From: James Meachum <JMeachum@kcaeng.com>
Sent: Thursday, December 21, 2023 4:55 PM
To: Conchilla, Ryan; Euliss, Amy; Smith, Thomas A
Cc: Shaver, Larry B; Trantham, Darren K; Sawicki (Gannett Fleming), Jeremy P; Hal Stultz
Subject: [External] Sediment Loss Clean Up
Attachments: Site 1 Repairjpg; Site 13 (2) Repairjpg; Site 13 Outfalljpg
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
These are the photos of the cleanup, and repair that was completed today. If there is anything else you need let me
know.
C204633/ U2579AB
Date:12/17/2023
Date Completed: 12/21/2023.
Location: Site 1 (Sta-Y4RPB-Rt 20+00)
Rain event: 1.84 "
Estimated Loss: 10 buckets.
Did the Loss Occur in the Sream/Wetland: Yes
Length Of Loss: 45'
Cause: SDO overwhelmed, Basin overtopped
Corrective Action: stabilize the area with fabric.
Timeline for Repair: 1 day, almost complete
Before Photo: See Photos
After Photo: See Photos of completion.
Date:12/17/2023
Date Completed: 12/21/23.
Location: Site 13 (Sta 833+00 L-Line- Lt)
Rain event: 1.84"
Estimated Loss: 12 Buckets
Did the Loss occur in the Stream/Weland: yes
Length Of Loss: 40'
Cause: Fabric undermined and washed-out weir of basin
Corrective Action: Repair basin, remove sediment at end of pipe, place inlet ring around pipe.
Timeline For Repair: 1 Day
Before Photo: See Photos
After Photo: See Photos of completion.
James Meachum
Transportation Engineer V
Email: JMeachum(cDkcaeng.com
Office: 704.932.2122
Cell: 336.813.5300
305 S. Main St., Kannapolis, NC 28081
CONFIDENTIALITY NOTE: This communication may be privileged and confidential. It should not be disseminated to others. If received in error, please
immediately reply that you have received this communication in error and then delete it. Thank you.