Loading...
HomeMy WebLinkAbout20150994 Ver 1_401 Application_20150915FA M - .._._._ 201 5099 Pre - Construction Notification: NWP- 12 /WQC 3884 Line T -01 Pipeline Replacement Project September 23, 2015 �n !oz — o ,x U.S. Army Corps of Engineers LZ_, a� a Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801 LU C/) s� Attention: Mr. David Brown, P.G. loG N.C. Division of Water Resources 401 Wetlands Unit 512 North Salisbury Street Raleigh, North Carolina 27604 Attention: Ms. Karen Higgins Reference: Pre - Construction Notification: NWP No. 12/WQC No. 3884 Line T -01 Pipeline Replacement Project Polk, Henderson and Buncombe Counties, North Carolina S &ME Project No. 7335 -15 -005 Dear Mr. Brown and Ms. Higgins: On behalf of our client, PSNC Energy (PSNC), S &ME, Inc. (S &ME) is pleased to submit this application for impacts to Waters of the U.S. in accordance with Nationwide Permit (NWP) No. 12 and the corresponding North Carolina Water Quality Certification (WQC) No. 3884. The proposed project will involve replacement of approximately 26 miles of natural gas pipeline with a new line that is compliant with current federally- mandated requirements. This PCN is being provided to the U.S. Army Corps of Engineers (USACE) for approval, and complies with all applicable conditions of NWP No. 12. Written concurrence from the North Carolina Division of Water Resources (NCDWR) is also required in part because the proposed project does not meet condition numbers 10 and 16 of WQC No. 3884, as specified below: Condition No. 10: The proposed gas line will not cross all streams within the project corridor at a near - perpendicular angle because a majority of the project will be installed within the existing Line T -01 utility easement. Because the existing utility easement does not cross all streams within the tolerance identified in the aforementioned WQC, the proposed project will also not meet this requirement. Condition No. 16: The proposed project will require a combined temporary and permanent construction easement greater than 40 -foot wide at stream and wetland crossings where the pipe will be installed. In upland areas, the work will occur within a 75 -100 foot corridor, which will be narrowed to the aforementioned 50 feet at stream /wetland crossings. In these areas, a 50 -foot wide easement is required to safely accommodate the equipment and work space necessary to install the 20 -inch pipe. Up to two other existing pipelines are present within portions of the existing maintained easement. The 50 -foot S &ME, Inc. 19751 Southern Pine Blvd I Charlotte, NC 28273 1 p 704.523.4726 1 f 704.525.3953 1 www.smeinc.com