. Shell - Stainless steel Discharge - 10, 20 and 30 GPM models: fiberglass -reinforced thermaplastic; 50 GPM models: stainless steel Discharge Bearing - Nylatron' Impellers- Engineered composite Diffusers- Engineered composite Suction Caps - Engineered composite with stainless steel wear ring Thrust Pads - Proprietary spec. Shaft and coupling - Stainless steel 300 grade Intake- Engineered composite Intake Screen - Polypropylene S = Jacketed Cord - 600 Volt "SOOW" c Pus or 300 Volt "SJOW" jacketed 10' leads (2-wire with ground); optional 20', 30', 50' and 100' lengths available In order to provide the best products passible, specifications are subject to change. Proven -Floating Impeller" Staging System - Incorporates 1st -in -class performance, sand handling and thrust management staging system with the industry exclusive "dry -run" design element. Reinforced engineered composites and stainless steel, offering high resistance to corrosion and abrasion. Discharge - Tested -tough, fiberglass - reinforced thermoplastic, with proven internal check valve. Large wrench flats and rape hale. Shell - Stainless steel pump shell offers high corrosion resistance. Shaft - Hexagonal 3/8", 300-grade stainless steel pump shaft; offers generous impeller drive surfaces. Shaft Bearing - Exclusive self- lubricating Nylatron hearing resists wear surface from sand. Motor Bracket - Tested -tough, fiberglass - reinforced thermoplastic; incorporates an integral suction screen. 0 PENTAIR S11411WS Recirculation Pump STA-RITE 0 ST.E.P Plus Series 4" high -head multi -stage submersible effluent pumps ORDERING INFORMATION CATALOG NUMBER HP STAGES MAX. LOAD AMPS VOLTS PHASE/ CYCLES CORD LENGTH STEP10 1/2 7 12.0 115 1/60 10' STEP10X100FT-05121 1/2 7 12.0 115 1/60 100' STEP10X30FT 1/2 7 12.0 115 1/60 30' STEP10X50FT 1/2 7 12.0 115 1/60 50' STEP20 1/2 5 12.0 115 1/60 10' STEP20X100FT-05121 1/2 5 12.0 115 1/60 100' STEP20X30FT 1/2 5 12.0 115 1/60 30' STEP20X50FT 1/2 5 12.0 115 1/60 50' STEP30-05121 1/2 3 9.5 115 1/60 10' STEP30X100FT-05121 1/2 3 3 12.0 115 1/60 100' STEP30X30FT-05121 1/2 12.0 115 1/60 30' STEP30X50FT-05121 1/2 3 12.0 115 1/60 50' STEP30-05221 1/2 3 4.7 230 1/60 10' STEP30X100FT-05221 1/2 3 4.7 230 1/60 100' STEP30X30FT-05221 1/2 3 4.7 230 1/60 30' STEP30X50FT-05221 1/2 3 4.7 230 1/60 50' STEP30-10221 1 5 9.1 230 1/60 10' STEP30X100FT-10221 1 5 9.1 230 1/60 100' STEP30X30FT-10221 1 5 9.1 230 1/60 30' STEP30X50FT-10221 1 5 9.1 230 1/60 50' STEP30-15221 1-1/2 6 11.0 230 1/60 10' STEP30X100FT-15221 1-1/2 6 11.0 230 1/60 100' STEP30X30FT-15221 1-1/2 6 11.0 230 1/60 30' STEP30X50FT-15221 1-1/2 6 11.0 230 1/60 50' STEP50-10221 1 3 9.1 230 1/60 10' STEP50X100FT-10221 1 3 9.1 230 1/60 100' STEP50X30FT-10221 1 3 9.1 230 1/60 30' STEP50X50FT-10221 1 3 9.1 230 1/60 50' STEP50-15221 1-1/2 4 11.0 230 1/60 10' STEP50X100FT-15221 1-1/2 4 11.0 230 1/60 100' STEP50X30FT-15221 1-1/2 4 11.0 230 1/60 30' STEP50X50FT-15221 1-1/2 4 11.0 230 1/60 50' NOTE: Cord Length shall be determined by site condition 511411WS Recirculation Pump STA RITE ST. E . P Plus Series NOTE: Please see pump curve provided by E-Z Treat 4" high -head multi -stage submersible effluent pumps CAPACITY GALLONS PER MINUTE CAPACITY GALLONS PER MINUTE CAPACITY LITERS PER MINUTE CAPACITY LITERS PER MINUTE 0 25 50 75 100 125 150 175 0 50 100 150 200 250 1 I I I I I I I I I I I I I. 225 120 200 175 r 150 W W LL ? 125 Q W = 100 J H O0 75 50 25 0 10 20 30 40 CAPACITY GALLONS PER MINUTE .60 100 .50 w F 80 40 W LL Z Z � p LQ 60 -30 W = 2 J J F ~O 40 -20 ~ -10 i 0 50 20 'SA 7 10 20 30 40 50 60 70 80 CAPACITY GALLONS PER MINUTE 35 30 25 ac W F W 20 Z W 15 = J H O H 10 5 INNIMMI` ON. • . • No�.1. MEN -m, -- . _ N:= �� " - WI N= 3 511411WS Recirculation Pump STA-RITEO ST,E,P Plus Series 4" high -head multi -stage submersible effluent pumps 1-1/4" NPT DISCHARGE 2" NPT DISCHARGE (50 GPM ONLY) 10 GPM, 112 HP = 13" 20 GPM, 112 HP = 13-1/4" 30 GPM, 1/2 HP = 11-1/2" 30 GPM, 1 HP = 14" 30 GPM, 1-1/2 HP = 15-1/4" 50 GPM, 1 HP = 13-1/4" 50 GPM, 1-1/2 HP = 15-1/4" 10 GPM, 1/2 HP = 21-1/2" 20 GPM, 1/2 HP = 22-1/4" 30 GPM, 1/2 HP = 22-1/2" 30 GPM, 1 HP = 27-1/2" 30 GPM, 1-1/2 HP = 30-1/4" 50 GPM, 1 HP = 26-3/4" 50 GPM, 1-1/2 HP = 30-1/4" icketed Cord 10, landard) 50', 100' ptional) Dimensions (in inches) are for estimating purposes only. 293WRIGHTSTREET,DELAVAN,W153115 WWW.STA-RITE.COM PH:888-782-7483 ORDERS FAX.800-426-9446 PENTAIR Because we are �Dntinuousfy improving our praducts and services, Pentair reserves the right to change specifications withaut prior nDtIC . S11411WS (09/10/14) 225 2-7-'� �- 150 LU LLI LL 125 G LLI = 1W J Q 0 % 0 25 Recirculation Pump E-Z Treat Mod.#600 20PSI @ Spray Manifold or 46 Ft Head @20 PSI Flow Per Spray Nozzle 1.7 GPM 8 Nozzles Per Mod.#600 Total Flow Required 13.6 GPM CAPACITY LITERS PER MINUTE 50 75 1 r„V 12- 150 175 mom �Mmmm MM MEMO 0 WRh!,,h,h=q6 EW V�4 0 0 MM 0 mmmm 'Lit 0 10 20 30 40 5(; CAPACITY GALLONS PER MINUTE -60 - 50 sTA-RITE' ST. E. P PLus series 4" high -head multi -stage submersible effluent pumps The STEP Plush" submersible filtered effluent pumps in 10, 20, 30 and 50 GPM models offer dependable performance and value for high pressure €filtered effluent applications. These STEP Plus pumps will handle -dry run- conditions. The i4GJ4 and 50 GPM are industry standard 3-314" in diameter. Filtered Effluent... for residential, =rnmeimal_ and agricultural use. Shell - Stainless sie¢t Discharge - 10, 20 and 30 GPM models- fiberglass -reinforced thermoplastic; 50 GPM models: stainless steel Discharge Bearing- Nylatron° Impellers- Engineered composite Diffusers- Engineered cam posite Suction Caps- Engineered campvsile with stainless steel wear ring Thrust Pads- Proprietary spec. Shaft and coupling- Stainless steel 300 grade Intake - Engineered composite Intake Screen - Polypropylene ® Jacketed Card - QUO Yolk _SOOW" c us or3DOYolt'S3OW" jacketed 10' leads [2-wire with ground]; option2120', 30', 50' and 100' iengths available Proven "Floating Impeller" Staging System- Incorporates 1st -in -class performance, sand handling and thrust management staging system with the industry exclusive 'dry -run` design element. Reinforced engineered composites and stainless steel, offering high resistance to corrosion and abrasion. Discharge - Tested -tough, fiberglass - reinforced thermoplastic, wits, proven internal check valve. Large wrench Flats and rape hole_ Shell- Stainless steel pump shell offers high corrosion resistance_ Shaft- Hex ago naIA", 300-grade stainless steel pump shaft; offers generous impeller drive surfaces. Shaft Bearing - Exclusive self- lubricating Ny[at ron hearing resists wear surface from sand. Motor Bracket - Tested -tough, f i berglass- reinforced thermoplastic; incorporates an integral suction screen_ STA-RITE' ST. E.P Plus Series T" h'r,h-head multi -stage submersible effluent pumps STEP20X100FT-05121 112 5 12.0 115 1160 100' STEP2OXXFT 112 5 12.0 115 1160 30' STEP20X50FT 112 5 12.0 1155 1160 50' STEP30-05121 112 3 9.5 115 1160 10' STEP30X100FT-05121 112 3 12.0 115 1160 100' STEP30X30FT-05121 112 3 12.0 115 1160 30' STEP30X50FT-05121 112 3 12.0 115 1160 50' STEP30-05221 112 3 4.7 230 1160 10' STEP30X 100FT-05221 112 3 4.7 230 1160 100' STEP30X30FT--05221 112 3 4.7 230 1160 30' STEP30X50FT-05221 112 3 4.7 234 1160 50' STEP30-102P1 1 5 9.1 230 1160 10' STEP30X100FT-10221 1 5 7.1 2311 1160 100' STEP30X30FT-10221 1 5 9.1 230 1160 30' STEP30X50FT-10221 1 5 9.1 230 1160 50' STEP30-15221 1-112 6 11.0 230 1160 13' STEP30X100FT-15221 1-112 6 11.0 236 1160 100, STEP30X30FT-15221 1-112 6 11.0 230 1160 30' 5TEP30X50FT-15221 1-`:.?= 6 11.0 230 1160 50' STEP50-10221 1 3 9.1 234 1160 10' STEP50X100FT-10221 1 3 M 236 1160 100' STEP50X30FT-10221 1 3 M 230 1160 30- STEP50X50FT-10221 1 3 M 230 1160 50' STEP50-15221 1-112 4 11.0 230 1160 10- STEP50X100FT-15221 1-i12 4 11.0 230 1160 100' STEP5CMUFT-15221 1-112 4 11.0 230 1160 30' STEP50X50FT-15221 1-112 11.0 2311 1160 50' STA-RITE 0ST.E.P Plus Series 4" high -head multi -stage submersible effluent p,_jir.ps C,AW CUY LITERS PER MINUTE CAPACfTY UTERS PER MINUTE 25 m 75 100 B LS 'sJ 15 'Ci 3w 250 30 300 BID 2510 60 � r 200 w = e 150 40 = 2 J F 100 20 CAPACITY GALLONS PER MINUTE 10 eD 30 CAPACITY GALLONS PER MINUTE k H E } 00 Y 14 .i it .! 11 0 0 d"o OR rt -----` -- 1f x ------LNmm- 1 4 �mmmmmmm"m • -------w wm h ----mm--mm 0 1a 20 3c 40 CAPACM SALLONS PER MINUTE 35 sa 25 24 � 1s 1a - a gp 0 10 20 90 40 Sc 60 70 BC -CAPACITY GALLONS PER MINUTE 96 u J W LLI Q_ W 6: Cl ar- � LLI z r i' W Ix a' uLLJ W W I 0 u.w J LL. w I= �# CL C� C FPWI M C 4 Lij ly LL 0 w [n LU lil J LU rr55 05 k3 V} 1 v� W_ Lu ` W a ZD 4 yco 3 = J + LL 0 � f ti* s _„_ tl W LL, 4'J U i 7 K t L.n MINI - C L I KO Sensor: Rain This sensor halts scheduled irrigation when it detects a preset level of rain has fallen to stop water waste. KEY BENEFITS • Shuts off sprinkler system automatically when it rains • Adjustable from 'Is" to 3/4" of rainfall • Debris tolerant for reliable operation �c • Mountable to gutters using (P/N SGM) • Stainless steel guard with Mini-Clik sensor for commercial applications (P/N SG -MC) • Compatible with most irrigation controllers MINI-CLIK SG -MC OPERATING SPECIFICATIONS Height:2" Stainless steel sensor guard Length: 6" enclosure for Mini-Clik • Switch rating (24 VAC): 5 A (includes Mini-Clik) • Includes 25' of 20 AWG sheathed, two -conductor, UL-approved wire Height:5v2" • Approvals: UL, cUL, FCC, CE, RCM Length:3" Width: 4" • Warranty period: 5 years look R 4& MINI-CLIK SGM Optional gutter mount Model Description Height:'h" MINI-CLIK Wired rain sensor Length:3" MINI-CLIK-NO Wired rain sensor with normally open switch SG -MC Stainless steel sensor guard with Mini-Clik sensor SGM Optional gutter mount MINI-CLIK INSTALLATION I Visit hunterindustries.com RESIDENTIAL& COMMERCIAL IRRIGATION Built on Innovation' 135 Badger Meter Model LP-5/8", 5/8" x 3/4" DESCRIPTION Recordall° Disc Meters Lead -Free Bronze Alloy, Sizes 5/8", 5/8" x 3/4", 3/4" & 1" NSF/ANSI Standards 61 and 372 Certified Model 55-1" Model 25-5/8 , 5/8" x 3/4" The Recordall Disc Series meters meet or exceed the most recent revision of AWWA Standard C700 and are available in a lead-free bronze alloy. The meters comply with the lead-free provisions of the Safe Drinking Water Act, are certified to NSF/ANSI Standards 61 and 372 (Trade Designations: MLP-LL, M25-LL, M35-LL, M55-LL, M70-LL) and carry the NSF-61 mark on the housing All components of the lead-free bronze alloy meter (housing, measuring element, seals, and so on) comprise the certified system. Applications: For use in measurement of potable cold water in residential, commercial and industrial services where flow is in one direction only. Operation: Water flows through the meter's strainer and into the measuring chamber where it causes the disc to nutate. The disc, which moves freely, nutates on its own ball, guided by a thrust roller. A drive magnet transmits the motion of the disc to a follower magnet located within the permanently sealed register.The follower magnet is connected to the register gear train. The gear train reduces the disc nutations into volume totalization units displayed on the register or encoder face. Operating Performance: The Recordall Disc Series meters meet or exceed registration accuracy for the low flow rates (95%), normal operating flow rates (100 ± 1.5%), and maximum continuous operation flow rates as specifically stated in AWWA Standard C700. Construction: Recordall Disc meter construction, which complies with ANSI/AWWA standard C700, consists of three basic components: meter housing, measuring chamber and permanently sealed register or encoder The meter is available in a lead-free bronze alloy with externally -threaded spuds. A corrosion -resistant engineered polymer material is used for the measuring chamber. Magnetic Drive: Direct magnetic drive, through the use of high -strength magnets, provides positive, reliable and dependable register coupling for straight -reading or AMR/AMI meter reading options. Tamper -Proof Features: Unauthorized removal of the register or encoder is inhibited by the option of a tamper detection seal wire screw, TORX® tamper -resistant seal screw or the proprietary tamper -resistant keyed seal screw. Each can be installed at the meter site or at the factory. Model 35-3/4" Model 70-1" Maintenance: Badger Meter Recordall Disc Series meters are designed and manufactured to provide long-term service with minimal maintenance. When maintenance is required, it can be performed easily either at the meter installation or at any other convenient location. To simplify maintenance, the register, measuring chamber, and strainer can be replaced without removing the meter housing from the installation. No change gears are required for accuracy calibration. Interchangeability of parts among like -sized meters and meter models also minimizes spare parts inventory investment. The built-in strainer has an effective straining area of twice the inlet size. Connections: Tail pieces/Unions for installations of meters on various pipe types and sizes, including misaligned pipes, are available as an option. Meter Spud and Connection Sizes IV ing Tailpiece Model Size x Laying B Nu alnd Pipe Designation Length Bore Dia. Spud Thread Thread (NPT) 5/8" x 7-1/2" 5/8" 3/4" (5/8") 1/2" LP 5/8" x 3/4" x 7-1 /2" 5/8", 3/4" 1 " (3/4") 3/4" 5/8" x 7-1/2" 5/8"' 3/4" (5/8") 1/2" 25 5/8" x 3/4" x 7-1 /2" 5/8", 3/4" 1 " (3/4") 3/4" 3/4" x 7-1/2" 3/4" 1"(3/4") 3/4" 35 3/4" x 9" 3/4" 1"(3/4") 3/4" 3/4"x1" x 9" 3/4" 1-1/4"(1") 1" 55 V. x 10-3/4" 1" 1-1/4"(1") 1" 70 V. x 10-3/4" 1" 1-1/4"(1") 1" RDM-DS-00464-EN-03 AWWA (October 2015) Product Data Sheet Recordall® Disc Meters, Lead -Free Bronze Alloy, Sizes 5/8','5/8"x 3/4° 3/4"& 1 " SPECIFICATIONS Model LP Model 25 Model 35 Model 55 Model 70 (5/8" & 5/8" x 3/4") (5/8" & 5/8" x 3/4") (3/4") (1 ") (1 ") Typical Operating 0.5...20 gpm 0.5...25 gpm 0.75...35 gpm 1...55 gpm 1.25...70 gpm Range (0.11...4.5 m3/hr) (0.11...5.7 m3/hr) (0.17...7.9 m3/hr) (0.23 ... 12.5 m3/hr) (0.28...16 m3/hr) 0.25 gpm 0.25 gpm 0.375 gpm 0.5 gpm 0.75 gpm Low Flow (0.057 m3/hr) (0.057 m3/hr) (0.085 m3/hr) (0.11 m3/hr) (0.17 m3/hr) Min.95% Min.98.5% Min.97% Min.95% Min.95% Maximum Continuous 10 gpm 15 gpm 25 gpm 40 gpm 50 gpm Operation (2.3 m3/hr) (3.4 m3/hr) (5.7 m3/hr) (9.1 m3/hr) (11.3 m3/hr) 5/8" size: 5/8" size: Pressure Loss 2 psi @ 10 gpm 3.5 psi @ 15 gpm at Maximum (0.14 bar @ 2.3 m3/hr) (0.24 bar @ 3.4 m3/hr) 5 psi @ 25 gpm 3.4 psi @ 40 gpm 6.5 psi @ 50 gpm Continuous 5/8" x 3/4" size: 5/8" x 3/4" size: (0.37 bar @ 5.7 m3/hr) (0.23 bar @ 9.1 m3/hr) (0.45 bar @ 11.3 m3/hr) Operation 1.5 psi @ 10 gpm 2.8 psi @ 15 gpm (0.10 bar @ 2.3 m3/hr) (0.19 bar @ 3.4 m3/hr) Maximum Operating 80' F (26' C) Temperature Maximum Operating 150 psi (10 bar) Pressure Measuring Nutating disc, positive displacement Element Available in NL bronze and engineered polymer to fit spud thread bore diametersizes: Meter 5/8" size: Connections 5/8" or 5/8" ON 15 mm) 3/4" ON 20 mm) 1" ON 25 mm) 1" ON 25 mm) 3/4" ON 15 mm) 5/8" x 3/4" size: 3/4" ON 15 mm) MATERIALS Model LP (5/8" & 5/8" x 3/4") Model 25 (5/8" & 5/8" x 3/4") Model 35 (3/4") Model 55 Model 70 Meter Housing Lead-free bronze alloy Housing Bottom Plates Lead-free bronze alloy, cast iron, engineered polymer Cast iron, lead-free bronze alloy Measuring Chamber Engineered polymer Disc Engineered polymer Trim Stainless steel Strainer Engineered polymer Disc Spindle Engineered polymer Stainless steel Stainless steel Engineered polymer Stainless steel Magnet Ceramic Ceramic Ceramic Polymer bonded Ceramic Magnet5pindle Engineeredpolymer Stainless steel Stainless steel Engineered polymer Stainless steel Register Lid and Shroud Engineered polymer, bronze Page 2 RDM-DS-00464-EN-03 AWWA October 2015 Product Data Sheet DIMENSIONS Meter Size Model A Laying Length B Height Reg. C Centerline Base Width Approx. Shipping Weight 5/8"and 5/8"x 3/4"(15 mm) LP 7-1/2" 090 mm) 3.70" (94 mm) 1.26" (32 mm) 3.75" (95 mm) 3 lb (1.4 kg) 5/8" 05 mm) 25 7-1/2" (190 mm) 4-15/16" (125 mm) 1-11/16" (42 mm) 4-1/4" 008 mm) 4-1/2 lb (2 kg) 5/8" x 3/4" (15 mm) 7-1/2" (190 mm) 4-15/16" (125 mm) 1-11/16" (42 mm) 4-1/4" (108 mm) 4-1/21b (2 kg) 3/4" (20 mm) 35 7-1/2" (190 mm) 5-1/4" (133 mm) 1-5/8" (41 mm) 5" 027 mm) 5-1/2 lb (2.5 kg) 3/4" (20 mm) 9" (229 mm) 5-1/4" (133 mm) 1-5/8" (41 mm) 5" (127 mm) 5-3/4 lb (2.6 kg) 3/4" x 1" (20 mm) 9" (229 mm) 5-1/4" 033 mm) 1-5/8" (41 mm) 5" 027 mm) 6 Ib (2.7 kg) 1" (25 mm) 55 10-3/4" (273 mm) 6" 052 mm) 2-1/32" (52 mm) 6-1/4" (159 mm) 8-3/41b (3.9 kg) 1" (25 mm) 70 1 10-3/4" (273 mm) 1 6-1/2" 065 mm) 1 2-5/16" (59 mm) 7-3/4" (197 mm) 11-1/2 lb (5.2 kg) REGISTERS / ENCODERS Standard —Sweep -Hand Registration The standard register is a straight -reading, permanently sealed magnetic drive register. Dirt, moisture, tampering and lens fogging problems are eliminated. The register has a six -odometer wheel totalization display, 360' test circle with center sweep hand, and flow finder to detect leaks. Register gearing is made of self-lubricating engineered polymer, which minimizes friction and provides long life. The multi -position register simplifies meter installation and reading. The register capacity is 10,000,000 gallons (1,000,000 ft', 100,000 ml). A Model 25 register is used in the following example: 9 25 ' �('��R�ecordall" ;7 Gallons 3; 6 4 g %OE Re �.7 Cubic Feet .3- 0000�� 6 .4 ail iiii rvvv a,09 25 0 01 Record.11 -0,08 O 002 qmo 5 m3,03; 19�19�19�19�'0' ; 0,06 0,04 / \\l ii OO61 Optional —Encoders for AMR/AMI Reading Solutions Model Gallon Cubic Feet Cubic Meter LP 10 1 0.1 25 (5/8") 10 1 0.1 /0.01 25 (5/8" x 3/4") 10 1 0.1 /0.01 35 10 1 0.1 55 10 1 0.1 70 10 1 0.1 AMR/AMI solutions are available for all Recordall Disc Series meters. All reading options can be removed from the meter without disrupting water service. Badger Meter encoders provide years of reliable, accurate readings for a variety of applications and are also available pre -wired to Badger Meter approved AMR/AMI solutions. See details at www.badgermeter.com. October 2015 RDM-DS-00464-EN-03 AWWA Page 3 Recordall® Disc Meters, Lead -Free Bronze Alloy, Sizes 5/8','5/8"x 3/4° 3/4"& 1 " PRESSURE LOSS CHARTS Rate of Flow in Gallons per Minute Model LP 5/8" 0r mmmmm ��������■■��������■■ CL Model LP 5/8" x 3/4" 1 10 a 5 Model 25 5/8" 1 10 100 n r a )n An rn un 25 20 15 0 J vi d 10 N a 5 0 Page 4 RDM-DS-00464-EN-03 AWWA October 2015 Product Data Sheet PRESSURE LOSS CHARTS (CONTINUED) Rate of Flow in Gallons per Minute Model 25 5/8" x 3/4" 1 A r 4 10 'In nn rn on 100 25 20 15 o — v � N a 10 N L a 5 Model 35 3/4" 1 1 R 0 7 4 F, 25 20 0 15 j 3 � �a a" 10 a` 5 0 100 ?n 40 rn Rn Model 55 1" 1 o iD A� 0�100 25 20 15 v� �a v 10 a 5 0 October 2015 RDM-DS-00464-EN-03 AWWA Page 5 Recordall® Disc Meters, Lead -Free Bronze Alloy, Sizes 5/8','5/8"x 3/4° 3/4"& 1 " PRESSURE LOSS CHARTS (CONTINUED) Rate of Flow in Gallons per Minute Model 701" 1 10 100 25 20 L Q N 7� 0� + v v 0 a V U 5. V Q Lv U1 N 10 � v 15 Model LP 5/8" 1.0 10 Model LP 5/8" x 3/4" 1.0 10 100 100 Page 6 RDM-DS-00464-EN-03 AWWA October 2015 Product Data Sheet ACCURACY CHARTS (CONTINUED) Model 25 5/8" 1 1.0 I I � 10 100 Model 25 5/8" x 3/4" Model 35 3/4" 1 1.0 10 LU 5 y ' } 0 ai a 0 a U u _ 3 u 5 v� D aai 10 15 10 100 October 2015 RDM-DS-00464-EN-03 AWWA Page 7 Recordall® Disc Meters, Lead -Free Bronze Alloy, Sizes 5/8','5/8"x 3/4° 3/4"& 1 " ACCURACY CHARTS (CONTINUED) Model 55 1" 1 1.0 10 100 Model 701" 1 �1.0 10 JOB Making Water Visible° MAKING WATERVISIBLE and RECORDALL are registered trademarks of Badger Meter, Inc. Other trademarks appearing in this document are the property of their respective entities. Due to continuous research, product improvements and enhancements, Badger Meter reserves the right to change product or system specifications without notice, except to the extent an outstanding contractual obligation exists. © 2015 Badger Meter, Inc. All rights reserved. www.badgermeter.com The Americas I Badger Meter 14545 West Brown Deer Rd I PO Box 245036 1 Milwaukee, WI 53224-9536 1800-876-3837 1414-355-0400 Mexico I Badger Meter de las Americas, S.A. de C.V. I Pedro Luis Ogaz6n N'32 I Esq. Angelina N"24 I Colonia Guadalupe Inn I CP 01050 I Mexico, DF I Mexico 1 +52-55-5662-0882 Europe, Middle East and Africa I Badger Meter Europa GmbH I Nurtinger Str 76172639 Neuffen I Germany 1 +49-7025-9208-0 Europe, Middle East Branch Office I Badger Meter Europe I PO Box 3414421 Dubai Silicon Oasis, Head Quarter Building, Wing C, Office #C209 1 Dubai / UAE 1 +971-4-371 2503 Czech Republic I Badger Meter Czech Republic s.r.o. I Maiikova 2082/26 1 621 00 Brno, Czech Republic 1 +420-5-41420411 Slovakia I Badger Meter Slovakia s.r.o. I Racianska 109/13 1 831 02 Bratislava, Slovakia 1 +421-2-4463 83 01 Asia Pacific I Badger Meter 180 Marine Parade Rd 1 21-06 Parkway Parade I Singapore 449269 1 +65-63464836 China I Badger Meter 1 7-1202 199 Hangzhong Road I Minhang District I Shanghai I China 201101 1 +86-21-5763 5412 Legacy Document Numbers: RDM-DS-00062, 63, 64, 65, 66, and 73 EnZ4�01TREAT Re -Circulating Synthetic Filter uv Installation and Maintenance Guide Note: Installation Only Maintenance is in O&M Section NSF Models bearing the NSF mark are certified Class to one or more of the following standards: NSF/ANSI 40 NSF/ANSI 245 NSF/ANSI 350 ©2017 E-Z Treat 2-2017 TABLE OF CONTENTS 1.0 UV Light System Installation 2.0 UV Light System Maintenance Appendix 1: E-Z Treat UV System Configurations Appendix 2: NSF Test Data C Ol !y e_* O� 0 C (D 1.0 UV Light System Installation The E-Z Set UV system is shipped as three components, the UV housing, the UV lamps and the UV lamp control panel 1. The PVC inlet and outlet on the dual bulb UV housing are reversible, allowing flow in either direction. The inlet of the single bulb configuration is the 4" hub and the outlet is the 2" hub. The inlet and outlet will accept any Schedule 40 or Schedule 80 PVC pipe or locally approved water tight pipe con- nection. The housing must be installed so the UV lamps are in the vertical position. 2. UV lamp control panel can be installed indoors or outdoors. The panel msut be secured in a manner that is consistent with local regulations. The UV lamp control requires a dedicated 120 volt power source that complies with local electrical codes. Z Treat UV System 3. The UV lamps should be wiped clean in accordance with the cleaning instructions and inspected for cracks or chips prior to installing the lamps into the UV housing. 4.Once the inlet and outlet connections to the UV housing are complete, insert the UV lamp assemblies into the UV housing. Caution: UV lamp housing connections should be hand -tightened. DO NOT use wrenches, pliers, or other tools to tighten. 5. Fill UV housing with water/effluent before applying power to the UV lamps. 6. Turn power "ON" to the UV system. Table 1 NSF Testing Performance Summary BOD5 2 mg/I TSS 2 mg/I DO 3.3 mg/I Turbidity 2 NTU E. coli 2 MPN/100mi pH 6.8 - 7.5 Total Nitrogen Reduction 64% *with optional UV disinfection Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Appendix 1 E-Z Treat UV System Configurations .-4"RISER PIPE TO GRADE 4" OUTLET 4" INLET NON -CORROSIVE 4" WELL CAP REFLECTIVE & PROTECTIVE SLEEVE - -\ 0 0 M 17.00 UV LAMP ""�J[_�KUV LAMP 4"RISER PIPE TO GRADE 0 m LIV LAMP Model 101 Single Lamp Model 102 Dual Lamp Model 404 Two Dual Lamps in Series Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat Appendix 2 NSF Test Data Table 2 NSF Testing Pathogen Performance Testing Date Influent E. coli Effluent E. coli ' 10/21/13 980,000 < 1.1 10/23/13 687,000 < 1.0 10/25/13 1,610,000 < 1.1 10/28/13 5,840,000 < 1.1 10/30/13 1,720,000 < 1.0 1111113 816,000 < 1.0 1114113 435,000 < 1.0 1116113 816,000 < 1.0 1118113 921,000 < 1.0 11/11113 816,000 < 1.1 11/13/13 770,000 < 1.0 11/15/13 579,000 < 1.0 11 /18/13 1,990,000 3.1 11 /20/13 1,050,000 1.0 11 /22/13 1,550,000 1.0 11/25/13 770,000 < 1.1 11/26/13 411,000 < 1.0 11/27/13 613,000 < 1.0 1212113 461,000 < 1.0 1214113 1,300,000 < 1.0 12/11/13 411,000 < 1.0 12/13/13 517,000 < 1.0 12/16/13 687,000 < 1.1 12/18/13 387,000 < 1.0 12/20/13 548,000 1.0 12/23/13 579,000 < 1.0 12/27/13 517,000 < 1.0 12/30/13 387,000 < 1.0 111114 260,000 < 1.0 113114 1,200,000 < 1.0 116114 127,000 < 1.0 118114 387,000 < 1.0 1/10/14 156,000 < 1.0 1/13/14 345,000 1.0 1/15/14 210,000 2.0 1/17/14 102,000 < 1.0 1/20/14 62,700 < 1.0 1/22/14 158,000 < 1.0 1/24/14 81,600 < 1.0 1/27/14 161,000 < 1.0 1/29/14 326,000 < 1.0 1/31/14 866,000 < 1.0 213114 4,880,000 < 1.0 215114 461,000 4.1 2/10/14 397,000 < 1.0 2/12/14 461,000 < 1.0 2/14/14 411,000 < 1.0 Table 3 NSF Testing Pathogen Performance Summary Date Influent E. coli Effluent E. coli Median 517,000 1.0 Min 62,700 _ 1.0 Max 5,840,000 4.1 Avg 834,474 1.0 Std Dev 1,066,222 1.0 Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat APPENDICES Product Specifications 'Product specifications and other technical information throughout provided by Geoflow, Inc. (except for controllers). Spin -Clean Filters Description The filters are placed between the pump and dripfield to screen out any debris. The Spin -Clean type filter is most commonly used with E-Z Set Drip systems. (Other filters are available). Body — Two-piece threaded housing with O-ring seal. Molded from high heat ABS and chemical resistant glass reinforced plastic. Screen - Sintered stainless steel. Sintering is a process in which three pieces of stainless steel mesh are transformed into one; a perforated plate, 30m then 150 mesh. Screen collars molded from vinyl for long life and durability. Spin Plate - Directional spin plate is molded of PVC or fiberglass. Vortex Spin Action - Incoming water is forced through a directional nozzle plate onto the inside of the stainless steel screen. A centrifugal motion starts inside the screen chamber, throwing particles outward against the screen. Gravity, moves the debris down the screen wall to the 3/4" flush outlet at the base of the filter. To stay clean, the filter flush valve must be partially to fully open allowing debris to flush away. This can be done with continuous or automatic flushing. Item Number Size (MPT) Max. Flow (GPM) Max. Pressure Width Height Size of flush port Area of filtration (sq. inches AP4E-1 1" 15gpm 80 psi 6" 7" 3/" MPT 23.4 AP4E-1.5 1.5" 45gpm 100 psi 12" 15.5" 3/" MPT 60.8 AP4E-2 2.0" 70gpm 80 psi 1211 16" 3/" MPT 60.8 Note: Filters can be used in parallel to deliver higher flow rates and/or decrease pressure loss through the filters. Specifications: 1" Filter: The Y filter body shall be molded from glass reinforced engineering grade black plastic with a 1 inch male pipe thread (MIPT) inlet and outlet. The two piece body shall be capable of being serviced by untwisting and shall include an O-ring seal. An additional 3/4 inch MIPT outlet shall be capable of periodic flushing. The 150 mesh filter screen is all stainless steel, providing a 28.4 square inch filtration area. The screen collar shall be molded from vinyl. The V filter shall be E-Z Set Drip Spin -Clean filter model number AP4E-1. December 2008 1.5" Filter: The Y filter body shall be molded from glass reinforced engineering grade black plastic with a 1.5 inch male pipe thread (MIPT) inlet and outlet. The two piece body shall be capable of being serviced by unscrewing and shall include an O-ring seal. An additional 3/4" MIPT outlet shall be capable of periodic flushing. The 150 mesh filter screen is all stainless, providing a 60.8 square inch filtration area. The outer support shell shall be woven stainless steel wire, and the inner screen shall be made of stainless steel cloth. The inner and outer screens shall be soldered together. The screen collar shall be molded from vinyl. The 1 '/" filter shall be E-Z Set Drip Spin -Clean filter model number AP4E-1.5. 2" Filter: The Y filter body shall be molded from glass reinforced engineering grade black plastic with a 2 inch male pipe thread (MIPT) inlet and outlet. The two piece body shall be capable of being serviced by unscrewing and shall include an O-ring seal. An additional 3/4" MIPT outlet shall be capable of periodic flushing. The 150 mesh filter screen is all stainless, providing a 60.8 square inch filtration area. The outer support shell shall be woven stainless steel wire, and the inner screen shall be made of stainless steel cloth. The inner and outer screens shall be soldered together. The screen collar shall be molded from vinyl. The 2" filter shall be E-Z Set Drip Spin -Clean filter model number ANE-2. December 2008 3/4" Vortex Filter 16 71 „12 w ?� Q v � H � 4 0 1 2 3 4 5 6 7 8 9 10 11 12 Flow -GPM 1 Vortex Filter 20 18 16 ti y �14 w ;12 Ca �10 N F�8 6 4 A 5 10 15 20 Flow- GP11 1.5" Vortex Filter 12 10 8 �f v 6 4 2 0 10 20 30 40 5 0 Flow- (=Pb1 2" Vortex Filter 8 6 p s 4 J :• q 2 10 20 30 40 50 60 10 80 90 Flow- GP NI Pressure loss charts for Spin -Clean filters December 2008 1/2 Gallon Pressure Compensating Dripline Standard products: WFPC16-2-24 E-Z Set Drip PC 24"/.53gph WFPC16-2-18 E-Z Set Drip PC 18"/.53gph WFPC16-2-12 E-Z Set Drip PC 12"/.53gph WFPC16-2-6 E-Z Set Drip PC 6"/.53gph (Alternative spacing, flow rates and diameters available upon request) E-Z Set Drip PC Specification: A. Dripline shall be nominal sized one-half inch linear low density polyethylene E-Z Set Drip model WFPC16-2-24 (or-18;-12; -6) by E-Z Set Dip. Dripline shall have turbulent flow drip emitters regularly spaced on 24" (or 18"; 12", 6") centers, bonded to the inside wall, capable of a nominal discharge rate of .53gph under pressure conditions of 7-60psi. All emitters shall be molded from virgin polyethylene resin. The pressure compensating emitters shall incorporate a silicone rubber diaphragm. The dripline shall have and outside diameter (O.D.) of approximately 0.64 inches and an inside diameter (I.D.) of approximately 0.55 inches. B. The dripline shall be equipped with an anti -bacterial inside lining to prevent bacteria from growing within the dripline. The anti -bacterial shall be Ultra -Fresh TM DM-50. The dripline shall consist of three layers; the inside layer shall contain bactericide protection, the middle layer shall be black and the outside layer shall be purple striped for easy identification. C. The dripline shall be protected from root intrusion through the use of nano-ROOTGUARDO. The drip emitters shall be impregnated with TreflanO to inhibit root intrusion for a minimum period of fifteen years and shall be guaranteed by the manufacturer to inhibit root intrusion for this period. Flow Rate vs. Pressure Pressure Head All WASTEFLOW PC 1/2gph dripline 7-60 psi 16 —139 ft. 0.53 gph Maximum Length of Run vs. Pressure Allows a minimum of 10 psi in the line. Recommended operating ressure 10-45 psi Pressure Psi ft. Emitter Spacing 6" 12" 18" 24" 10 psi 23.10 ft 15 psi 34.65 ft. 174' 260' 321' 20 psi 46.20 ft. 120' 229' 330' 424' 25 psi 57.75 ft. 260' 377' 478' 30 psi 69.30 ft. 150' 288' 415' 535' 35 psi 80.85 ft. 313' 448' 576' 40 psi 92.40 ft 172' 330' 475' 612' 45 psi 103.95 ft 354' 501' 651' 50 psi 115.5 ft. 363' 523' 675' 55 psi 127.05 ft. 377' 544' 700' 60 psi 138.6 ft. 403' 563' 727' Kd = 2.070 December 2008 Wasteflow PC 0.53 gph. Pressure Loss vs. Length of Run 60 50 a 40 0 a 30 u 20 10 0 0 100 200 300 400 500 600 700 800 Length (ft) 1 Gallon Pressure Compensating Dripline Standard products: WFPC16-4-24 E-Z Set Drip PC 24"/1.02gph WFPC16-4-18 E-Z Set Drip PC 18"/1.02gph WFPC16-4-12 E-Z Set Drip PC 12"/1.02gph WFPC16-4-6 E-Z Set Drip PC 6"/1.02gph (Alternative spacing, flow rates and diameters available upon request) E-Z Set Drip PC Specification: A. Dripline shall be nominal sized one-half inch linear low density polyethylene E-Z Set Drip model WFPC16-4-24 (or -18; -12; -6) by E-Z Set Dip. Dripline shall have turbulent flow drip emitters regularly spaced on 24" (or 18", 12", 6") centers, bonded to the inside wall, capable of a nominal discharge rate of 1.02gph under pressure conditions of 7-60psi. All emitters shall be molded from virgin polyethylene resin. The pressure compensating emitters shall incorporate a silicone rubber diaphragm. The dripline shall have and outside diameter (O.D.) of approximately 0.64 inches and an inside diameter (I.D.) of approximately 0.55 inches. B. The dripline shall be equipped with an anti -bacterial inside lining to prevent bacteria from growing within the dripline. The anti -bacterial shall be Ultra -Fresh TM DM-50. The dripline shall consist of three layers; the inside layer shall contain bactericide protection, the middle layer shall be black and the outside layer shall be purple striped for easy identification. C. The dripline shall be protected from root intrusion through the use of nano-ROOTGUARDO. The drip emitters shall be impregnated with TreflanO to inhibit root intrusion for a minimum period of fifteen years and shall be guaranteed by the manufacturer to inhibit root intrusion for this period. December 2008 Flow Rate vs. Pressure Pressure Head All WASTEFLOW PC 1 gph dripline 7-60 psi 16 —139 ft. 1.02 gph Maximum Length of Run vs. Pressure Allows a minimum of 10 psi in the line. Recommended operating pressure 10-45 psi Pressure si ft. Emitter Spacing- 6" 12" 18" 24" 10 psi 23.10 ft 50' 95' 140' 175' 15 psi 34.65 ft. 63' 115' 172' 211' 20 psi 46.20 ft. 74' 146' 210' 265' 25 psi 57.75 ft. 88' 171' 242' 315' 30 psi 69.30 ft. 94' 180' 266' 335' 35 psi 80.85 ft. 103' 199' 287' 379' 40 psi 92.40 ft 110' 211' 305' 1 385' 45 psi 103.95 ft 116' 222' 321' 429' 50 psi 115.5 ft. 232' 334' 431' 55 psi 127.05 ft. 240' 347' 449' 60 psi 138.6 ft. 1 249' 360' 465' Wasteflow PC 1.02 gph. Pressure Loss vs. Letigdi of Run 80 70 60 N 50 0 a 40 v 30 4 20 Ci 10 LL 0 0 50 100 150 200 250 300 350 400 450 500 Length (ft) Kd=2.070 I M190 December 2008 I Gallon Classic Dripline (non -pressure compensating) Standard products: WF16-4-24 E-Z Set Drip 24" WF16-4-18 E-Z Set Drip 18" WF16-4-12 E-Z Set Drip 12" WF16-4-9 E-Z Set Drip 9" (Alternative spacing, flow rates and diameters available upon request) E-Z Set Drip Classic Specification: A. Dripline shall be nominal sized one-half inch linear low density polyethylene E-Z Set Drip with turbulent flow emitters. E-Z Set Drip model WF16-4-24 (or -18; -12; -9) by E-Z Set Dip. Dripline shall have turbulent flow drip emitters regularly spaced on 24" (or 18"; 12"; 9") centers, bonded to the inside wall, capable of a nominal discharge rate of 1.Ogph at 15psi. All emitters shall be molded from virgin polyethylene resin. The dripline shall have and outside diameter (O.D.) of approximately 0.64 inches and an inside diameter (I.D.) of approximately 0.55 inches. The drip emitter flow passage shall be 0.053" x 0.053" square. B. The dripline shall be equipped with an anti -bacterial inside lining to prevent bacteria from growing within the dripline. The anti -bacterial shall be Ultra -Fresh TM DM-50. The dripline shall consist of three layers; the inside layer shall contain bactericide protection, the middle layer shall be black and the outside layer shall be purple striped for easy identification. C. The dripline shall be protected from root intrusion through the use of nano-ROOTGUARDO. The drip emitters shall be impregnated with Treflan0 to inhibit root intrusion for a