HomeMy WebLinkAbout20071560 Ver 1_Approval Letter_20071101O~O~ W AT ~9pG
r
~ _ ~ _~ -I
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
November 1, 2007
Mr. Sid Cutts
Redtail-Gaston, LLC
941 Meadow Lane
Henderson, NC 27536
Re: Eaton's Crossing, Warren County
DWQ #20071560; USACE Action ID. No. 2007-3014
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Cutts:
Attached hereto is a copy of Certification No. 3709 •ssu~d to Mr. Sid Cutts and Redtail-Gaston, LLC,
dated November 1, 2007. In addition, you should get any other federal, state or local permits before you
go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control,
Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations.
If we can be of further assistance, do not hesitate to contact us.
CHS/cbk/ijm
Sincerely,
Coleen H. Sullins
Attachments: NCDWQ 401 WQC Summary of Permanent Impacts and Mitigation Requirements
Certificate of Completion
cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789
U.S. Army Corps of Engineers, Raleigh Regulatory Field Office, Wilmington District, USACOE
Lauren Witherspoon, DWQ, Raleigh Regional Office
DLR Raleigh Regional Office
File Copy ~ ~~.;,.
Central Files
Kerr Environmental Services Carp., 1008 Old Virginia Beach Road, Suite 200, Virginia Beach, VA 23451
Filename: 071560EatonsCrossing(Warrenr)401_IC
401 OversighUExpress Review Permits Unit
1650 Mail Service Center, Winston-Salem, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Winston-Salem, North Carolina 27604
Phone: 919-733-17861 FAX 919-733-689311ntemet: http://h2o.enr.state.nc.us/ncwetlands
Non` Carolina
~tura!!y
An Equal OpportunitylAffirmative Action Employer- 50% Recycledl10% Post Consumer Paper
Mr. Sid Cutts and Redtail-Gaston, LLC
Page 2 of 4
November 1, 2007
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
THIS CERTIFICATION is issued in conformity wi~fi'-':t1Y~ requirements of Section 401 Public Laws 92-
500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ)
Regulations in 15 NCAC 2H, Section .0500 to Mr. Sid Cutts and Redtail-Gaston, LLC, to construct .the
Eaton's Crossing Shoreline Redevelopment project, consisting of five, 20-slip boathouses, two and 10-slip
day dock structures (120 total slips), and the resurfacing and repair of an existing 17-foot x 20-foot boat
ramp (0.0086 acres), along approximately 6,500 linear feet of shoreline on Lake Gaston, which is located
just wet of the southern end of Eaton's Ferry bridge and Eaton's Ferry Marina, and east of the River Forest
residential development, west of NC Highway. 903, on the southern shore of Lake Gaston, north of
Littlejohn, Warren County North Carolina, pursuant to an application dated September 11, 2007 and
received by the DWQ on September 26, 2007, by Public Notice by the U.S. Army Corps of Engineers
issued on the 26"' day of September of 2007 (received by DWQ on September 25, 2007).
The application and supporting documentation provides adequate assurance that the proposed work will
not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the
State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,
302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the
supporting documentation, and conditions hereinafter set forth.
This approval is only valid for the purpose and design submitted in the application materials and as
described in the Public Notice. If the project is changed, prior to notification a new application for a new
Certification is required. If the property is sold, the new owner must be given a copy of the Certification
and approval letter and is thereby responsible for conjilyng with all conditions of this Certification. Any
new owner must notify the Division and request the Certification be issued in their name. Should wetland
or stream fill be requested in the future, additional compensatory mitigation may be required as described
in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a
change in stream or wetland impact or an increase in impervious surfaces, the DWQ-shall be notified in
writing and a new application for 401 Certification may be required. For this approval to be valid,
compliance with the conditions listed below is required.
Conditions of Certification:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
.T a of Im act Amount A roved Units Plan Location or Reference
O en Water Lake _ 0.0086 (acres) -Boat Ramp Redevelopment Application and Public Notice
Sediment and Erosion Control:
2. Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
Mr. Sid Cutts and Redtail-Gaston, LLC
Page 3 of 4
November 1, 2007
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur;
4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction
corridor within these boundaries approved under this authorization shall be clearly marked with
orange warning fencing (or similar high visibility material) for the areas that have been approved to
infringe within the buffer, wetland or water prior to any land disturbing activities to ensure
compliance with 15A NCAC 2B .0259;
6. No work may be conducted in Lake Gaston between March 1 and June 30.
Continuing Compliance:
7. Mr. Sid Cutts and Redtail-Gaston, LLC shall conduct construction activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with section 303(d) of the Clean Water Act)` and any other appropriate requirements
of State law and federal law. If the Division determines that such standards or laws are not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is
being violated, or that further conditions are necessary to assure compliance, the Division may
reevaluate and modify this Certification to include conditions appropriate to assure compliance
with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before
modifying the Certification, the Division shall notify Mr. Sid Cutts and Redtail-Gaston, LLC, and
the US Army Corps of Engineers, provide Ilublic notice in accordance with 15A NCAC 2H.0503
and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or
revised conditions shall be provided to Mr. Sid Cutts and Redtail-Gaston, LLC, in writing, shall
be provided to the United States Army Corps of Engineers for reference in any Permit issued
pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404
Permit for the project;
8. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and. any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Mr. Sid Cutts and Redtail-Gaston, LLC
Page 4 of 4
November 1, 2007
Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written
request within sixty (60) days following receipt of this~ertification. This request must be in the form of a
written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If
modifications are made to an original. Certification, you have the right to an adjudicatory hearing on the
modifications upon written request within sixty (60) days following receipt of the Certification. Unless
such demands are made, this Certification shall be final and binding.
3709
CHS/cbk/ijm
This the 1 S` day of Novem r 2007
D1V ION O W ALITY
Coleen H. Sullins
.P,
Certification of Completion
DWQ Project No.: County:
Applicant:
Project Name:
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due -care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Agent's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional ~'
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Date:
hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Signature: Registration No. Date