Loading...
HomeMy WebLinkAbout20140820 Ver 6_Mitigation As-Built Plans_20240109Summary of Comments on CarrawayBluffAsBuilt_DWR Review.pdf Page: 3 *Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:37:00 AM What is the status of the DMS project? This should always be provided in an asbuilt report where the bank is set up adjacent to a DMS project. Page: 5 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:38:18 AM as a general comment, this should be worded "riparian restoration" for buffer mitigation and or nutrient offset. the term "buffer" should only be used to describe restoration within the "Zone 1 and Zone 2 of the Neuse buffer which is only the first 50'. Page: 6 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:39:42 AM What was the purpose for needing supplementing planting, additional easement signage, livestaking, etc which are described in this paragraph? QNumber: 2 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:41:57 AM the AsBuilt report always needs to reference the DWR site visit for the Task 2 credit release where DWR provides an onsite inspection to confirm site is compliance with the approved Plan. the Report needs to also indicate what was done as a result of that DWR site inspection. What was the result of the asbuilt inspection performed by DWR and include any and all correspondence related to that site visit in your response. NOT TO I. ELI$AaETH ANDTURNER AS A DULY REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE pF ` NORTH CAROLIN . CERTIFY THAT THIS BUFFER MAP WAS DRAWN UNDER MY SUPERVISION, IS AN ACCURATE AND COMPLETE REPRESENTATION OF YHAT THE WHAT WAS CONSTRUCTED IN THE ;LOW EASEMENT BOUNDARY IS BASED ON PLAT 80OK SEE PG NOTES RECORDED IN WAYNE COUNTY REGISTER • x.—x x x OF DEEDS OFFICE, AND THAT THE BUFFER AREAS SHOWN ARE CALCULATED FROM AS�LIILT CONDITIONS EXCEPT WHERE OTHERWISE HATED HEREON. WITNESS MY ORIGINAL SIGNATURE, REGISTRATION NUMBER, AND SEAL THIS 31sI DAY OF MY 2023 I -i-1-I-I-I 171 ELISABETH G TURNER. PL.6-*L.4MO _ SEAL =[n A L-4440 a x5 =r Si1RN•'Ji IICI 5EE SHEET 2 FOP, GEN ERAI NOTES Riparian Buffer Credit: M FT. Acres Streams & Ditches 27,573 0.633 Riparian Restoration T1 6,185 0.142 = 0'-100' (Subject) Riparian Restoration 184,330 4.232 101'-200' (Subject) Riparian Restoration 155,811 3.577 0'-100' (Non -Subject) Riparian Restoration 110,231 2.53 (Nan -Subject) 31'-200' Nutrient Offset 4 90,688 2.082 0'-100' (Subject) _ N utrient Offset 308,932 7.092 101'-200' (Subject) N utrient Offset 100,811 2.314 0'-100' (Non -Subject) N utrient Offset 74,138 1.702 101'-200' (Non -Subject) N utrient Offset 172,140 3.952 0'-100' (Non -Subject, Ditch) N utrient Offset 196,707 4.516 101'-200' (Non -Subject, Ditch) Riparian Preservation 25,273 0.58 0'-100' (Nan -Subject) Riparian Preservation 10,532 0.242 101'-200' (Non -Subject) No Credit 17,959 0,4123 Total CE Area 1,481,311 34.006 yx • x •x ^ x•ex • r� xY x�yx x x�•x �x•R ."w"iW ►�'� Ixxxxxx I x x x x x -p x x Ix • . W " . y . " . x x f W LINE LEGEND: _ 8x ;: —GE—CONSERVATION EASEMENT BANK - ITi x �i " —PROPERTY LINE -' I =T' ` x x r " " CARRAWAY '�� I I�i'i' x -----------TOP OF BANK (BY OTHERS) y r . a I I , ! I x x xx w CREEK T CONSERVATION L EASEMENT pM5 . I I xxX.x .1.' �� 1 x x -I-I fr I—TTT±Tr- x x i 7'1­115 MAP 15 1"30T FOR RECORDATION, 5AL.E5, OR CONVEYANCt75 AND DOES NOT •'__�----- COMPLY WITH G.5. 