minimum period of fifteen years and shall be guaranteed by the manufacturer to inhibit root intrusion for this period. Pressur Head si All WASTEFLOW Classic Dripline 10 psi 23.10 ft 0.81 gph 15 psi 34.65 ft. 1.00 gph 20 psi 46.20 ft. 1.16gph 25 psi 57.75 ft. 1.31 gph 30 psi 69.30 ft. 1.44 gph 35 psi 80.85 ft. 1.57 gph 40 psi 92.40 ft 1.68 gph 45 psi 103.95 ft t 1.80 gph Maximum Length of Run vs. Pressure Flow variation +/- 5%. Pressure Head psi ft. Emitter Spacing 2411 1811 12" 10 psi 23.10 ft 170' 165' 100' 15 psi 34.65 ft. 170' 165' 100' 20 psi 46.20 ft. 170' 165' 100' 25 psi 57.75 ft. 170' 165' 100' 30 psi 69.30 ft. 170' 165' 100' 35 psi 80.85 ft. 170' 165' 100' 40 psi 92.40 ft 170' 165' 100' 45 psi 103.95 ft 170' 165' 100' December 2008 Wasteflow Classic 1 gph. Pressure Loss vs. Length of Run s 7 a ... s c s r q v a 3 v 2 F. 1 0 0 50 100 150 200 250 300 Length (ft.) Kd=0.9 Cv<.05 I OR December 2008 Solenoid Valves Standard products: SLV-100-NC 1" Normally Closed Valve SLV-100-NO 1" Normally Open Valve SLV-150-NC 1.5" Normally Closed Valve SLV-150-NO 1.5" Normally Open Valve SLV-200-NC 2" Normaly Closed Valve SLV-200-NO 2" Normally Open Valve (Other valves are also available). Solenoid valve specification: A. The Solenoid Valve is electrically operated and used as zone valves, to flush the dripfield and Vortex filter and to "quick fill' the drip system. When used for zones and flushing it is normally closed and when used for "quick fill' it is normally open. B. The valve shall have a dual ported diaphragm. In operation, the diaphragm ports constantly flex, inhibiting sand, silt and debris from blocking the valve action. C. The porting design permits equal pressure on both sides of the diaphragm wall, regardless of line pressure when valve is not operating, and nearly equal pressure across the wall when operating. This feature prevents diaphragm "stretching", a common cause of valve failure in valves that are ported through the seat. D. The DW Valve diaphragm shall be made of nylon fabric reinforced Buna-N rubber; a grooved rib interlocks with cover and body to prevent leakage. E. Nylon exhaust orifice shall be non -corrosive and have an opening sized larger than the diaphragm ports so that any pieces of sand or silt passing through the diaphragm will not be trapped beneath the solenoid actuator. F. The solenoid shall be constructed of molded epoxy resin having no carbon steel components exposed thereby eliminating possible external corrosion and deterioration. The solenoid shall be completely waterproof, with an 0-ring seal, and comply with NEC Class II circuit requirements for 24VAC operation. G. The actuator shall be Teflon coated stainless steel and brass with a molded -in place rubber exhaust port seal; a stainless steel spring assures positive seating. H. The valve shall have a high strength plastic glass -filled body and cover designed to operate in heavy duty commercial applications. The valve shall have stainless steel cover bolts or screws for service access. I. There shall be a shock cone on diaphragm seat to eliminate water hammer in all except extreme cases. J. The valve shall have a flow control stem for throttling the valve from full open to close positions. K. The valve shall have an easy -to use, hand operated manual bleed lever control that bleeds valve to downstream; has stops for open and closed positions. L. The solenoid valves shall be model number SLV-_ _ _ - _ _ by E-Z Set Drip. December 2008 Electrical data: Wiring requires a single lead from the controller to each solenoid valve, plus a common neutral to all solenoids. (Type OF wire, UL listed, is typically used). Standard 24V ACV (50-60Hz) Current Holding 0.24A 5.76 VA Current Inrush 0.46A 11.04VA Maximum allowable loss 4.8 Volts for the 24V AC system. WIRE GAUGE RESISTANCE (OHM11000') MAXIMUM LENGTH WIRE 18 6.39 800, 16 4.02 1,275' 14 2.58 2 , 000' 12 1.62 3,200' 10 1.02 5,100' 8 0.641 8,000, 6 0.403 12, 750' 4 0.253 20,500' 2 0.158 32,500' 14 12 10 a O g w c Cn en W a 0 2 0 Solenoid Valve Flow vs pressure Chart 20 40 60 80 100 200 400 600 800 FLOW RATE - GPM December 2008 Model No. Size FPT Length Height Width Weight PSI Ran e SLV-100 1" 4.3" 4.5" 3.0" 12.5 oz 10-150 SLV-150 1.5" 6.3" 7.2" 5.0" 2.2lbs. 10-150 SLV-200 2" 9.0" 7.4" 5.4" 2.97lbs. 7-140 FPT Pressure rating ANSI: Class 125 ISO: PN 10 Max Temperature 180 degrees F December 2008 AIR VENTS 1" Air Vacuum Relief Valve Specification The air vacuum relief valve provides instant and continuous vacuum relief and non -continuous air relief. Both the body and the removable dirt cover shall be constructed of molded plastic. The body and the dirt cover shall be connected with a 3/4 inch hose thread. The ball shall be constructed of low density plastic and the internal seat shall be constructed of vinyl. The air vacuum relief valve shall seal at 5 psi. Inlet size shall be a 1 inch male pipe thread. The air vent shall be E-Z Set item number AVBK-1. Note: Maximum flow of 50 gpm per 1" air vacuum relief. PRESSURE REGULATORS ITEM NUMBER OUTLET PRESSURE FLOW RANGE MAX. INLET PRESSURES INLET SIZE OUTLET SIZE PR-20MF 20 psi 2 - 20 gpm 150 psi 1" FIPT 1" FIPT PR-20HF 20 psi 10 - 32 gpm 100 psi 1.25" FIPT 1" FIPT PR-20XF 20 psi 20-90 gpm 90 psi 3" I.D. socket 3" I.D. socket PR-30MF 30 psi 2-20 gpm 150 psi 1" FIPT 1" FIPT PR-30HF 30 psi 10-32 gpm 100 psi 1.25" FIPT 1" FIPT PR-30XF 30 psi 20-90 gpm 100 psi 3" I.D. socket 3" I.D. socket PR-40MF 40 psi 2-20 pgm 150 psi 1" FIPT 1" FIPT PR-40HF 40 psi 10-32 gpm 100 psi 1.25" FIPT 1" FIPT PR-40XF 40 psi 20-90 gpm 125 psi 3" I.D. socket 3" I.D. socket PR-50MF 50 psi 2 - 20 gpm 150 psi 1" FIPT 1" FIPT PR-50HF 50 psi 10 - 32 gpm 100 psi 1.25" FIPT 1" FIPT PR-50XF 50 psi 20-90 gpm 125 psi 3" I.D. socket 3" I.D. socket Pressure Regulator Specification Pressure regulator shall be designed to handle steady inlet pressures of psi and withstand severe water hammer extremes. It shall handle flow rates between _ and _ gpm. Flow restriction shall be negligible until the factory preset operating pressure of psi is reached. Regulating accuracy shall be within +/- 6%. Inlet size shall be . Outlet size shall be . Pressure regulator shall be constructed of high impact engineering grade thermoplastics for strength and durability. Regulation shall be accomplished by a fixed stainless steel compression spring which shall be enclosed in a chamber separate from the normal water passage. Each regulator shall be water tested for accuracy. Preset pressure regulators shall be E-Z Set model number PR - December 2008 DRIP FITTINGS Dripline Fittings The lockslip fittings shall be molded of high grade plastic. The drip tubing is pushed over a barb end, then secured with a locking nut. The fitting has the ability to be removed and reapplied with the locking nut. Lockslip Adapters. The Lockslip adapter is used to connect the dripline to a PVC fitting. The adapter glues into a 3/ inch slip fitting. The lockslip adapter shall be E-Z Set Drip part number LSLIP-600. awe 1 December 2008 b. Lockslip Couplings. The coupling is used to connect two pieces of dripline together. The lockslip coupling shall be E-Z Set Drip part number LC-600. c. Lockslip Elbows : The elbow is used to connect dripline to dripline in a 90 degree configuration. The lockslip elbow shall be E-Z Set Drip part number LEL-600. E-Z Set Drip Guidelines Dripline for Wastewater December 2008 DIAGRAM 1: TYPICAL DRIPFIELD LAYOUTSYSTEM COMPONENTS: ..................................................... 3 SYSTEMCOMPONENTS: ........................................................................................................................................ 4 1. E-Z SET DRIPLINE................................................................................................................................................4 2. CONTROLLERS......................................................................................................................................................5 3. Pumps..................................................................................................................................................................5 4. FILTERS................................................................................................................................................................5 5. SUPPLY MANIFOLD...............................................................................................................................................5 6. RETURN MANIFOLD..............................................................................................................................................5 7. PRESSURE REGULATOR.......................................................................................................................................5 8. AIR VACUUM BREAKER........................................................................................................................................6 9. FILTER FLUSH VALVES.........................................................................................................................................6 10. FIELD FLUSH VALVES.........................................................................................................................................6 11. ZONE VALVES....................................................................................................................................................6 12. QUICK FILL VALVES............................................................................................................................................6 13. HEADWORKS.....................................................................................................................................................6 DESIGN PARAMETERS...........................................................................................................................................6 1. SELECT AREA........................................................................................................................................................6 2. WATER QUALITY..................................................................................................................................................7 3. SOIL APPLICATION DESIGN..................................................................................................................................7 4. DEPTH AND SPACING...........................................................................................................................................7 5. SOIL LAYERS AND TYPES.....................................................................................................................................7 6. ADDING FILL TO THE DISPERSAL FIELD...............................................................................................................7 7. MULTIPLE ZONES.................................................................................................................................................7 8. WATER APPLICATION FORMULA..........................................................................................................................8 WORKSHEET - DISPERSAL FIELD DESIGN FOR SINGLE ZONE SYSTEM.................................................................9 WORKSHEET - SELECT PUMP............................................................................................................................... 1 1 SYSTEMINSTALLATION......................................................................................................................................12 INSTALLATION GUIDELINES.....................................................................................................................................12 InstallingLockslip fittings............................................................................................................................13 Valve Installation and Operation.................................................................................................................13 SUBSURFACE DRIP INSTALLATION METHODS.........................................................................................................14 WINTERIZATION.......................................................................................................................................................15 AS BUILT SYSTEM DESCRIPTION............................................................................................................................16 SYSTEMMAINTENANCE......................................................................................................................................18 ROUTINE AND PREVENTATIVE MAINTENANCE........................................................................................................18 HOME OWNERS GUIDE FOR CARE AND MAINTENANCE OF DRIP DISPERSAL FIELD ............................................ 19 APPENDICES - Product Specifications December 2008 Page 1 INTRODUCTION E-Z Set Drip systems disperse effluent through '/�" pressurized pipes. They are designed using the grid concept, with supply and flush manifolds at the end of each dripline, creating a closed loop system. The grid design provides a complete and even wetted area. Drip is a highly efficient method to dispose of effluent. Small, precise amounts of water are uniformly applied to the soil from multiple points. The main advantages of the E-Z Set Drip system are: • Can be used under difficult circumstances, including high water tables, tight soils, rocky terrain, steep slopes, around existing buildings, trees, or other vegetation. • The system does not require gravel. It is easy to install directly into indigenous soil and fill material. • Disposal of water is maximized by means of evapotranspiration. • Uptake of nutrients by plants is increased. • Fifteen year warranty for root intrusion, workmanship, and materials. • Non -intrusive. • Easily automated. NOTES: • These guidelines are for secondary treated effluent. • Please follow your State and local regulations for onsite wastewater dispersal. This document is intended to be a guide, and should be used only as a supplement to your local regulations. • With the exception of controllers, product specifications and technical information throughout provided by Geoflow, Inc. December 2008 Page 2 DIAGRAM 1: TYPICAL DRIPFIELD LAYOUT n from itlet December 2008 Page 3 SYSTEM COMPONENTS: See Diagram 1 on page 3. A typical drip system installation will consist of the elements listed below: (See appendices for product specifications.) 1. E-Z SET DRIPLINE The dripline disperses the effluent into the field area. The dripline is connected to the supply and return manifolds with Lockslip fittings. Typical spacing between each dripline and between drip emitters is 24" on center. The pipe has no joints that may pull apart during installation and is ideal for tractor mounted burying machines. It is sold in 500-ft rolls. Rolls of alternative length, diameter, and emitter spacing may be special ordered. Dripline features: a) NANO-ROOTGUARDO' The risk of root intrusion with an emitter slowly releasing effluent directly into the soil is well known to anyone who has observed a leaking sewer pipe. All E-Z Set drip emitters are guaranteed to be protected against root intrusion with nano-RooTGuARD. This patented process fuses the root -growth inhibitor, TREFLANOZ into each drip emitter during manufacturing. Treflan is registered with the United States EPA for this application. The nano-RooTGuARD technology slowly releases Treflan in minute quantities to prevent root cells from dividing and growing into the barrier zone. It is chemically degradable, non -systemic, and virtually insoluble in water (0.3 ppm). Nano- RooTGuARD carries a 15 year warranty against root intrusion. b) Bactericide protection E-Z Set Drip has an inner lining impregnated with a bactericide, Ultra FreshTM3 DM-50, to inhibit bacterial growth on the walls of the tubing and in the emitter. This minimizes the velocity required to flush E-Z SET Dripline. The velocity only needs to remove fine particles from the dripline; it is not necessary to scour growth off the inside wall of the tubing. When a minimum flushing velocity is requested, 0.5 feet per second is used with E-Z Set Dripline to get the settled particles at the bottom of the pipe back into suspension. (This equates to 0.375 gpm per drip lateral.) Check your local regulations for information on flushing velocity requirements. c) Turbulent Flow Path E-Z SET Drip emitters are pre -inserted in the tubing 6", 9", 12", 18", or 24" apart, with 24" being utilized most often. Angles in the emitter flow path are designed to cause turbulence in order to equalize flow between emitters and keep the emitters clean. ' Nano-ROOTGUARD is a registered trademark of A.I.Innovations 2 Treflan is a registered trademark of Dow Agro Sciences 3 Ultra -Fresh is a registered Trademark of Thomson Research Associates. December 2008 Page 4 d) E-Z SET Classic and E-Z SET PC Dripline Both Classic and PC have turbulent flow path emitters with nano- ROOTGUARD and bactericide protection. The PC has the added element of a silicone rubber diaphragm that moves up and down over the emitter outlet to equalize flow regardless of pressure between 7 and 60 psi. To _ ensure a long life, the recommended operating range is 10 to 45 psi. For Classic, the flow rate delivered by the emitter is a function of the pressure at the emitter. The Classic dripline has the advantage of no �. moving parts or rubber that may degrade over time. Also, the flow during a dosing cycle and flushing cycle are very similar with the Classic because when the flush valve is opened, the pressure is reduced, causing the flow from the emitters to decline. PC driplines require higher flow for flushing than dosing, as the emitter flow rate does not go down during the flushing cycle. 