Loading...
HomeMy WebLinkAboutWQ0024003_Monitoring - 11-2023_20231227Monitoring Report Submittal Permit Number#* Name of Facility:* Month: * November Report Information WQ0024003 Harvey Point Defense Testing Activity WWTP Type * NDMR, NDAR-1, NDAR-2, NDMLR G W-59 Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2023 Upload Document* Scan NDMR Nov. 2023.pdf 1.87MB PDF Only Scan MW Nov. 2023.pdf 7.21 MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). dustin.b.combs@boeing.com Dustin B. Combs 12/27/2023 This will be filled in automatically Reviewer: Wanda.Gerald Is the project number correct?* WQ0024003 Is the monitoring report accepted?* Yes No Regional Office* Washington Reviewer: _anonymous Review Date: 1/17/2024 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1, of Permit No.: WQ0024003 Facility Name: Harvey Point Defense Facility county: Perquimans Month: November Year: 2023 PPI: 001 Flow Measuring Point: ❑Influent I ]Effluent []No flow generated Parameter Monitoring Point: ❑Influent [j]Effluent [ ](-,roundwater Lowering ❑Surface Water Parameter Code -0 50050 00310 00940 31616 00610 1 00620 00400 00665 70295 00530 00600 00625 00630 t c O 4 ~_ O 0 11 U) m V LL p E ` fl r w F r a o f'O N O cn 0 'p m e 'p p_ O ,N V) N m O ` - NELP O +N •d ' ZZU 24-hr hrs GPD mg/L mg/L #/100 mL mg/L mg/L su mg/L mg/L mg/L mg/L mg/L mg/L 1 0730 4 8,092 7.21 2 0730 4 8,232 7.19 3 07:30 4 4,681 7.24 4 4,681 5 4,681 6 0730 4 9,168 7.31 7 0730 4 7,580 7.06 8 07:30 4 7,656 7.43 9 07:30 4 4,886 7.37 10 H H 4,886 H 11 4,886 12 4,886 13 07:30 4 8,388 7.26 14 07:30 4 7,572 7.24 15 07:30 4 6,644 7.46 16 07:30 4 6,924 7.55 17 07:30 4 2,934 <2 <1 <0.2 46 7.44 45 2 7 46 <0.5 46 18 2,934 19 2,934 20 07:30 4 4,948 7.39 21 07:30 4 5,232 7.44 22 07:30 4 51704 7.41 23 H H 5,704 H 24 07:30 1 3,156 7 25 3,156 26 3,156 27 07:30 4 7,756 7.14 28 07:30 4 61592 7.29 29 07:30 4 3,964 7.34 30 0730 4 6,312 7.26 31 Average: 5,6ll 0.00 1.00 0.00 46.00 4.50 2.70 46.00 0.00 46.00 Daily Maximum: 9,168 2.00 1.00 0.20 46.00 7.55 4.50 2.70 46.00 0.50 46.00 Daily Minimum: 2,934 2.00 1.00 0.20 46.00 7.00 4.50 2.70 46.00 0.50 46.00 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Avg. Limit: 24,300 30 200 15 30 Daily Limit: 6_9 Sample Frequency:1 Continuous I Monthly 3 x Year Monthly Monthly Monthly 5 x Week Monthly 3 x Year Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page a_ of Sampling Person(s) 11 Certified Laboratories Name: Dustin Combs 11 Name: Environmental Chemists Inc. Name: II Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑r compliant []Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Dustin B.Combs Permittee: Harvey Point Defense Testing Activity Certification No.: 1003645 Signing Official: Stephan Oltjen Grade: III Phone Number: 252-562-2684 Has the ORC changed since the previous NDMR? ❑ves [-17,No Signature Date By this signature, I certify that this report is accurrale and complete to the best of my knowledge. Signing Official's Title: Enviromental Safety Officer Phone Number: 252-426-4360 Permit Expiration: 2/28/2030 r, Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page I- of_�a__ Permit No.: WQ0024003 Facility Name: Harvey Point Defense Testing Activity WWTP County: Perquimans Month: November Year: 2023 Did irrigation Field Name: 1 Field Name: 2 Field Name: 3 Field Name: 4 occur facility? Area (acres): 1.46 Area (acres): 1.14 Area (acres): 1.38 Area (acres): 1.29 at this Cover Crop:Cover Crop: p� Cover Crop: p: Cover Crop: p: EYFS i NO Hourly Rate (in): 0.5 Hourly Rate (in): 0.5 Hourly Rate (in): 0.5 Hourly Rate (in): 0.5 Annual Rate (in): 57.2 Annual Rate (in): 57.2 Annual Rate (in): 57.2 Annual Rate (in): 57.2 Weather Freeboard Field Irrigated? DYES F]NO Field Irrigated? EYES ONO Field Irrigated? EYES LNo Field Irrigated? ❑YES JNO �, o y a U M m E a E F C ° :° Q d a` m o fn m °' am N Q O 10 Ln a E °' 3 a � Q a m °� E ~ - rn > c 'm ❑ J E m >> c X o M= 0 2 v o E D a s > Q a m2 _ ca E ~ - rn "r_ M 0 E a) = TC E 3 X o m = J o E d a a � Q v yy; E rn H` - rn a,c v M I O 0 J E rn = c E� m = 0 J am •o E. L 3 a O a Q N E co _ F _ 0) C a a m 0 0 J E rn C C E a t0 S 0 J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 42 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 C 37 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 C 35 0 3.5 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 1 0 0.00 0.00 0 0 0.00 0-00 0 0 0.00 0.00 0 0 0.00 0.00 5 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 C 45 0 2,896 45 0.07 0.07 2,896 45 0.09 0.09 2,896 45 0.08 0.08 2,896 45 0.08 0.08 7 C 56 0 2,899 45 0.07 0.07 2,899 45 0.09 0.09 2,899 45 0.08 0.08 2,899 45 0.03 0.08 8 C 1 56 0 2,917 45 0.07 0.07 2,917 45 0.09 0.09 2,917 45 0.08 0.08 2,917 45 0.08 0.08 9 C 58 0 2,598 40 0.07 0.07 2.598 40 0.08 0.08 2,598 40 0.07 0.07 2,598 40 0.07 0.07 10 H 0.2 3.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 39 0 3,847 60 0.10 0.10 3,847 60 0.12 0.12 3,847 60 0.10 0.10 3,847 60 0.11 0.11 14 C 39 0 3,852 60 0.10 0.10 3,852 60 0.12 0.12 3,852 60 0.10 0.10 3,852 60 0.11 0.11 15 PC 41 0 1,829 30 0.05 0.05 1,829 30 0.06 0.06 1,829 30 0.05 0.05 1,829 30 0.05 0.05 16 C 43 0 1,316 20 0.03 0.03 1,316 20 0.04 0.04 1,316 20 0.04 0.04 1.316 20 0.04 0.04 17 C 48 0 3.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 18 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 19 0 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 a00 201 C 1 34 0 2,895 45 0.07 0.07 2,895 45 0.09 0.09 2,895 45 0.08 0.08 2,895 45 0.08 0.08 21 PC 61 0 3,830 60 0.10 0.10 3,830 60 0.12 0.12 3,830 60 0.10 0.10 3.830 60 0.11 0.11 22 R 61 2 0 0 0.00 0.00 0 0 0.00 0-00 0 0 0.00 0.00 0 0 0.00 0.00 23 H 0 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 C 48 0 3.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 0 0 0 0.00 1 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 26 0.55 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 CL 48 0 3,846 60 0.10 0.10 3,846 60 0.12 0.12 3,846 60 0.10 0.10 3,846 60 0.11 0.11 28 C 32 0 3,850 60 0.10 0.10 3,850 60 0.12 0.12 3,850 60 0.10 0.10 3,850 60 0.11 0.11 29 C 27 0 3,862 60 0.10 0.10 3,862 60 0.12 0.12 3,862 60 0.10 0.10 3,862 60 0.11 0.11 30 C 31 0 3.5 1,280 20 0.03 0.03 1,280 20 0.04 0.04 1,280 20 0.03 0.03 1,280 20 0.04 0.04 31 Monthly Loading: 41,717 1.05 41.717 1.35 41,717 1.11 41,717 1.19 12 Month Floating Total (in): 13.45 17.21 14.24 15.20 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _;� of_I— Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? DCompliant ❑Non -Compliant Elcompliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant (]Compliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Perm ittee Certification ORC: Dustin B. Combs Permittee: Harvey Point Defense Testing Activity Certification No.: 1007989 Signing Official: Stephan Oltjen Grade: SI Phone Number: 252-562-2684 Signing Officials Title: Enviromental Safety Officer Has the ORC changed since the previous NDAR-1? ❑yes 2No Phone Number: 252-426-4250 Permit Exp.: 2/28/30 / l i9-A3 Signature Date Signature Date By this signature, I certify that this report is accurrale and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617