47-30 f -` MAPPING REQUIREMENT5. i-�-I- -l-3 r x x a x 1 -'-' MATCHLNE TDB tvv'r+rW —xxx • �\ 250' 0' 250' I r' SCALE: 1 inch - 250 Feet (11 x17) i o r w AS -BUILT SURVEY OF BUFFER AREAS FOR CARRAWAY BLUFF PH II MITIGATION SITE P.O. BOX 145 5WANNANOA, NC 26778 I 1W4iW (919) 829-9909 N � $Inp OWR Prgect No. 2014.0820 V6 NEUSE RIVER BASIN w .rc5.u5 S N �'' BRpGOEN TOWNSHIP WAYNE COUNTY NORTH CA1iOL1NA F-142b a11 0 Page: 10 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:48:26 AM while "Subject vs Non -Subject" is correct and luckily works for this specific project, it should say "Stream -Subject" and "Stream-NonSubject" since you do have ditches too. keep this in mind for future surveys QNumber: 2 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:43:13 AM i will accept this survey this time. but make sure future surveys have a little more information - see comments QNumber: 3 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:46:27 AM since there isn't a bolded title here for "Nutrient Offset Credit" like there is above for "Riparian Buffer Credit", the survey should have split these up to "Nutrient Offset Credit". moving Riparian Preservation up to Riparian Buffer Credit. QNumber: 4 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:52:44 AM whilejust saying "Nutrient Offset" luckily works for this specific project and i understand what is being referred to, this would not suffice for other projects or if reviewed by others in DWR. It should say "Riparian Restoration" instead of "Nutrient Offset", or "Riparian Enhancement", etc. When dividing the table up by RBC at the top (like it is currently shown) and then by dividing the rest into "Nutrient Offset Credit" (which is not shown but is a comment i have made on this survey above", we would know that all these "Riparian Restoration" areas are devoted to Nutrient Offset Credit. Just saying "Nutrient Offset" can lead to missing important and relevant information needed to compare with the corresponding Project Credit Table and Credit Map. For future, make sure that the mitigation activity "Restoration, Enhancement, Cattle Excl, or Preservation" is how the survey depicts yoru credit areas. QNumber: 5 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:44:49 AM this needs to be explained in the Text of your AsBuilt report .... some of this is for non -diffused flow but the rest? Explain where the 17,959 and why it's "no credit" area. Page: 12 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:58:21 AM Mitigation activity is missing from the map. Revise the figure to tell me what the mitigation activity is for each color (Riparian restoration? Riparian Enhancement?, etc). Make sure to keep the "Riparian" in the naming of the activity. The project credit table has a column titled "Mitigation Activity". This needs to match with this Figure in all AsBuilt Reports. It should say on the legend: Riparian Restoration for RBC or Riparian Restoration for NOC or Riparian Preservation for RBC, etc.... You can also get creative on how you display this in the legend. it could just say Riparian Buffer Credit and then all the colors representing RBC or then listed as "Riparian Restoration..." or "Riparian Preservation" and then you wouldn't need to say ...."for RBC" or "for NOC". but as the legend is currently depicting your credit areas, my first comment is based on the current layout you have. Page: 13 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:59:30 AM credit table is accurate. just keep in mind the comments made on Figure 3 and on the signed Survey to make sure your future asbuilt reports are done correctly U U Page: 19 QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/9/2024 9:36:18 AM Which culvert is this? Isn't it along one of the streams? if so, this culvert appears to be perched in elevation, thus hindering the flow of the stream and impacting aquatic life passage. this culvert needs to be inspected for compliance and confirmation provided to DWR. It is suggested that the provider contact the Washington Regional Office to have an inspection of the culvert installation for compliance. If deemed to be not in compliance, this culvert will have to be fixed.