2. CONTROLLERS Controllers are used for time dosing and time flushing of the filter and dripfield. E-Z Set Drip controllers typically include a programmable logic control interface for field modifications. They can be used on systems ranging in size from one to as many zones as is needed. All controllers include a surge arrestor, elapsed time meter and counter for each pump. Custom panels are available as needed. 3. Pumps Dripfields depend on pumps to dose effluent under pressure to the field. These must be sized according to flow and pressure requirements. E-Z Set provides drip pumps for all E-Z Set drip systems. 4. FILTERS E-Z Set Drip systems use a variety of filters. Typically, a Spin -Clean screen filter is used; however; Vac- Kleen and disc filters can also be used, depending on application. 5. SUPPLY MANIFOLD This carries the water from the dosing tank to the dispersal area. Rigid PVC is usually used, and should be designed to gravity drain back to the pump tank in freezing conditions unless manifolds are buried below frost and protected from freezing. The velocity in the manifold should be between 2 feet per second and 5 feet per second (fps). Refer to PVC pipe sizing chart in the appendix to determine the best diameter for your application. 6. RETURN MANIFOLD In order to help clean the system periodically, the ends of the driplines are connected together into a common return line, most often made of rigid PVC. This line will help equalize pressures in the system. Flushing should be done frequently during the installation period. The return manifold should be installed to gravity drain back to the pump or pretreatment tank in freezing climates, unless it is buried below frost and protected from freezing. 7. PRESSURE REGULATOR Pressure regulators fix the inlet pressure at a given rate. Under normal operating conditions, pressure in most systems should be 10 psi to 45 psi. December 2008 Page 5 8. AIR VACUUM BREAKER Air vacuum breakers are installed at the high points to keep soil from being sucked into the emitters due to back siphoning or backpressure. This is an absolute necessity with underground drip systems. They are also used for proper draining of the supply and return manifolds in freezing conditions, when manifolds are designed to gravity drain back. Air vents are located in field boxes just below grade. One is used on the high end of the supply manifold and one on the high point of the return manifold. Additional air vents may be required in undulating terrain. Freezing conditions require the air vacuum breaker be protected with insulation. 9. FILTER FLUSH VALVES The filter flush valve can be manual or electronic, and is used to flush debris from the filter (When electronic, these valves are normally closed solenoid valves). If manual, it should be left cracked open slightly to flush continuously (certain States and/or filters may require automated electronic flushing). 10. FIELD FLUSH VALVES The field flush valve can be manual or electronic, and is used to flush fine particles out of the drip system (when electronic, these valves are normally closed solenoid valves). If manual, it should be opened for full flushing at least every six months and left cracked open slightly to flush continuously and/or provide for drainage of the flush line in freezing conditions (certain states may require automated electronic flushing). 11. ZONE VALVES Used to divide single dispersal fields into multiple zones, these can be hydraulically activated index valves or solenoid valves (when solenoid valves are used, they are normally closed valves). 12. QUICK FILL VALVES The quick fill valve is used to rapidly fill large zones with long lengths of run, and to equalize distribution on steep slopes. These valves are normally open solenoid valves, and are plumbed at some point between the supply and return line, depending on design (all systems will not necessarily have a quick fill valve). 13. HEADWORKS The Headworks is a pre -assembled unit including the filter, flush valves, and pressure gauge in a field box. It is installed between the pump and the field, typically below grade. The Headworks should be insulated in freezing climates. DESIGN PARAMETERS 1. SELECT AREA Select the area with careful consideration to the soil, the terrain and your State and County regulations. Be sure the field is in a good landscape position - not in a flood plain or bottom of a slope where excessive water may collect after rain. Surface water and gutters should be directed away from the proposed field area. December 2008 Page 6 2. WATER QUALITY Determine the quality of the water entering the system (it should be at least secondary effluent quality). Be aware of water conditions intrinsic to the area. If iron, manganese, or other conditions that may affect treatment or dispersal are prevalent, be sure to eliminate upstream of the wastewater treatment plant or drip system with ozone, ultraviolet or other methods. 3. SOIL APPLICATION DESIGN Refer to your State and local codes for soil absorption rates. 4. DEPTH AND SPACING Driplines are usually spaced 2 feet apart with 2 feet between emitters so that each emitter supplies a 4 sq. ft area. These lines are typically placed at depths of 6-10 inches below the surface (some states allow surface application). Closer and/or further spacing can be used based on site specific conditions. Using closer spacing of lines will not reduce the minimum size of the field area and using increased spacing of lines will not reduce the minimum number of feet of dripline required. Refer to your State and local codes for depth of bury and spacing requirements. 5. SOIL LAYERS AND TYPES The topsoil or surface soil is generally the most biologically active and permeable soil for accepting water. The topsoil also dries the fastest after a rainfall event, and will maintain the highest water absorption rate. The quality and homogeneity of the soil may present a problem. If the soil was not properly prepared and there are pieces of construction debris, rocks and non -uniform soils, it is very difficult to obtain uniform water spread. In many cases, particularly if the soil is compacted, soil properties can be greatly improved by ripping and disking (check your local regulations prior to disturbing any proposed drainfield area). 6. ADDING FILL TO THE DISPERSAL FIELD Some dispersal sites require that additional soil be brought in to increase separation distance from a restrictive layer. Placing drip lines in selected fill material above the natural soil provides an aerated zone for treatment However, dispersal still occurs in the natural soil, and the field size must be based on the hydraulic capability of the natural soil to prevent hydraulic overload. Any time fill material is to be used, the area to receive the fill should have all organic material removed or it must be incorporated into the natural soil to prevent an organic layer from forming and restricting downward water movement. The fill material should be applied in shallow layers with the first 4 to 6 inches incorporated into the natural soil to prevent an abrupt textural interface. Continue this process until all fill has been incorporated. Check your local regulations regarding the use of fill material 7. MULTIPLE ZONES Drip dispersal fields can be divided into multiple zones or subzones with solenoid valves or index valves for the following reasons: a. Steep slopes with a risk of low head drainage can be subdivided to distribute the water at system shut -down more uniformly in the field. b. Smaller zones reduce the required flow per minute which consequently reduces the size of the pump, valves, filters, supply and return lines. c. The dispersal field is located in multiple areas on the property. December 2008 Page 7 On multiple zones, a single Headworks unit can be used for filtration and flushing by placing zone valves downstream of the Headworks box. All zones would require a check valve on the individual flush lines upstream of each line joining a common flush line (to keep flush water from one zone entering any other zone during the flush cycle). 8. WATER APPLICATION FORMULA To determine the rate of application for various designs, use the following formula: Water application (inches per hour) = (231 x (emitter flow rate gph)) / ((Emitter spacing inches) x (dripline spacing inches)) Example: Dripline with 1.3 gph flow rate emitters spaced 24" apart and dripline spaced 24" apart. Water application = (231x1.3)/(24x24) = 0.52 inches of water per hour. December 2008 Page 8 WORKSHEET The following worksheet is available on an Excel spreadsheet. If you would like a copy, please phone 703-408-2916, or email mstidham(d-)ersettank.com. To calculate the area required for your drip dispersal system you must know: 1. The quantity of effluent to be disposed of (in gallons per day), and 2. The soil acceptance rate (i.e. gallons per day per square foot). WORKSHEET - DISPERSAL FIELD DESIGN FOR SINGLE ZONE SYSTEM Worksheet Formula A) Quantity of effluent to be dispersed per day Based on State regulations, gallons per day, gpd (typically GPD/bedroom x number of bedrooms). B) Hydraulic loading rate Based on soil analysis and State regulations, loading rate (gal/day/sq. ft.) (gallons per day per square foot). C) Determine the total area required Divide gpd by loading rate. (A)/(B) square ft D) Choose the spacing between each dripline and Standard spacing is 2 ft. each emitter i) ft. between driplines ii) ft. between emitters E) How many linear feet of dripline in the total (Area / 2 ) for 2ft. line spacing. (C)/2.0 or area? (Area / 1) for 1 ft. line spacing. (C)/1.0 or ft. (Area / 0.5) for 6" line spacing. (C)/0.5 F) Calculate the number of emitters (Linear ft. of dripline / 2) for 2 ft emitter spacing. emitters (E)/2 or (Linear ft. of dripline / 1) for 1 ft emitter spacing. (E)/1 or (Linear ft. of dripline /0.5) for 6" emitter spacing (E)/0.5 December 2008 Page 9 G) Choose PC or Classic dripline See appendices for dripline specifications. Classic dripline or PC dripline H) Determine dripfield pressure Standard pressure is 20 psi. psi See appendices for dripline specifications. 1) Determine feet of head required at dripfield Multiply pressure above by 2.31 to get head ft. of head required. (H) x 2.31 J) What is the flow rate per emitter? PC — either 0.53 or 1.02gph gph / emitter Classic — see flow rates in appendices. K) Determine total flow for the area Number of emitters multiplied by the emitter flow gph rate at the design pressure. Gph = (F)x(J) gpm Gpm = gph/60 L) Select pipe diameters for manifolds and sub Based on total flow from (K) above, in gpm. See mains schedule 40 friction loss charts in appendices. inches M) Select size of Headworks Based on total flow from (K) above, in gpm. See flow and head loss for each filter in appendices. Headworks N) Sketch a layout of the driplines in the See Maximum Length of Run table in appendices. dispersal plot to make sure that the maximum lateral length of each line is not exceeded. December 2008 Page 10 WVKK5Fitt I -StLhU I PUMP (I -OR PURPOSE OF ESTIMATE VNLY Worksheet O) Minimum pump capacity P) Header pipe size Q) Pressure loss in 100 ft. of pipe R) Friction head in 100 ft. of pipe S) Static head i) Height from pump to tank outlet. ii) Elevation increase or decrease T) Total static head U) Friction head i) Equivalent length of fittings ii) Distance from pump to field and back to tank. iii) Total equivalent length of pipe. iv) Total effective feet. v) Head required at dripfield vi) Head loss through filter or Headworks vii) Head loss through zone valves V) Minimum Total friction head W) Minimum Total Dynamic Head X) Minimum pump capacity NOTE: Some States and Counties require additional flow for flushing. Please check your local regulations. If you need help on flushing design, see E-Z Set Drip Excel worksheet or call E-Z Set at 703-408-2916. gpm inches psi ft. of head ft. ft. ft. ft. ft. ft. ft. ft ft ft ft ft m Formula From (K) above From (L) above Refer to PVC charts in appendices. Multiply psi from (Q) above by 2.31 Number of ft. Height changes from pump to dripfield. Add (Si) + (Sii) Estimate loss through fittings — usually inconsequential for small systems. Measure length of manifolds Add (Ui) + (Uii) (Uiii) / 100 x (R) See line (1) in Worksheet above. See pressure loss for filters in appendices or see pressure loss for Headworks box in appendices. Multiply pressure by 2.31 to get head loss. See pressure loss charts in appendices. Multiply pressure loss in psi by 2.31 to get head loss. Add (Uiv) + (Uv) + (Uvi) + (Uvii) Add (T) + (V) From line item (0) above December 2008 Page 11 SYSTEM INSTALLATION INSTALLATION GUIDELINES Handle your dripline and components with care. Nano-ROOTGUARDO is temperature sensitive. To assure a long life, store the drip line out of direct sunlight in a cool place. Check and collect all tags from dripline rolls. Verify the flow rate and model numbers match what is specified on the plan. Keep all tags in job file for future reference. a) All dripfield construction shall be done in accordance with Local rules and regulations. b) Fence/tape off entire dripfield prior to any construction. c) System is not to be installed when ground is wet or frozen. d) Divert all downspouts and surface waters away from dripfield and tanks. e) Excavation, filling and grading should have been finished before installation of the subsurface drip system. f) Be sure you have everything required for the installation before opening trenches. Pre -assemble as many sets of components as practical above ground and in a comfortable place. g) The soil should be moist but still should allow the proper operation of the installation equipment and not cause smearing in the trenches. The soil surface should be dry so that the installation equipment maintains traction. h) Install a watertight dosing tank according to E-Z Set Drip specifications. i) Determine the proper size for the supply and return manifolds. (See Worksheet line L.) j) Install the PVC supply line from the dosing tank. (Please refer to your State guidelines for depth of burial.) k) Paint a line or flag between the two remaining corners at the opposite end of field where loops and/or return trench will be located. 1) Install the dripline from the supply line trench to the painted/flagged line, as specified per design/local code. Upon reaching the painted line/flags, pull the plow out of the ground and cut the dripline V above the ground. Tape the end of the dripline to prevent debris from entering. Continue this process until the required footage of pipe is installed. Take care not to get dirt into the lines. m) Install the supply header with tees lined up at each dripline. Hook up the driplines to the supply header. (Do not glue the dripline.) n) Install the pre -assembled Headworks between the field and the pump tank on the supply line. *Insulate the box in freezing conditions. o) If using a pressure regulator, install it downstream of the Headworks at the dispersal field, on the supply line. Although the pressure regulator can be buried directly into the soil, it is preferable to install it inside a small valve box for easy access with unions on either side. *Insulate the box in freezing conditions. p) Install the floats in the dosing tank and wire to the control panel. The control panel should be programmed to pump no more than the design flow, do not set to match the treatment capacity. q) Install the pump. Fill the dosing tank with fresh water and turn on the pump. Check for flow out the ends of all of the driplines. Let the pump run for 5-10 minutes to flush out any dirt. Shut off the pump and tape the ends of the lines. r) Dig along the painted/flagged line for loops and/or return manifold. The return line must have slope back to the treatment tank or septic tank in freezing climates if it is not buried below frost and protected from freezing. If loops are formed using solid line, they must be elevated slightly above the dripline to allow for drainage in freezing climates. December 2008 Page 12 s) Install the return header and connect all of the driplines. t) Install air vacuum breakers at the highest points in the dispersal field. Use pipe dope or Teflon tape and hand tighten. u) Connect the return line back through the Headworks box. Open the field flush valve and turn on the pump to flush lines, then close the valve and check the field and all piping and connections for leaks. v) With pump still running, check the pressure at the air vacuum breaker(s). It should be between 10 to 45 PSI. (See the Worksheet line H for design pressure required on supply line.) Check the pressure in the Headworks. It should be five psi or higher. If using a manual valve for field flushing, crack it open until design pressure is reached and leave in that position. Turn off the pump. w) Check the filter for construction debris and clean. x) Set timers and counters as specified in design, and keep a record of these settings. In addition to these settings, keep a record of all of the logs in the panel at the time of start up. Record final pressure readings at startup as well. Date these records for future reference. Installing Lockslip fittings a) Hold the fitting in one hand and