HomeMy WebLinkAboutNCC240105_ESC Approval Submitted_20240117 11) Iredell County Planning & Development Erosion Control Section I R E D E L L 349 North Center Street c0UNTY P.Q. Box 788 Statesville, NC 28687 Date: December 28th 2023 LETTER OF APPROVAL WITH MODIFICATIONS Brad Robison Lake Life Properties, LLC 1315 Graham Woods Dr. Mt. Ulla,NC 28125 RE: Project Name: Peyton's Creek Subdivision Acres Approved with Modifications: 21.25 Project ID: IREDE-2024-052 Project Location: PIN 4711448752.000 Submitted By: Jordan Grant ESP Date Received: December 19'h 2023 Plan Type: New Dear Mr. Robison: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Peyton's Creek Subdivision December 28th 2023 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, e. it____ ‘.../c7k._________. onathan Williams, CESSWI Erosion Control Coordinator Enclosures: Modifications Fact Sheet on the New NCGO1 Permit Permit Letter of Approval with Modifications Peyton's Creek Subdivision December 28`h 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Peyton's Creek Subdivision Project ID: IREDE-2024-052 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. I. Delineate stream disturbance areas on the plan. Notate on the plan and construction sequence that stream will not be disturbed until required 401/404 permits have been obtained and a copy of permits have been provided to Iredell County Erosion Control. — RC 2. Remove limits of disturbance from neighboring property to the South on sheet C503.— RC 3. Close silt fence gaps and install silt fencing along the limits of disturbance edge where grade drains offsite,to the on-site stream and to Laurel Cove Road right-of-way. —RC 4. Design Trap I so that treated water discharge does not travel across disturbed and unprotected ground in order to leave the limits of disturbance. —RC 5. If clean water bypass is installed prior to the stabilization of upslope areas draining to the bypass, the bypass must be protected so that no sediment can enter the bypass. Notate installation in construction sequence.—RC 6. To the south of the proposed subdivision road, design entire stormwater bypass discharge area so that it is completely stabilized and protected. -RC