Loading...
HomeMy WebLinkAbout_External_ Sediment Loss Clean UpCarpenter, Kristi From: James Meachum <JMeachum@kcaeng.com> Sent: Thursday, December 21, 2023 4:55 PM To: Conchilla, Ryan; Euliss, Amy; Smith, Thomas A Cc: Shaver, Larry B; Trantham, Darren K; Sawicki (Gannett Fleming), Jeremy P; Hal Stultz Subject: [External] Sediment Loss Clean Up Attachments: Site 1 Repairjpg; Site 13 (2) Repairjpg; Site 13 Outfalljpg CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. These are the photos of the cleanup, and repair that was completed today. If there is anything else you need let me know. C204633/ U2579AB Date:12/17/2023 Date Completed: 12/21/2023. Location: Site 1 (Sta-Y4RPB-Rt 20+00) Rain event: 1.84 " Estimated Loss: 10 buckets. Did the Loss Occur in the Sream/Wetland: Yes Length Of Loss: 45' Cause: SDO overwhelmed, Basin overtopped Corrective Action: stabilize the area with fabric. Timeline for Repair: 1 day, almost complete Before Photo: See Photos After Photo: See Photos of completion. Date:12/17/2023 Date Completed: 12/21/23. Location: Site 13 (Sta 833+00 L-Line- Lt) Rain event: 1.84" Estimated Loss: 12 Buckets Did the Loss occur in the Stream/Weland: yes Length Of Loss: 40' Cause: Fabric undermined and washed-out weir of basin Corrective Action: Repair basin, remove sediment at end of pipe, place inlet ring around pipe. Timeline For Repair: 1 Day Before Photo: See Photos After Photo: See Photos of completion. James Meachum Transportation Engineer V Email: JMeachum(cDkcaeng.com Office: 704.932.2122 Cell: 336.813.5300 305 S. Main St., Kannapolis, NC 28081 CONFIDENTIALITY NOTE: This communication may be privileged and confidential. It should not be disseminated to others. If received in error, please immediately reply that you have received this communication in error and then delete it. Thank you.