position the tubing with the other hand. b) Move the sleeve back, and push the tubing onto the exposed stem as far as possible. c) Push the sleeve out over the tubing and screw onto tubing, as though tightening a nut to a bolt. *Hand tighten; do not use tools. d) Test the connection to make sure the sleeve threads have gripped the tubing tightly. Valve Installation and Operation a) Wrap male adapters with Teflon tape and thread the adapters into the valve inlet and outlet just past hand tight. CAUTION: over tightening may cause damage to the valve. (Note: arrows indicate flow direction on valve.) b) Using watertight electrical fittings, connect the valve common and an individual output wire to the solenoid leads. c) Flush the laterals by opening the internal manual bleed lever on the downstream side of the solenoid. Be certain that flow control handle on top of valve is free spinning (on flow control models). d) Close the internal manual bleed after flushing the system December 2008 Page 13 SUBSURFACE DRIP INSTALLATION METHODS NOTE: Disturbing the soil may affect the pore structure of the soil and create hydraulic conductivity problems. Please consult with your soil scientist or professional engineer before making the installation technique decision. INSERTION METHOD ADVANTAGES DISADVANTAGES a) Hand Trenching* • Handles severe slopes and • Slow. confined areas. • Labor intensive. • Uniform depth. • Back fill required. b) Oscillating or • Fast in small to medium • Depth has to be monitored vibrating plow. (Use installation. closely. the type that inserts • Minimal ground disturbance. • Cannot be used on steep the dripline directly • No need to back fill the slopes. in place, not one that trench. • Requires practice to set and drags the dripline operate adequately. through the soil.) c) Trenching • Faster than hand trenching. • Slow. machine: Ground • May use the 1" blade for • Back fill required. Hog, Kwik-Trench, most installations. E-Z Trench* • Uniform depth. d) Tractor with dripline • Fast. • The installation tool is insertion tool • Minimal ground disturbance. designed specifically for this • Does not stretch drip line. purpose. (Ideally used on • Adaptable to any tractor. machine with down pressure.) December 2008 Page 14 WINTFR17oTInN Buried drip systems are not prone to frost damage because vacuum release and drain valves are provided in their design. The dripline itself is made of polyethylene, and is not susceptible to freezing. It drains through the emitters, so it will not be full of water after pumps are turned off. Please follow these precautions: a) Manifolds (supply lines and return lines) should slope back to their respective tanks. These lines need to drain rapidly. If using electronic flush valves, be sure drain valves remain open long enough for entire field to drain. If using manual filter flush valves or manual field flush valves, they should be left cracked open slightly for drainage. Alternatively, the manifolds can be located below frost depth. Under extreme conditions, return and supply manifolds must be insulated. b) If using drain back method for frost protection, either remove check valve from pump line or provide alternate method for draining this line. c) Insulate all field boxes in freezing climates. This includes Headworks, zone valve(s), pressure regulator(s) and air vacuum relief valve boxes. d) In severe freezing conditions, use heat tape or a small heater in the Headworks box. d) The top of air vacuum relief valves must be no higher than soil surface and insulated in freezing climates. e) If using a hydraulic indexing valve for zoning a system, be sure it is frost protected in freezing climates. For proper operation, always locate indexing valve at highest point in system to allow for drainage between cycles. f) The driplines will self -drain through the emitters into the soil. If the cover crop over the dripfield is not yet adequately established, add hay or straw over the field for insulation in freezing climates. g) If necessary, mark all valve boxes with a metal pin so you can find it in the winter when covered in snow. December 2008 Page 15 AS BUILT SYSTEM DESCRIPTION. 1. Site name: 2. Site address, including State: 3. Dripfield designed by: 4. Dripfield installed by: 5. Date of installation: 6. Daily design flow: gpd. 7. Soil loading rate: gpd/sq. ft. 8. What treatment system was used? Manufacturer and model number: 9. Number of zones in dripfield: If more than one zone, please describe valve (size, manufacturer, part number, type): 10. Amount of dripline installed in each zone: Zone 1 ft. Zone 2 ft. Zone 3 ft. Zone 4 ft. 11. Dripline model number Wor description: 12. Flow rate per zone: Zone 1 gpm. Zone 2 gpm. Zone 3 gpm. Zone 4 gpm. 13. Depth dripline installed below grade: inches 14. Pump manufacturer, model number and number of pumps: 15. Filter model number Wor description: If more than one zone, do the zones (a) share one filter or (b) each have their own filter? 16. Pressure in each zone: Zone 1 psi Location pressure measured: Zone 2 psi Location pressure measured: Zone 3 psi Location pressure measured: Zone 4 psi Location pressure measured: 17. Size (diameter) of feed manifold: inches. Depth of feed manifold: inches. 18. Size (diameter) of flush manifold: inches. Depth of flush manifold: inches. 19. Size of filter flush valve: inches. Is filter flush valve manual or automatic? 20. Size of field flush valve: inches. Is the field flush valve manual or automatic? If more than 1 zone, do the zones (a) share 1 flush valve or (b) does each zone have its own flush valve? 21. Was any fill material supplied on the dripfield? December 2008 Page 16 If "yes" to 21 above describe fill quality and quantity added. 22. Please provide as -built drawings, including but not limited to direction of drip lines, location of air vents, pressure regulators if applicable, Headworks (filter and valves) and pump tank. December 2008 Page 17 EZT-1CD4Z-230-16 1-4 ZONE COMBO DRIP CONTROL PANEL System Operation: This panel is designed to control the out flow of two tanks using a PLC and Touchscreen. Based off timer set points and the float switch conditions in each tank the PLC will start/stop pumps and open/close valves, or it can manually control them via the touchscreen. This controller is capable of remote access via PC or smart phone if, connected to a network with internet access. This allows the user to receive emails or text notifications of alarm conditions. The controller also logs data such as: a. Pump Run Time (ETM) «Daily & Totalized» b. Pump Starts «Daily & Totalized» c. Filter Flush Count & Time On «Daily» d. Zone Count and Time On «Daily» e. Field Flush Count & Time On «Daily» f. Secondary Timer Cycles «Daily» g. High & Low levels h. Pump Fail i. UV Lamp Fail j. Power Cycle Recirculation Tank Pump Operation: This tank has (3) float switches that will control the pump on time (dose) and off time (rest) using settings that can be easily adjusted from the touchscreen based off site topography. a. Float Switch-1 (Redundant Off & Low -Level Alarm): When lowered, this float turns off the pump. It is a secondary off float which will operate if the Timer On & Off float fails. Pumping will be disabled if in the automatic mode. This float also activates the alarm light. The alarm light will remain on until the float is lifted. b. Float Switch-2 (Normal Timer On & Off): This float activates the Normal Timer, which cycles the pump on and off based on the values in the Normal Timer Setting. The timer will control the pump cycle, beginning with the off cycle. c. Float Switch-3 (High Level Alarm): When raised, this float activates the alarm light and audible alarm. The audible alarm may be silenced by pressing the toggle switch towards SILENCE on the side of the control panel. The alarm light will remain on until the float is lowered. EZT-1CD4Z-230-16 1-4 ZONE COMBO DRIP CONTROL PANEL Drip Tank Pump and Valve Operation: This tank has (4) float switches that will control the pump on time (dose) and off time (rest) and the opening and closing of valves, using settings that can be easily adjusted from the touchscreen based off site topography. The pump dosing cycles will be controlled by the Normal Timer Float-5. If a high in -flow condition occurs the pump dosing cycle will be controlled Secondary Timer Float-6. At the beginning of each dose cycle the filter flush valve will open for 15 seconds (field adjustable). Once completed the system will then open the corresponding zone valve and begin its supply line pre - charge time of 60 seconds (field adjustable). Then complete the Normal or Secondary preset zone dose time depending on the condition of the float-6. When finished the dosing cycle the pump will run until the pump off delay is reached 10 seconds (field adjustable) the zone valve and field flush valve will remain open for 5 minutes (field adjustable) to allow for drainage. After completing 10 field flush cycle counts (field adjustable) the field flush valve will open and flush each zone 5 minutes (field adjustable). a. Float Switch-4 (Redundant Off & Low -Level Alarm): When lowered, this float turns off the pump. It is a secondary off float which will operate if the Normal Timer On & Off float fails. Pumping will be disabled if in the automatic mode. This float also activates the alarm light. The alarm light will remain on until the float is lifted. b. Float Switch-5 (Normal Timer On & Off): This float activates the Normal Timer, which cycles the pump on and off based on the values in the Normal Timer Setting. The timer will control the pump cycle, beginning with the off cycle. c. Float Switch-6 (Secondary Timer): This float activates the Secondary Timer function when lifted. The timer will cycle the pump based on the values programmed in the Secondary Timer Settings. Starting with the dose cycle first then the resting cycle. Both the "Dose" and "Rest" time may be different from those for the Normal Timer. The Secondary Timer function will remain active until the secondary timer float lowers. When the Secondary Timer function has been completed, normal timer operation will automatically resume. d. Float Switch-7 (High Level Alarm): When raised, this float activates the alarm light and audible alarm. The audible alarm may be silenced by pressing the toggle switch towards SILENCE on the side of the control panel. The alarm light will remain on until the float is lowered. HOME SCREEN: System Overview a EZT-1 CD4Z-230-16 ID E:> E:> E:> E:> 1-4 ZONE COMBO DRIP CONTROL PANEL Navigation Buttons a a a 1. Status of UV Lamp If Connected 2. Displays Remaining Rest and Dose Times 3. Indicates Current Step of The Controller If A Dose Cycle Was Activated. 4. Tank Level Animation & Float Status: Empty Circle = Float Down, Filled Circle = Float Up 5. Status of The Pump: Red = Stopped, Green = Running, Blinking Red = Fail 6. Displays Current Date & Time 7. Displays Number of Cycle Remaining Until A Field Flush Occurs 8. Yellow Color Indicates That The Next Dose Will Go To That Zone 9. Status of The Valve: Grey = Closed, Green = Open 10. Displays That Corresponding Zone Hand -Off -Auto Switch In The Touchscreen Is In The Off Position 11. Displays That Only 3 Zones Are Selected In Zone Settings EZT-1CD4Z-230-16 1-4 ZONE COMBO DRIP CONTROL PANEL Quick Start Instructions: Press: The Setup Menus button > Enter the level 2 password Press: Recirc. Pump Dose / Rest Times Button > Enter the Normal Rest and Dose times for cycling the pump in the recirculation tank. Press: Drip Pump Dose / Rest Times Button > Enter the Normal and Secondary Rest and Dose times for cycling the pump in the drip tank based off the topography of the site. Enter the delay pump off delay time (D--fault 10 Seconds). This how long the pump runs after the dose time is finished allowing valves to open for drainage. Press: Zone Settings Button: Enter how many zones are being used (afault 4). If zone flow GPM is known enter the values per corresponding zone. ➢ Press: Filter Flush Timer Button > Enter how long to flush the filter before each dose cycle. (afault 15 Seconds) ➢ Press: Supply Line Pre -charge Button > Enter how long to pre -charge the line before the dose timer activates. (afault 60 Seconds) ➢ Press: Drain Cycle Settings Button > Enter how long to drain the line after a zone dose the line before the dose timer activates. (Ee-fault 5 Mnutes) ➢ Press: Field Flush Settings Button > Enter how many cycles before a field flush is enabled (afault to cycles). Also enter how long you want the zone to be flushed (afault 5 Mnutes). ➢ Press: Alarm Timers Button > Enter the High & Low alarm on/off delays for each tank (Al 11faultedto5 Seconds). Press: More Button > Enter level 3 password in the Setup Menu if you need to disable UV Lamp Fault ➢ Press: Back Button To Go Home Press: H-O-A Button > Place Recirc. Pump, Drip Pump, Filter Flush, and Field Flush in auto mode. Press: More Button in the Hand Off Auto Control Screen > Place all zones used in auto mode. ➢ Navigate back to the Home Screen SCREENS: HAND -OFF -AUTO CONTROL MORE. RECIRC. PUMP DRIP PUMP FILTER FLUSH FIELD FLUSH BACK Recirc. Pump Cycles Mw Recirc. Pump Cycle ETM = Recirc. Tank High Rlarms MM BACK SETUP MENU RECIRC_ PUMP DRAIN CYCL DOSE I REST TIMES SETTING DRIP PUMP FIELD FLUS DOSE 1 REST TIMES SETTINGS ALARM ZONE SETTINGS71 TIMERS HOME FILTER FLUSH I EMAIL I TEXT ADDMM TIMER SUPPLY LINE NETWORK SETTINGS PRE -CHARGE TIMER DRIP PUMP DOSE I REST BACK TIMER SETTINGS II HOME NORMAL DOSE TIME HH I MM ! SS HH I MM I SS DRIP PUMP OFF -DELAY SECONDARY DOSE TIME MEE ME HHrMIM SS HH!MM/SS HAND -OFF -AUTO BACK I CONTROL ZONE-1 ZONE-2 ZONE-3 ZONES VALVE VALVE VALVE VALVE DRIP DAILY STATUS I HaME Drip Pump Cycles Drip Pump Cycle ETM = Drip Tank High Alarms Drip Secondary Timer Cycles Zone 1 Cycles KM IM ETM Min. Zone 2 Cycles Mo jo ETM Min. Zone 3 Cycles IM NM ETM Min. Zone 4 Cycles MM IM ETM Min. RECIRC. PUMP DOSE 1 REST TIMER SETTINGS NORMAL NORMAL DOSE TIME FEE; E.;PP .` BACK I ZONE SETTINGS I HI OME Enter Estimated GPM per Zone Enter Zone 1 Zone 3 Numberof Zones - 4 Zone 2 Zone 4 123.4 GPM! 123.4 GPM! BACK FILTER FLUSH TIMER HOME FILTER FLUSH Time BACK DRAIN CYCLE SETTINGS HOME DRAIN CYCLE Time Setting SIMN ALARM TIMERS BACK RECIRCULATION TANK High Alarm High Alarm On -Delay Off -Delay Low Alarm Low Alarm On -Delay Off -Delay i123 See. i123 SeCi HOME DRIP TANK High Alarm High Alarm On -Delay Off -Delay Low Alarm Low Alarm On -Delay Off -Delay i123 Sec. i123 Sec. SUPPLY LINE PRE -CHARGE TIMER H� PRE -CHARGE Time Setting I BACK FIELD FLUSH FIELD FLUSH Total Cycles Time Before Flush Setting =.I1 1.,� Remaining Cycles Until. Flush.12; HOME BACK SYSTEM HISTORY HOME HOURS HOURS Totalized Totalized Recirc- Drip Pump Pump History History RECIRCULATION TANK DRIP 7RMK PUMP & ALARM LOGS PUMP & ALARM LOGS ALARMS I FILTER & FIELD FLUSH POWER CYCLE LOGS LOGS RECIRC_ & DRIP TANK DRIP ZONE I DRIP ZONE FLOAT CYCLES LOGS GALLONS RECIRCULATION DRIP BACK PUMP & ALARM LOGS HOME BACK PUMP & ALARM LOGS HOME Date Recirc. Pump CyclesETM Hours Date Drip Pump CyclesETM Hours 12/31/20 1234 -12.34 12/31/20 1234 -12.34 BACK FILTER & FIELD FLUSH HOME LOGS Date Filter Flush Cycles Filter Flush Minutes 12/31/20 1234 1234 BACK ALARM HISTORY LIST :currence ESTIMATED GALLONS TOTA vED ZONE 1 ZONE 2 ZONE 3 ZONE 4 BACK PLC NETWORK SETTINGS PLC CPU Port 1 Network �123, j :123 ::123, : l 123 : I.P. Address: MME �Y23, j :123 : 123, : l Y27 : Subnet Mask: �123 j -Y27 j -Y23 ; ; 123 j Default Gateway: MEME Maintenance.Port: 2101 n_. Har�E HOME BACK DRIP ZONE i IOME LOGS Date Zn-1 Cycles Zn-1 Mins. Zr-2 Cycles Zn-2 Min&. 12/31/20. 1234 1234 1234 1234 I I I SACK FLOAT CYCLES HOME RECIRCULATION TANK DRIP TANK High High Leval Level Secondary Timer Timer Timer Enable Enable Off Off Float Float BACK E-MAIL 1 TEXT ADDRESSES HOM E Maximum 45 Characters E-MAIL ABCDEFGHIJKLMNOPQRSTIJVlUXY2ABCDEF ®E-MAIL ABCDEFGHIJKLMNOPQRSTJVWXYZABCDEF E-MAIL ABCDEFGHIJKLMNOPQRSTJVWXYZABCDEF E-MAIL ABCDEFGHIJKLMNOPQRSTJVWXYZABCDEF NEL IDENTIFIER BACK] ADVANCED SETTINGS HOME •� RESET RESET RBCIFC. Pump Drip Pump • Totalizer History Totalizer History SAVE i SETTINS • RESET Zona f RESET RESET RESET Zone 2 Zone 3 Zone 4 �loYd3s Gallons Gallons Gallons Gallons EZT-1 CD4Z-230-16 E:> E:> 1-4 ZONE COMBO DRIP CONTROL PANEL PASSWORD SCREEN: Level 2 ********** 1 2 3 4 5 6 7 8 9 0 BS Q W E R T Y U I 0 P CLR awl A S D F G H J K L CAN Z X C V B N M ENT a 1. Displays The User Name 2. Press Arrows To Scroll Between Users, Once You Have Selected The User Name You Want Use The Keypad To Enter In The Correct Password. 3. Lower- & Upper- Case Characters Pop-up Screen 4. Special Characters Screen Pop-up Screen 5. Level 1 Password = DRIP 6. For Level 2 Password Access Contact E-Z Treat T O w r z 00 �� � r arlo 0 a C 00 r N N CD Y Ln {y T T QJ C U u) l Ia/ O O 7 z E ate+ O �o a -2 Ln M av -�o u, v> > U n p 0 a M 2u Lq Ln N -- m w v_ 0 a u w U au W a�: L o, z 9=v 3zc " PUi ZZ'61 o Y� Nlo.o w Ln o a� iY y z a a.3 8,6 z = r ` o p. H 33 zN L� hw � e o n �_° o a- W oa � � a � w � T � � z O 0 a 07 N N Q O Ln Y {y rry m \ m m ' C O O 3 .LA > 12 im U �/ U z aC Q � a - r�s v� v Ln +, v� 0 '^ t =Ea N Q ap` I- N =- � � �vm N �m� 0 o iOo o0 00 0 = 0 zw 00 O 00 M a U u qO =aE H8EEI 68 Z8J N 6 a I£ W Q E ® - c — 6Z'ZH1 S 'Hi o 3 sF',ze a TT IEI � � 3 z c S 2H1 Z'S 0 n L � U p N o = a� iY 0 5 ,_ v�i3a t ! L _ a.3 z = � E w L 3 O ~ c z T Z�j J > a hw W3 o o 0) 0.a � 2 CD a`Woa O N a 'I~ � d 1 � � w O o ti O 0 ti O 0 ti O 0 ti� O 0 O 0 ti O� 0 ti Q� 0 ti O� 0 ti� U 0 V 0 ti� O 0 O 0 ti O� 0 ti T 0 ti� M 0 U 0 ti U 0 ti U 0 ti� U 0 O� 0 ti O� 0 ti tp 0 ti LD 0 ti Lfl 0 ti eD 0 ti� HO 0 l0 0 ti l0 0 ti N 0 ti M 0 ti M 0 ti M 0 ti� V 0 N 0 � O� 0 ti V 0 ti V 0 ti � 0 ti OJ 0 ti DJ 0 ti� DJ 0 � Z V V V F m m m Vt � W W W W 2 2 = 2 V N N V d d d m V - � � � 0 0 0 In In In In In In � � � M V M M t~n U X N N U U U U (J] m C/1 m M M [Jl m C!1 m U x d U x d � m � m U x d N �. W .-. a @ X X X X U X U X U X U X U X U X V X W W U X U X (j X (j x U X W W W LL U X U X M � N Qj (Ij aj aj a a a a a a d U d U d a rl a a - d - U X U X � m � m U X U X � m d - rL - � � � � � � 2 c O d O a O d � F F Y O O vi li rn ii rn ii rn li d d d N N N N N N N N > C Z J J _ i6 i6 i6 ifS n U U U U U U m n n m m U U m n n a a m m � � � � @ � a a a a a a a � � a a a a a � � � � in in � � � � m` m` m` m` m` m` m` m` m` fa V c_ c_ H H H H t+ U O U O U D U O U O V O V O -6 a U O U O U O U O V O -6 a U O U D -6 a V O V O U O � O D O O � a m m Iloilo m m m V1 (/] m m m m m {n (n m m @ cn @ to m m m U U U U U U m � m U m m m m N M V Ln HO I� O] U O N M V le'1 i0 I� tb U O M lit i0 I� tb U m m m N N M V gm U V U U U U J N 0 m � » x 2 / an _ ® ¥ / \ & / - _ k 3 ; o �)j lit \\\ ® ® })) VA. { A _ . «§\ I O rq / }!! U }}} N \\\ W ;gam � ;{) � :=f \\\0 Z /J( 2 e j(2 ~ \\\ )\\ ail t/{ \\\\\\ }\\\ -\\ §.a ®2/ � % � CD/ - \ \�) -p .L s = a a Y1 ai C a L Q dC C m Ln _ _ ¢ -0-0 = Ln x Xm a? Lu LL LL 3 > ai CD Ln ¢ N U N c ¢¢ a n 3 0 fu o) +' 'De I a o- N a 0 m (D t u fu Id � d 2.2 a y o z Q n N U > > C ¢o > � fI) C o N .. v v� mLL n� yr cn�-o m m` m w c E N v c u� c c c o Q) > Ln u 2' N¢ E 3 E E E E m NO a m u v u u a r r o r r r r LL X Ln m LLLn 2U1 E N U U U LL d m m r r m m r r m N r z W �u LL LL J u LLCL .a N 0) 7E C J d d w D a x Q a�i�Qo l l J l � Q J Q n� L I L I Q a✓ Z oui OUU =a I I N N Ln > C O O p LB N N F L M N M N Q z Q L!1 M V1 M N mm� r� m � Mm •' z , 16 I I I I = I I I I u�� T I I > L cn > F- m J I I a✓ M O m:tl, =�0----�J I O N O i ca. aamu I n Z3 I N c a fu 00 c� o N I LL L 'd c CU a) I N �ULi a`°iNO---------J I O i O� V)� �m I An N E m 1 I Qj v naamCj�0----—— — — — — —J N tiN N loI- z Z N C Lam,) O f6 2 Z3 N N -q aka � a) U z N N M N O 7 N i z •-i N a O=� u m U U O UN I:; � m in 0* Oa-, U \ CDm m r1 U O O n ��� C C V) a a Q i O N O cn a� � C ) � C U1 N O O O 6 cu N O - C a� U [6 C a.a � a O 7 E Ln O U +a U, C N i N U L � ..1 C- T-i C p_, U E a) , co c C a�a •� J f0 Z�-6 E Z v � O a) zrEn E-0 a o�Ew�� ICI to fn — 7 Lf, z 07-0 Q QD 1 - a-+ O n P o $� U O] ti M L!1 LL Z I- m Z Q w Q N O cn j V u Pmm 3' Ln J d d N + 3Ln a o � K x x Nam N .,gym g i M N N LL m � •.y n--r, 2 / N LL -q U > N O N Lr) m T N M z o aD ,- 4 CD a �2v U �o > N m� a ' U N Q c U M o0 9- 0 >oij N - - n N CD U > U a8 ,-� E L E N Na'E a :E w - L m o, -� � N � z 9=v LN a) (D O Q GGC U Q o v yo o= - n Z E cV z yLa � j 3 > U) O aka o - _ m U n "3 Y a� a T '_- .T ti U M c n a L_ Q Cam C v a� 9 cn __ s s Q Ln > M o L- N O N z a) N IL IL a ¢ O Y N t U Ln t U f0 `fa fO M. o fu I C C _ D Q Ln C O o u m o_ ra 3 U H o U a y .. E C�C -a d N m Ul N N N O ¢ m m +� C Ln O O Z !- Z ZNy ~ Q N C {y N o u~ o N c o o .. ? N a QU .M. i '� O rj u m rya U X Ln Ln o N ,� M Q-' N m 4 (A Y N Ezs E u a r Ln Q^ 0-1 m cC LL LL F U m U a N r LL N CL Q Ln O O m c m 'O N OLA O W z z 3 Y > 12 u o � ol U U a L cn z E -" LL N Q N L 2 O' m U FL " 2 ti .. Ln U- U ��s �� p o .; — — — /— .�. \L! Q Y N N r — N a —/ ¢ °i L n �_ F 1 1U1 LL n C� m N —N— _ ;_ 'f6a LL Q C p o m p u a o cn L - - — o E N Lj ra —— Q N 1 = -- 9 �Ln a wLn � m —/ O 0 p O o H U a 8 L — —� — Q J L ° N H U > Ln i0 z z ,� .�L� _o m �'� 1 C m m � of 6 �Ln J v N O I� U- / W .c a1pv m L ,,ti N C. m p — — — ¢ U ¢ m - O LPL ❑ m N Q N ry w m N H " °U- 1 z 9�v �av _ p 2 Ln LL N i �(7 3zc m NQ�m � —� O J v t� n N p - _ C N Q U r I I j 6 L ALL i o ry N ��z xza M Y N 7 N —/— 0 p z c c N a LL O E v 3 s u p z � L nu 3 E :E iri Y — ¢ IN w � Q � a d LV w W7c CD Ln d. QC w o3 a � 1 ! _ _! \� 7L® CL !! \ § \ o \\` / /� \ . _ _ \ \ _w u)- _0 _ J2 _ _ )�\ 0-- /\° ~ - §\ af 0— af u � � � u � § 2 0 $ 3 \�2 �)j o @ ^ e : $ -{\ \\\ _ \\> ® § })) _� cl 2 O ) f / M =2 ,I:/ 2 N )±E ^ U \2 / � \{f / \�E N W )/) � ;{) � 2=f E Z 2 2 e j(2 ~ \\\ )\\ \\\\\\ \\\ }3\ ■!) ■|»_,� md•!°;' c ■d o �;z! \ �) Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Operation & Maintenance Plan 17069 MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Operation and Maintenance Plan System Background The wastewater treatment and disposal system has been designed to treat the generated domestic wastewater from a resident dwelling. The system consists of the following: • One (1) 1,250-gallon septic tank with PolyLOK PL-122 effluent filter • One (1) Model 600 E-Z Treat recirculating media filter (treatment unit) • One (1) 1,000-gallon recirculation tank • One (1) Sta-Rite (Catalog Number STEP) 30'/z hp pump • One (1) 4,500-gallon field dosing / storage tank • One (1) field dosing pump (as shown on construction drawings) • One (1) flowmeter • One (1) rain sensor • Surface drip irrigation field with sufficient drip lines, and all the necessary appurtenances. Each of these treatment units are described in additional detail below. Septic, E-Z Treat Recirculation, and Field Dosing / Storage Tanks: The septic tank has been sized to provide at least 48 hours of anaerobic treatment and solids removal. Domestic wastewater generated from the residence will enter the first chamber of the tank by gravity, where solids settle to the bottom and scum floats to the top. The settled solids are anaerobically digested, reducing the volume of solids. The remaining liquid flows through the baffling wall into the second chamber, where further settlement takes place. A PL-122 Polylok, or approved equal effluent filter will be housed in the second chamber of the septic tank to prevent solids from reaching the E-Z Treat recirculation tank. Septic tank effluent will drain into the recirculation tank to receive aerobic treatment. The recirculation tank will house a Sta-Rite STEP 30 1/2-hp pump. Wastewater will then be pumped from the recirculation tank onto an E-Z Treat treatment unit where a spray manifold mists the wastewater over a media filter bed to maximize aerobic digestion by the microbes present. The E- Z Treat treatment unit effluent will flow by gravity back into the E-Z Treat recirculation tank to receive additional treatment or (if dosing is complete) to the field dosing / storage tank through the bypass valve. The field dosing tank has been sized to store up to 5-days of daily flow in the event of heavy rain or power failure. The effluent from the field dosing tank will be pumped to the surface drip irrigation field. The E-Z Treat recirculation and field dosing tanks are connected to audible and visible highwater alarms. These alarms will alert the operator when too much wastewater has accumulated in the tanks so that he may turn on the pumps to empty the tank. If the property, otherwise specified on the construction drawings, is served by a well system, water will not be used during a power failure. A standby generator shall be provided if stated in the permit statements. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08502.00 Pumps: There are two pumps within the wastewater treatment system. One (1) E-Z Treat treatment unit recirculation pump will be a Sta-Rite'/z hp pump (Catalog Number STEP 30). One (1) drip field dosing pump will be provided as specified on the construction drawings, or equivalent as approved by the engineer. Both pumps will be connected to the control panel. Pump efficiency shall be monitored by recording the amperage supplied to the pump. A sudden decrease in efficiency will indicate that the pump must be replaced. Pump replacement can be accomplished by disconnecting pumps from the power supply and unscrewing them from the attached piping. E-Z Treat Treatment Unit: The Model 600 E-Z Treat treatment unit will be used to provide aerobic treatment to the septic tank effluent as well as removing suspended solids not removed by the septic tank. The media filter bed will be housed in the container provided by E-Z Treat. The E-Z Treat treatment unit will be dosed by a Sta-Rite pump (Catalog Number STEP 30, '/z hp) with a distribution system placed above the styrene media which will discharge onto the media. The underdrain system will transport the E-Z Treat treatment unit effluent back into the recirculation or field dosing / storage tank. Ultraviolet Disinfection Unit: The ultraviolet disinfection unit will be used to treat the E-Z Treat treatment unit effluent before it reaches the field dosing / storage tank. The ultraviolet disinfection unit shall be E-Z Treat (Model E-Z UV 102) or approved equal by engineer. Rain Sensor: A Hunter Mini-Clik rain sensor shall be installed adjacent to the hydraulic unit in an area that will receive precipitation (i.e., that is not covered by trees). The sensor will only be used for the drip irrigation pump to cease operations during wet conditions. The field dosing / storage tank will store the treated wastewater for more than five days; however, it may be necessary to override the control system following large precipitation events if the tank is above capacity. During wet conditions, the sensor will send a signal to the pump controls to inactivate the pump. If it becomes necessary to release wastewater from the tank, the Mini-Clik may be turned off and the pump switched on manually. Drip Irrigation System: The drip irrigation field will be dosed by the field dosing pump. The drip field zoning criteria and drip lines shall follow as specified on the construction drawings. All zones shall operate independently. Each emitter shall be capable of delivering 0.53 gph. Crop Maintenance and Management: The drip area should remain as original condition and be planted with a fescue, rye, or Bermuda grass as needed in compacted areas. The wastewater applied to the trees or grass (if needed) will provide ample moisture and nutrients to promote plant growth. All dead trees if applicable, newly grown vegetation and newly grown trees less than 1 inch shall be removed yearly. Weed Eat vegetative cover to a minimum height of 4 inches if applicable to ensure vegetation does not interfere with the system operation. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 2 System Operation The wastewater treatment system is designed to dose the E-Z Treat treatment unit every 14 minutes to 20 minutes with 34 gallons of septic tank effluent. If less than 34 gallons of wastewater is available, the low-level signal will inactivate the pump. The control panel will activate the field dosing pump and associated control valve to dose the drip field. Flow to the drip field is designed for a maximum dose as shown on the construction drawings. The volume dosed is controlled by the "run time" set on the dose run/rest interval timer for each zone. The pump will de -energize if the low water level "pump off' float is activated. The flow meter installed in the hydraulic unit will track the volume of wastewater irrigated. If the highwater level "alarm" float switch is activated, the system will energize the audible and flashing alarm fixtures. Once energized, the flashing and audible alarm units may only reset manually. If the alarm light begins flashing after being reset, it means that either there is a clog in the system or the pump has failed. This may be corrected by simply pressing the reset button. If this doesn't energize the pump, the wet well will have to be opened and the pump removed to check for deficiencies or an object that may be clogging the system. If there are no obvious flaws on the pump itself and no objects inside the pump tank, restore the pump and try resetting it again. If the pump still does not work, contact the pump manufacturer. Both the E-Z Treat treatment unit and drip irrigation pump controls shall include, but not be limited to an `'auto/manual" system control switch, stop/start switch, non-resetable elapsed time recorder for each pump, and individual pump run lights. The control panel shall contain NEMA 4X enclosures. All supporting control units, if not housed within the pump control panels, shall be in a separate NEMA 4X enclosure. No heavy traffic shall be driven over the treatment units or drip field at any time. This access is restricted in order to protect the health and safety of people. It is important that the drip area in non -wooded or compacted areas be seeded with grasses or trees to establish vegetation. The vegetation will absorb any nutrients remaining in the treated wastewater, and the treated wastewater will promote the growth of the vegetation. The vegetation will absorb any nutrients remaining in the treated wastewater, and the treated wastewater will promote the growth of the vegetation. The vegetation will need to be maintained so that it does not interfere with the performance of the drip irrigation system. System Maintenance To ensure a smooth operating system, regular maintenance shall be performed on each treatment unit. The maintenance for each unit is detailed on the plans and is displayed in the following table. Further system maintenance information shall refer to the manufacturer's literatures. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 3 Operation and Maintenance Tasks Unit Frequency Task 3 — 6 months Check for solids accumulation, blockages, or baffle damages, Septic Tank: damage in/exfiltration, pump septage. Septic Tank: solids and scum 12 months Pump out accumulated solids if necessary, remove scum layer. Effluent Filter: Testing 3 — 6 months Check and clean as needed. Effluent Filter: 12 months Replace each time septic tank is pumped. Replacement monthly Inspect control/alarm panel, recirculation tank, and E-Z Treat E-Z Treat Treatment Unit treatment unit (filter pod). weekly Wipe (clean) UV lamp, check intensity and replace lamp when Ultraviolet Disinfection required. Pump Tanks: weekly Check pumps, controls, alarms, elapsed time meters. Pumps and Controls Pump Tanks: 3 — 6 months Check for solids accumulation, or infiltration and exfiltration. Solids and Potential Leaks Pump Tanks: 12 months Remove scum layer when septic tank is pumped. Scum Accumulation 2 — 4 weeks Weed Eat vegetative cover to a minimum height of 4 inches if Drip Field: applicable to ensure vegetation does not interfere with the system Vegetation operation. annually All dead trees if applicable, newly grown vegetation and newly Drip Field: grown trees less than 1 inch shall be removed yearly Trees Drip System: 3 — 6 months Check for leaks in force mains, odors, ponding, and erosion to Piping and Distribution ensure runoff does not occur in drip area. Equipment monthly Check flow meter readout and compare to recorded flows, check Pumps, Distribution Piping, pumps for leaks. and Alarm System quarterly Remove filter covers and inspect for accumulation of debris. Pumps, Distribution Piping, and Alarm System semiannually Remove and lubricate O-Rings on filter canister, replace if Pumps, Distribution Piping, damaged. Clean filter discs at hydraulic tubing feed. and Alarm System annually Remove filter disc cartridge and replace, clean cartridge and store for next annual replacement. Dig along side dripper line and Pumps, Distribution Piping, remove small section with emitter, repair with "RAM" couplings and Alarm System and new tubing, inspect removed tubing for excess slime or buildup. Flush dripper lines with chemical solution as needed. Check and or replace batteries in flow meter. Control Panel and 6 — 12 months Check amp readout and compare to manufacturers instructions. Pump Efficiency *Tanks should not be pumped during wet conditions. Martha's Vineyard, LLC Surface Drip System with TS-II Pretreatment MacConnell & Associates, P.C. Project No.: C08504.00 E�'����TREAT Re -Circulating Synthetic Filter Operation and Maintenance Manual NSF; Models bearing the NSF mark are certified Class I to one or more ofthe following standards: NSF/ANSI 40 NSF/ANSI 245 NSFIANS1350 ©2017 E-Z Treat 2-2017 TABLE OF CONTENTS 1.0 General Instructions 2.0 Basic Operation and Maintenance Requirements 2.1 Septic Tank 2.2 Re -Circulation Tank 2.3 Control Panel/Pumps/Alarms 2.4 E-Z Treat Re -circulating Synthetic Filter 2.5 Cleaning the Filter Media 2.5 Replacement of Media Mattress 3.0 Attention System Owner and Users 1 2 2 3 3 4 5 6 7 r� 1.0 General Instructions E-Z Treat Company requires regular life time inspection and lifetime maintenance of the E-Z Treat Re -circulating Synthetic Filter, as a condition of purchase and ongoing operational compliance. The inspection and maintenance interval should be no less than annually. For NSF listed systems or per applicable state regulatory requirements, the inspection and service interval shall be a minimum of every 6 months for the first two years and at a frequency per state regulations there- after. The mandatory service contract will include a performance based system inspection. The service provider must be trained and certified by E-Z Treat Company or authorized representative. All inspection and maintenance reports must be forwarded, along with any additional documentation, to E-Z Treat Company, the local authorized E-Z Treat Dealer, and all required or designated regulatory agencies. This manual contains a list of the routine maintenance procedures that are required by E-Z Treat Company. Failure to perform the required system maintenance could reduce the desired performance of the system and will void the warranty on the E-Z Treat Re -circulating Synthetic Filter system. The E-Z Treat Re -circulating Synthetic Filter system should be inspected by an authorized service provider at start-up and for all inspections thereafter. E-Z Treat Re -Circulating Synthetic Filter Pods Model 600 Model 1200 Pods can be configured in multiples for higher flow systems. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat r� 2.0 Basic Operation and Maintenance Requirements 2.1 Septic Tank The septic and re -circulation tank shall be inspected annually to ensure they are oper- ating properly. Remove the access covers over the tank openings to perform the inspection. 1. Verify the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks. The system must remain watertight to perform properly. 2. Remove, clean and replace the outlet effluent filter in accordance with the instructions provided by the effluent filter manufacturer. 3. Inspect the liquid level in the septic tank, it should be level with the bottom of the outlet pipe. 4. Inspect the effluent and scum layers in the septic tank. Look for oil or any other contaminants that are not normal. Verify the tank has received its scheduled pumping and cleaning. Check the solids layer in each of the tanks. If the solids layer is excessive have the tank pumped. Call: 703.753.4770 or visit: eztreat.net 2.2 Re -Circulation Tank The re -circulation tank shall be inspected annually to ensure it is operating properly. Remove the access covers over the tank openings to perform the inspection. Verify that the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks, the system must remain watertight to perform properly. 1. Inspect the liquid level in the re -circulation tank, it should be level with the bottom of the outlet pipe. At initial system start-up, remove the end caps from the spray manifold. Operate the re -circulation pump by turning the pump control to the "HAND -ON" position. Let the pump run for one minute then turn the pump control to the "OFF" position repeat this procedure three times to flush any construction debris such as dirt or pipe shavings from the spray manifold. Replace the end caps hand tight —do not use wrenches or pliers. Re -set the pump con- trol selector switch to the "AUTO" position. Inspect the float by-pass valve. Manually start the re -circulation pump and observe the float ball valve, the ball should drop as the liquid in the re -circulation tank drops the effluent returning from the E-Z Treat pod should flow back into the re -circulation tank and should not flow out the discharge pipe. 4. Verify that all the re -circulation pump floats are in good condition, properly secured to the float bracket and are able to move freely within the re -circulation tank. Observe the system as it re -circulates. Visually verify all flows through the system. ©2017 E-Z Treat n 2.3 Control Panel/Pumps/Alarms 1. Check the functions of the E-Z Treat Re -circulating Synthetic Filter control panel. Control: Main Control "ON/OFF" switch Function: Turns power ON or OFF Control: System Setting Switch "MANUAL ON" and "AUTO ON" Function: "MANUAL ON" overrides all float switches and time clock switches "AUTO ON" allows for normal operations dictated by the time clock and float switches. Control: Timer "MINUTES ON" and "MINUTES OFF" Function: Controls run time of re -circulation pump i.e. GP17 re -circulated through media. Control: High and Low Water Alarm "ALARM ON", "ALARM AUTO" and "ALARM SILENCE" Function: "ALARM ON" will manually turn on the audio/visual alarms. "ALARM AUTO" is the normal operational setting and "ALARM SILENCE" turns off the alarms. Check re -circulation pump. Place the system in the manual mode by turning the re -circula- tion pump switch to "ON". The re -circulation pump should begin to supply effluent to the spray nozzles in the treatment pod. 2. Check the voltage and motor amp draw and record the readings. If the readings are beyond the limits of the NEC recom- mendations, have an electrician check the main service line feeding the system control panel. Light will burn Green to indicate re -circulation Pump is OFF. ---------- Light will burn RED to �► indicate re -circulation Pump is ON. Rotate dial to desired minutes ON. -a Clock face screw will change the clock face from a maximum time of 1.5 units to a maximum of 30 units. Always set the clock face to 30. -►�. eml Rotate dial Call: 703.753.4770 or visit: eztreat.net Place the system in the normal operating mode by turning the re -circulation pump switch to "AUTO". Verify the timer ON/OFF settings are the same as set at system start-up. Record those timer settings in the system log. 4. Verify the accuracy of the system ON/OFF Timer. To accomplish this use a stop watch and verify the length of time the re -circulation pump is OFF then verify the time the re -circulation pump is ON, those times should match the ON/OFF Timer settings in the control panel. Window will display OFF "Sec", "Min" or "He'. Rotate OFF screw until . --o_ "Min" appears in window. OFF screw displays seconds, minutes or hours. Window will display ON "Sec", "Min" or "He'. Rotate ON screw until "Min" appears in window. ON screw displays seconds, minutes or hours. ©2017 E-Z Treat 13 M o' 3 Q 3 fy 3� rt M 3 3 n M 3 !y 3 IC 5. Confirm the operation of the visual and audible "HIGH" and "LOW" water alarms. The control has an alarm switch clearly marked Alarm "ON", Alarm "AUTO" and Alarm "SILENCE" Place the alarm switch in the "ON" position, you will hear a loud buzzer and see a red flashing light. Move the switch to the Alarm" SILENCE" position the red light and buzzer will go dormant. 6.Once the alarms have been triggered return all settings to their original position of Alarm "AUTO" (If applicable, verify the operation of the telemetry unit by checking the alarm notations on the website.) 2.4 E-Z Treat Re -circulating Synthetic Filter 7. Verify the floats are operational by manually raising and lowering the floats to simulate the systems normal operation. Verify proper operation of "High Level Float" by lifting the float while the system T is in the "OFF" time mode, the re -circulation pump should turn on over riding the "OFF" timer, the Visual and Audible alarms should activate. Return the float to its normal position the re -circulation pump will turn off. Reset the alarms and manually lower the "Low Water Float" with the timer in the "ON' mode, the re -circulation pump will turn off and the visual/audible alarms will activate. Return the float to the normal position and the re -circulation pump will run. Reset the alarms. 8. Properly re -install and secure all tank accesses! The E-Z Treat Re -circulating Synthetic Filter should be inspected to ensure it is operating properly. Remove the pod cover to perform this inspection. Each E-Z Treat system should be installed with a sample box located on the final discharge side of the treatment system, this sample box is ideal for grab samples. If the installer failed to install a sample box grab samples can be taken from the pump discharge tank. Many state regulations include instructions for taking grab samples those rules and procedures supersede E-Z Treat. 1. Take a grab sample of the effluent check for: a. Odor, the effluent may have an earthy or musty smell there should be no strong or offensive odors present. b. Color, the effluent should be clear and absent of any color. c. Solids, there should be no visible suspended solids d. Solids, let sample set for 15 minutes, there should be no visible settling of solids. e. Test the pH, it should measure 6.9 to 7.5 If there is odor, color or solids clean the media. If the pH is below 6.9 reduce the re -circulation rate by increasing to "OFF" time on the Time Clock Control. Recheck the pH in 90 days. Call: 703.753.4770 or visit: eztreat.net 2.Observe the spray distribution nozzles during operation. If a nozzle appears to be clogged or if the spray pattern is not uniform, remove the nozzle and clean the nozzle using a pipe stem cleaning brush. 3. Record the pressure reading on the dis- tribution manifold gauge. Compare that pressure to the pressure recorded at the previous inspection. The pressure should read 18 to 25 PSI. a. Verify the pressure gauge on the spray distribution manifold is performing properly. b. Verify the flow rate at the spray nozzles (it should be 1.75 to 2 GPM) - c. Verify the re -circulation pump is the same make and model pump that was specified for the original installation. ©2017 E-Z Treat r� d. Verify the re -circulation pump is per- 4. Verify the treatment pod is properly draining forming in accordance to the pump by looking down the pod side wall vents, manufacturers' specifications including there should be no standing water, the amp draw and flows at specific pressures. bottom of the pod should be visible. e. If the pressure is above the prior record- ing or above the start up setting, open 5. Visually inspect the surface of the treatment the ends of the distribution manifold lines, media for: manually start the re -circulation pump and a. Holes, tears, loose seams allow it to run for 5 minutes. This should b. Foreign material flush out the spray distribution lines. If the pressure remains too high, after cleaning the spray nozzles and flushing the spray distribution lines, adjust the pressure to the desired PSI using the ball valve on the main spray distribution supply line. f. If the pressure/flow is too low check for cracks, breaks or obstructions in the main distribution supply line. 2.5 Cleaning the Filter Media c. Black color on media (media should have light brown tint) d. Excessive bio mat growth e. Ponding f. Clumping of the media. Note: If any of these conditions exist the media needs to be cleaned. Depending upon influent strength and influent volumes, excessive biological growth can accumulate inside and on the surface of the media filter after 7 to 10 years of use. Cleaning of the media is a very simple and easy 10-step process: Step 1: Turnoff power to any discharge pump. Step 2: Remove the treatment pod cover and remove the spray distribution manifold. Step 3: Connect wash down hose to the main spray distribution supply line. Step 4: Manually turn on the re -circulation pump. Step 5: Pressure wash the surface of the media mattress, the wash water will drain into the re -circulation tank and will be re -used as wash water. Step 6: Roll the media mattress and wash the sides and bottom of the media mattress. Step 7: After the media is completely cleaned properly place the media mattress in the treatment pod. Step 8: Re -Install the spray distribution manifold. Step 9: Pump out and clean the re -circulation tank removing all the wash down water. Pump out the septic tank. Step 10: Turn on power to discharge system and return the treatment system from "Manual" mode to "Automatic" mode. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat r� 2.6 Replacement of Media Mattress If the filter media is exposed to excessive concentrations of petroleum products, paints, glues, waxes etc. it will become necessary to replace the media. The replacement process it is a very fast and simple. Removing the media mattress should be performed by service agents that are trained and certified by E-Z Treat Company. StepIL: Turnoff power to re -circulation pump, discharge pump and controls. Step 2: Pump the septic tank and re -circulation tank to assure continued service by residence during the replacement. Step 3: Remove the spray distribution manifold. Step 4: Lift the media mattress out of the filter pod. Step 5: Place the mattress into the fiberglass transport container provided by E-Z Treat Company. The container is easily hauled in a pickup truck or on a light duty trailer. Step 6: Install new filter media and replace distribution manifold. Step 7: Reset all system control settings to "AUTO" and turn the main power switch to the "ON" position. Once the mattress is returned to E-Z Treat Company, the styrene material will be sent to the nearest recycling facility for processing. Alternatively, the service provider can transport the mattress to the nearest styrene recycling facility for processing. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat r� (D r+ O� !y 3 !y e+ (D 7 7 n lD 3 0) IC 3.0 Attention System Owner and Users CAUTION Do Not open or enter any system components for any reason. If a problem exists or you have questions about your system, call your authorized service provider. Once the E-Z Treat Re -circulating Synthetic Filter system is installed, a post -construction conference is recommended. This is an opportunity to familiarize the owner with the system. No attempt should be made to adjust any component of this system except by a Certified Operator. The E-Z Treat Re -circulating Synthetic Filter system allows the homeowner to receive a high quality, reliable and economical wastewater system that protects the environment. As with any onsite wastewater treatment system, the homeowner should be familiar with basic guidelines which help the system achieve repetitive, reliable performance. Please do not hesitate to contact your certified operator or E-Z Treat Company with any questions, concerns or comments about your E-Z Treat Re -circulating Synthetic Filter system. Users of the System —Remember! To assure proper performance of your E-Z Treat Re -circulating Synthetic Filter, you should avoid disposing of the following products into your septic tank: ■ Oil & Grease (kitchen waste) ■ Water Softener backwash ■ Wax & resins ■ Petroleum Products ■ Paint & Paint Solvents ■ Pesticides ■ Condoms & sanitary napkins ■ Toxic substances (Liquid Plumber, Drano, etc.) ■ Non -Biodegradable products (cigarette butts, antibacterial wipes, etc.) ■ Any kind of septic tank additive (Rid-X, etc.) Owners of the System —Remember! ■ Keep heavy loads and traffic off of your onsite system components and drainfield. • Never drive cars or trucks within 10 feet of any system access lids. Landscaping or future building projects should be planned with the drainfield and drainfield repair area in mind. ■ Do not shovel or blow snow on top of your onsite wastewater system. This will temporarily limit access to your system and could overload and damage the system. ■ Make sure drainage from the house or around the property is carried away from your onsite system. ■ DO NOT OPEN OR ENTER ANY OF THE TREATMENT SYSTEM TANKS. SEPTIC GASSES CAN BE TOXIC, CAUSING SERIOUS INJURY OR DEATH! Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat E-Z : T PO Box 176 Haymarket, Virginia 20168 T 703.753.4770 F 571.248.8837 eztreat.net ©2017 E-Z Treat 2-2017 E-Z Treat Company, Inc. Residential Applications 2-Year Limited Warranty PO Box 176 Haymarket, Virginia 20168 1. Preamble E-Z Treat Company (herein referred to as "E-Z Treat) is known for researching, designing, and producing innovative products of high quality for the onsite wastewater industry. We are proud to stand behind our E-Z Treat Sand/Media Filter. For the purpose of this warranty, "Service Provider" means the legal Certified Operator of the system. This Service Provider shall be currently listed on State and Local records as meeting any applicable requirements required by law and/or Rule. Also, for purposes of this document, "Installer" means the person or company that has installed the system, and "Owner" means the person that has purchased the system or purchased the property serviced by the system. 2. Nature of Warranty E-Z Treat warrants to the Owner that the E-Z Treat Sand/Media Filter will function within prescribed limits for a period of two years from the date of purchase. E-Z Treat also warrants certian components of the system against materials, workmanship and manufacturing defects for a period of two (2) years from the date of installation. This warranty is in addition to the legal warranties and Owner's rights in accordance to applicable law. The conventional warranty of E-Z Treat is expressly limited to the text in this certificate. Owner is responsible for reasonable care and communication with the Certified Operator. 3. Obtaining Warranty Service To make a claim on this warranty, the Owner should put the request in writing and mail or deliver to an authorized E-Z Treat Certified Operator. The claim will be processed and sent to E-Z Treat headquarters. Any claim must be received no later than two year from the date of purchase of the E-Z Treat Sand/Media Filter. On receipt of this claim, E-Z Treat or their authorized representative will examine the situation at the site and take corrective action where the terms of the warranty apply. 4. Exclusions and Limitations E-Z Treat Company Warranty only extends to replacement parts the labor for installing those parts is not part of this warranty. Any electrical device or electrical component is excluded from this warranty including replacement parts and labor. 33 E-Z Treat is not liable for the dispersal portion of the onsite wastewater system. This portion of the system is evaluated, designed and constructed in accordance with local regulations and is wholly separate from the performance of the E-Z Treat Sand/Media Filter. The following conditions are also excluded from the E-Z Treat warranty: • This warranty does not cover cosmetic damage or damage due to acts of Nature, misuse, abuse, modification, incorrect design or incorrect installation. • The warranty is void if any modifications or repairs are made to the system by anyone other than an E-Z Treat approved agent. • Failure of the Owner to comply with the requirements set forth in the Owner's Manual. • The warranty is void if any system components are repaired or replaced by parts not supplied or approved by E-Z Treat. • This warranty is not applicable to systems not receiving domestic, residential sewage. • The warranty is void if it is found that the Owner has failed to notify E-Z Treat of any change in the use of the property from its original design. 5. Indemnities and Damages E-Z Treat's liability and obligations under this warranty for corrective measures or means of correction shall be limited to the replacement of the E-Z Treat Sand/Media Filter Components. 6. Limitations of Damages E-Z Treat is not liable for any damages sustained by the Owner. E-Z Treat's compensation and indemnification obligations are limited to the provisions of this warranty 7. Transfer of Ownership In the event of transfer of ownership within two years of use, this warranty shall transfer to the new Owner for the remainder of the period under the following conditions: a. The New Owner has a Certified Operator under contract. b. An Inspection of the E-Z Treat Sand/Media shall be conducted prior to transfer. Upon a satisfactory inspection, the Owner shall obtain a written report from the Certified Operator 8. Inspection The Owner shall allow the Certified Operator access to the property and system components for purposes of necessary monitoring and service. If the Owner submits a request of claim under this warranty and it is found to be in error after inspection, a charge for direct expenses will be billed to the customer to cover the cost of the inspection. 9. Priorities of the Warranty This warranty supersedes any contract or understanding, verbal or written, entered into between the Owner, Certified Operator, Installer, or Representative of E-Z Treat. M SYSTEM MAINTENANCE It is recommended that the system receive routine maintenance, at least annually. Please check your State and local regulations for required frequency of inspection. ROUTINE AND PREVENTATIVE MAINTENANCE 1) Remove the filter and clean, or install a clean filter element. 2) Open the field flush valve and flush the field for 5-10 minutes by activating the pump in "manual" position. Close the flush valve (on systems with manual flush valves, close the field flush valve until design field pressure is reached). 3) With the pump in the "manual" position, check the pressure in the drip field by using a pressure gauge on the Schrader valve (located on the air vents), and by reading the pressure gauge located in the Headworks box. The pressure should be close to the same as shown on the initial installation records. 4) Remove the lids on the vacuum breaker and check for proper operation. If water is seen leaking from the top of the vacuum breaker, remove the cap of the vacuum breaker and check for debris. 5) Turn off the pump. 6) Periodically remove and clean the air vents, field flush and filter flush valves. 7) Visually check and report the condition of the drip field, including any noticeable wetness/variations. S) Treatment and distribution tanks are to be inspected routinely and maintained when necessary in accordance with the manufacturer's recommendations/State regulations. 9) Record the date of inspection as well as readings from elapsed time meter, pump counter, peak counter, high-level counter, power fail counter and any other logs provided in system controls. Double check the settings of the control panel to be sure no one has tampered with them since the last inspection. 10) Reset the controller(s) for automatic operation before leaving. December 2008 Page 18 HOME OWNERS GUIDE FOR CARE AND MAINTENANCE OF DRIP DISPERSAL FIELD A drip system has been installed on your property for the dispersal of the effluent from your home The drip dispersal system consists of a series of diameter drip tubing. It is designed to effectively disperse of the treated effluent using a combination of soil absorption and plant uptake. Your drip dispersal system will function for many years with only minimal maintenance being required, provided the following recommendations are followed: ❑ Establish landscaping immediately over subsurface system. This will stabilize the soil and allow for the grass to take up the water. ❑ Do not discharge sump pumps, footing drains or other sources of water to the system, except for the effluent discharge from your treatment system. ❑ Maintain all plumbing fixtures to prevent excess water from entering the dispersal system. ❑ Do not drive cars, trucks or other heavy equipment over the drip dispersal field. This can damage the drip components or the soil and cause the system to malfunction. ❑ Do not drive tent stakes, golf putting holes, croquet hoops, etc. into the dispersal field. ❑ Contact your service company if your alarm should sound. The pump chamber is sized to allow additional storage after the alarm sounds but you should refrain from excessive water usage (i.e., laundry) until the system has been checked. Contact your service company if you notice any areas of excessive wetness in the field. There may be some initial wetness over the driplines following the initial installation. This should stop once the ground has settled and a vegetative cover is established December 2008 Page 19 E�' 'TREAT ,=male Re -Circulating Synthetic Filter AST Installation and Maintenance Guide Note: Maintenance Only Installation is in Equipment Section NSF Models bearing the NSF mark are certified Class I to one or more of the following standards: NSF/ANSI 40 NSF/ANSI 245 NSF/ANSI 350 OO 2017 E-Z Treat 2-2017 TABLE OF CONTENTS 2.0 UV Light System Maintenance I��.J �1�111R1►.� �f ■lK�.li�.'��l`1�1�I111.1 ��.1, \�J.P l C C O� 0 c a. (D 2.0 UV Light System Maintenance The UV lamps quartz tubes (housing the lamps) must be cleaned at a minimum frequency of every 12 months. Caution: Do not run UV lamps dry. Caution: Always turn off the power to the UV system Fill UV housing with water/effluent before any maintenance is performed. Use extreme before turning on power. care when handling the fragile UV lamp assembly. Step 1: Turn power "OFF" to the UV system! Step 2: Unscrew the fitting holding the UV lamp and quartz sleeve. Step 3: Lift the UV lamp assembly upward until it is clear of the housing. Step 4: Using a clean, damp sponge or clean, soft cloth, wipe all residue from the quartz tube. Clean stubborn, dirty areas with a liquid glass cleaning product. Caution: DO NOT scrape or use scouring pads. This may scratch the quartz tube and alter the performance of the UV system. Step 5: Visually inspect each quartz tube for cracks or breaks; replace any UV lamp assembly that is cracked, scratched, or broken. Step 6: Re-insert the UV lamp assembly into the housing and tighten the fitting that holds the UV lamp and quartz sleeve. Caution: (Hand -Tighten Only) DO NOT use wrenches, pliers, or other tools to tighten. Step 7: Turn power "ON" to the UV system. Call: 703.753.4770 or visit: eztreat.net ©2017 E-Z Treat E Z (�&,oTREAT PO Box 176 Haymarket, Virginia 20168 T 703.753.4770 F 571.248.8837 eztreat.net ©2017 E-Z Treat 2-2017 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Operation &Maintenance Agreement (09-18) MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 DWR Division of Water Resources Permit No. N Q00 State of North Carolina Department of Environmental Quality Division of Water Resources SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEM OPERATION AND MAINTENANCIe AGREEMENT FORM: SFRWWiS-O&M 0948 County: C:hathant Permittec: Martha's Vineyard, T T C (i.e.. all deeded property owners) the Pcrmittcc agrees to operate and maintain the single-family residence wastewater treatment and irrigation system as follows: 1. Inspect the septic tank annually, and pump out solids as needed. 2. Inspect and clean the septic tank effluent filter annually. (if t4pplkuble) 3. inspect the tablet chlorinator weekly. Add wastewater grade chlorine tablets (e.g., calcium hypochlorite) as needed. Swimming pool grade chlorine tablets art not acceptable. (ifaMicable) 4. inspect the ultraviolet disinfection unit weekly. Clean or replace the lamps and quartz sleeves as needed. (if applicable) 5, Inspect all storage tanks, pumps, and alarms monthly. Remove the floating scum layer in all pumplstoragc tanks when pumping the septic tank solids out. 6. Inspect the spray irrigation system monthly to verify: proper operation of the spray heads; that there are no leaks; that vegetative growth does not obstruct the spray heads; that the irrigated wastewater is not ponding in or running off the designated irrigation area; and that there are no objectionable odors. (ifapplicable) 7. Inspect the drip irrigation system monthly to verify; proper operation of the drip lines; that there are no leaks; that vegetative growth does not obstruct the drip emitters, that the irrigated wastewater is not ponding in or running off the designated irrigation area; and that there are no objectionable odors. (if applicable) 8. -Maintain a set of Division -approved engineering plans and specifications. 9. Pay the required annual fee. 10. Request renewal of this permit on Division -approved forms no later than 180 days prior to expiration. 11- Sign and provide a Change of f)wncrship application to any future owner of the single-family residence wastewater treatment and irrigation system for their completion and submission to the Division of Water Resources. We understand the above requirements and agree to these terms as part of the issued permit. Sir;naturc: —A t- Date: �' /J�R /20 Z3 Signaturz: Date: Signature: _ Signature: Date: Date: All deeded_nrooert-, owners shall sign this Operation and Maintenance reement FORM: SFRW WIS-0&M 09-18 Page I of I Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina County Health Department Denial Letter (Email) MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Annie Foxworth, E.I. From: Gary MacConnell, P.E. Sent: Wednesday, June 14, 2023 9:20 AM To: Annie Foxworth, E.I. Subject: FW: Carpenter Property Options Gary S. MacConnell, P.E. President (o) : (919) 467-1239 (c) : (919) 523-2248 MacCONNELL Associates, P.C. 4411 1 awndr 1'dLnir J.ear, Svde 1413 ['x r}, \C , 3741. & K(1. ItI•; 1'.'J %Ioni%Wle. N( 27;4-11 'I cl: 14 LVaril- 1 BIJ Lax: ('J 19) 3 L'94-5111 From: Anne Lowry<anne.lowry@chathamcountync.gov> Sent: Tuesday, November 22, 2022 12:29 PM To: Gary MacConnell, P.E.<gary.macconnell@macconnellandassoc.com> Cc: Joel Carpenter <oldecarpenter@bellsouth.net>; David Barcal, P.E.<david.barcal@macconnellandassoc.com>; Lori Thorn <lori@piedmontsoil.com>; Josh Halsey <josh.halsey@macconnellandassoc.com>; Chris Murray <chris@pied montsoil.com>; Thornburg, Nathaniel <nathaniel.thornburg@ncdenr.gov> Subject: RE: Carpenter Property Options Hello Gary, I have reviewed our file for each property and based upon the severe soil limitations identified in the notes attached to the denial letter(s), there are no subsurface septic systems that have been approved for use in North Carolina that can overcome the limitations. Please let me know if you need anything else from Chatham County. Thank you, Anne Lowry, REHS Environmental Health Director Chatham County Public Health Department 80 East Street/PO BOX 130 Pittsboro, NC 27312 www.chathamcountvnc.eov/environmentaIhealth 919-545-8310 In keeping with the NC Public Records Law, e-mails, including attachments, may be released to others upon request for inspection and copying. From: Gary MacConnell, P.E.<gary.macconnell@macconnellandassoc.com> Sent: Tuesday, November 22, 2022 8:59 AM To: Anne Lowry<anne.lowrv@chathamcountync.gov> Cc: Joel Carpenter <oldecarpenter@bellsouth.net>; David Barcal, P.E.<david.barcal@macconnellandassoc.com>; Lori Thorn <lori@piedmontsoil.com>; Josh Halsey <josh.halsey@macconnellandassoc.com>; Chris Murray <chris@pied montsoil.com>; Thornburg, Nathaniel<nathaniel.thornburg@ncdenr.gov> Subject: Carpenter Property Options age originated from outside the Chatham County email system. Do not click links or open attachments unless you recognize the sender and kni Anne, Per our earlier conversation Joel Carpenter wants modify his development. Several years ago, five lots were permitted as a minor subdivision. These lots were permitted as surface drip systems through NCDEQ because they could not be permitted as subsurface systems. Joel wants to reconfigure the lots and have a total of 8 lots. Per our discussion, you indicated that there is no need to reapply for subsurface systems since the soils in the area have not changed. Please confirm if this is correct. I have copied Nathaniel Thornburg of NCDEQ for reference, as we will soon be reapplying for the three additional lots and modifying the permitted lots. Thank you and have a great Thanksgiving. JGary S. MacConnell, P.E. (President (o) : (919) 467-1239 (c) : (919) 523-2248 MacCONNELL Associates, P.C. 4411 1 awndi- 1'1104. J.ear, MUIC 1413 1'.Y},M ,3'{1.& K(1.11u16 1.'J N ICII. I Lilt. N[ 2' --dill 'I cl: 14 LWaril- 1I34 U aa: ('J 19) 31.194-9111 Per the attached Option 1 exhibit: • Lot 5 will remain unchanged. • Lots 1 will need a minor modification as the lot lines changed (although the system did not) • Lots 2 and 3 will need a minor modification as the drainfields will remain, but the lot lines and treatment systems will need to be relocated. • Lots 1A, 2A, 4, and 4A will need new permits. and notify the sender. Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Floodway Regulation Compliance Iz_vz3 MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 r � � x 0 o 2 w 3 ao N = m ¢ > LL C OO N Q N a x 06 2 LL O c6 c O J Nm 0 LL U c6 h a N Z OjE ^2 N O = U N W a m U m Ln O F (N6 a ? W O d N O m i L Q aL+ yp N ei n N N +3+ f6 d> d 3 L d d d > L N D c6 2 y ut O f6 O O a O T Z W r � � � O O a c6 LL U Q J Q Q W Q U J U� U m J ^ U d 2 0 ¢a s ¢ 2 ¢ a ¢ J Q¢ ¢ 2 a O ¢ W LL LL U Q ¢ O 2 H H LL N Q O O ry to N m O _O H Z� W c n z o d a N o m�d� �= o yui46�3o o= 3 m 0~ d= o a£ m � Ana o o £ d oQ oy m 2a L V� � aN aTcc� tL6 ti 0 O N L W a O U T RfCC6 N O d L > Q o1 ' 4 h d Q = C G; =o O 2 0 s , o p R C 4J 4 N e�5 i3 R L O N o. N O O O a f6 w N N" a R O= 0 R= c£ c N t6 0 ^m Q £ s+ a yc U a 0 o a f6 c6 � N U a o= .3 o.* £ o acc a=a a o o L ;� = 0 3 N o a��oa Smom.a u�c6y��N LU Z0. o£u n o L>-�mZ Ea�daa a m Q o d~ d a a a z h 2 o O h N 3 Martha's Vineyard, LLC Martha's Vineyard Lot 2A Chatham County, North Carolina Threatened or Endangered Aquatic Species Documentation MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Roy Cooper, Governor �■■EW INC DEPARTMENT CF ■■mom NATURAL AND CULTURAL RESOURCES 0 ■■■ May 24, 2023 Chrissa MacConnell Green Global Technologies 501 Cascade Pointe Lane Cary, NC 27513 RE: Martha's Vineyard Lots 2A and 3; C08504.00/C08505.00 Dear Chrissa MacConnell: D_ Reid Wilson, Secretary Misty Buchanan Deputy Director, Natural Heritage Program N CN H D E-22031 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database indicates that there are records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. These results are presented in the attached `Documented Occurrences' tables and map. The attached `Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is documented within the project area or indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: https://www.fws.gov/offices/Di rectory/ListOffices.cfm?statecod--=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. Also please note that the NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or an occurrence of a Federally -listed species is documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rod ney.butlerC�ncdcr.aov or 919-707-8603. Sincerely, NC Natural Heritage Program DEPARTMENT OF NATURAL AND CULTURAL RESOURCES p 121 1N. JOr,4ES STREET. RALEIGH. NC 27603 * 16S1 HAIL SERvICE CENTf R, RALEIGH, rfr_ 27G9!) OFC 919,707.9120 • FAX 919.707.9121 \\\ - e = 0 / CO ~ 0 ~ d $ E \ / -Co t > 7 3 DL s ƒ > \ % .\ / m 3 ° > - ro u \ \ \/\° ƒ %y c � \ \ m -C2 6%\\ Ln ���� u 0 0 3 e = 0 .0 ro % 0 ~ / \ / / ° / z \ 0 \ 5 3 (D > %/\ \ \\ \ 3 7 0 j j % C� m - \ e \ \ \ c / \ \ / / _ \ G -CE ® > 0 2 3 ©s 2 = m 2( °/ < c{\\ -0m/ \\ o/ j` Jjc M 2 (D Sos2 m = o / / / \ % t / (0/ \ a / e 3 / \ y \ o p / = 2 - Ln 0 \ \ 0 \ \ \ \ N \ 0 2 . ea %?\ 6 s=> d e 2 2 a y m/ \\/�/ o m 3 /\0U a\\ 2 j\> ` : \>6 Z roCD } \ \ / 0 w ® « \/ o �t / \/� c / / »/\2 Ln ^� \ e j E 2 // 2 y /\ j \:E u 4 / / c e = e \ e® \ \ :oz §2 \ \L\ \ < s\©! c \ \\D < 5 ���2 2{ % E 3 ~ 3 % Ln \ %V 2\ / y o / \ \ .\ ,$ y \ : \ mm c \ \\) CD / % = 2 y c \ w = » 2 .g ywou y S = \? > \ ( \ \ 3 2 2 u2/z 3 .»/ \ / 0 CD ( \ -C\ L. LE aƒ z » 0 \ o \/ \ / 2 > \ _0\ ° e °/» \ m \ « a \ \ % \ /\ 0 a) / \ E / % E/\ \ 0 % \Ec//\\ o m - T e \ � ~ u / \ % / \ 2§ 3/ / -0 \ \ 2 % e 3 \ = :\ e y /o C / 2 <<\t 2 e \/ E o \ 2 ® / / \ ) \ \ \ / 0 0 % \ \ z ` © LLJ/ \ � / D n \ C C LLj o « U c e O o s m c z=: Z R Z 3% s Z 0 / / 0 / / S co a z e e e e e o/ O O 3 3 - » \ j < \ ¥\ 5 5 \ eg \ \ \y\\2\ \ '0 U) 2 2 c e 2®\E L- ys y ± ~ ~ _ \ / ® ® 0 \ _ \ _ 0 . o/ 20/ /% \ 2\//\�//\� ®� ± ƒ m ® 0 2 ® 0 / \ 0 �/ n / £ §\ 2 7/ t u « ® / 2 « a « a « a « a \ : 2 / Y Y Y Y \\ m e < & & & & e %_ {3 / /mo © CCa om ®» a)\ A- \ / c c c < _ \ \ «</ //® 0 \n o gmo _ //o\\ 0 9 % /?\y6 / e\cme j\\\/ % \ \ e \ \ ///\/ a o g o ^ 0 ^ 2 e CC C ? o U © / \ \ « 2 co z / _ 2 u g .g a a \ o 2 ± \ \ / U \ %.% � ~ o ..� =y0 o y ® ° 5 ~ \ - 0 ? \ \ E J _ 0/ o fo 2 \\ ƒ CD> y 75 2 2 \ CL \ /\ / / \ 2/\ & \C [ ± ± ± e \ / o \ ƒ \ \ \ \ \ \ O o e m m U U \_ 0 \ 0 E m e / 2 y e > / / / \ o \ \ ( / / } \ / \ / ) \ \ D \ � s 2 u \ C v % / % / 6 g \ \ 2 \ \ \ / / j \ / / / \ \ \ \ - = / / ID / ro / / s_ o / 0 \{ \/ ) o Qo ? $ 2} \ / / 0 / _)o yj /\ )2 \ \%� \\\ \ \� \ \ ru \ 70- \\to / \ = c o o = 0 0 2 o= c 5 5 m ® // 0 }\ s ( 0 y y G % c c u 2 / / \ 2 2 / / / / / 2 \ ) 0 \ / 4- Ln 0 N N 0 Q o UT Z a W C Q m V N W O S3 Q 7 O U1 N f6 w N O m D O cm m d I E N n a