Loading...
HomeMy WebLinkAboutWQ0003067_Compliance Evaluation Inspection_20220722Compliance Inspection Report Permit: WQ0003067 Effective: 09/18/17 Expiration: 08/31/22 Owner : C & P Enterprises Inc SOC: Effective: Expiration: Facility: Ocean Bay Villas & Ocean Glen Condos WWTI County: Carteret 650 Salter Path Rd Region: Wilmington Pine Knoll Shores NC 28512 Contact Person: Daniel Edward Fortin Title: Phone: 252-393-8720 Directions to Facility: Facility is on the north side of NC Hwy. 58, approximately 2.5 miles west of the NC Aquarium at Pine Knoll Shores. System Classifications: WW2, Primary ORC: Daniel Edward Fortin Certification: 7180 Phone: 252-393-8720 Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/12/2022 Entry Time 12:OOPM Exit Time: 01:OOPM Primary Inspector: Tyler G Benson Phone: 910-796-7336 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: High Rate Infiltration Facility Status: Compliant ❑ Not Compliant Question Areas: Treatment Flow Measurement -Effluent Treatment Flow Measurement -Influent Miscellaneous Questions Treatment Flow Measurement -Water Treatment Filters Record Keeping Use Records Treatment Activated Sludge Treatment Sludge Storage/Treatment Treatment Influent Pump Station Treatment Clarifiers Treatment Disinfection End Use -Infiltration Treatment Flow Measurement Treatment Return pumps Standby Power Wells (See attachment summary) Page 1 of 7 Permit: WQ0003067 Owner - Facility: C & P Enterprises Inc Inspection Date: 04/12/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: A Compliance Evaluation Inspection was conducted at the Ocean Bay Villas & Ocean Glen Condos WWTP by Tyler Benson (DWR). Mr. Dan Fortin (ORC) and staff of Fortin Contract Services were present during the inspection. Due to record files not present at the time of the on -site inspection, these documents were reviewed on July 21, 2022. Upon entering the WWTP, it appears that the access steps are damaged and potentially pose a safety -concern for operators. Infrastructure should be evaluated for structural integrity to provide safe -working conditions. The permanent generator for the facility was noted on the previous inspection report to be previously damaged beyond repair per Powerhouse Generator Services. The facility has since replaced this damaged generator with one that is operational. In summary, the following items to be addressed in the near -future: - The dosing tank only has one of 2 pumps operational - Solids have accumulated at the bottom of the chlorine contact chamber - The Ocean Side Pump Station's control panel is having electrical issues per ORC - Our system does not indicate a received renewal application for the permit. This permit expires August 31, 2022.Per condition 1.1, a renewal application is to be submitted prior to 6-months of the expiration date. Please confirm this renewal application has been submitted. Page 2 of 7 Permit: WQ0003067 Owner - Facility: C & P Enterprises Inc Inspection Date: 04/12/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Type Yes No NA NE Reuse (Quality) ❑ Lagoon Spray, LR ❑ Single Family Spray, LR ❑ Activated Sludge Spray, LR ❑ Activated Sludge Spray, HR ❑ Activated Sludge Drip, LR ❑ Recycle/Reuse ❑ Single Family Drip ❑ Infiltration System Treatment Influent Pump Station Yes No NA NE Is the pump station free of bypass lines or structures? ❑ ❑ ❑ Is the general housekeeping acceptable? ❑ ❑ ❑ Are all pumps present? ❑ ❑ ❑ Are all pumps operable? ❑ ❑ ❑ Are floats/controls operable? ❑ ❑ ❑ Are audio and visual alarms available? ❑ ❑ ❑ Are audio and visual alarms operational? ❑ ❑ ❑ # Are SCADA/Telemetry alarms required? ❑ ❑ ❑ Are SCADA/Telemetry available? ❑ ❑ ❑ Are SCADA/Telemetry operational? ❑ ❑ 0 ❑ Comment: The ORC has indicated that the Ocean Side control panel is having issues associated with DumD alteration and should be addressed. Treatment Flow Measurement -Influent Yes No NA NE Is flowmeter calibrated annually? ❑ ❑ ❑ Is flowmeter operating properly? ❑ ❑ ❑ Does flowmeter monitor continuously? ❑ ❑ ❑ Does flowmeter record flow? ❑ ❑ ❑ Does flowmeter appear to monitor accurately? ❑ ❑ ❑ Comment: Treatment Flow Measurement -Water Use Records Yes No NA NE Is water use metered? ❑ ❑ ❑ Are the daily average values properly calculated? ❑ ❑ 0 ❑ Comment: Page 3 of 7 Permit: WQ0003067 Owner - Facility: C & P Enterprises Inc Inspection Date: 04/12/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Treatment Flow Measurement -Effluent Yes No NA NE Is flowmeter calibrated annually? 0 ❑ ❑ ❑ Is flowmeter operating properly? ❑ ❑ ❑ Does flowmeter monitor continuously? 0 ❑ ❑ ❑ Does flowmeter record flow? 0 ❑ ❑ ❑ Does flowmeter appear to monitor accurately? 0 ❑ ❑ ❑ Comment: Standby Power Yes No NA NE Is automatically activated standby power available? ❑ ❑ ❑ Is generator tested weekly by interrupting primary power source? ❑ ❑ ❑ Is generator operable? ❑ ❑ ❑ Does generator have adequate fuel? 0 ❑ ❑ ❑ Comment: Treatment Activated Sludge Yes No NA NE Is the aeration mechanism operable? 0 ❑ ❑ ❑ Is the aeration basin thoroughly mixed? 0 ❑ ❑ ❑ Is the aeration equipment easily accessed? ❑ ❑ ❑ Is Dissolved Oxygen adequate? ❑ ❑ ❑ Are Settleometer results acceptable? ❑ ❑ ❑ Is activated sludge an acceptable color? ❑ ❑ ❑ Comment: Treatment Clarifiers Yes No NA NE Are the weirs level? ❑ ❑ ❑ Are the weirs free of solids and algae? ❑ ❑ ❑ Is the scum removal system operational? ❑ ❑ ❑ Is the scum removal system accessible? ❑ ❑ ❑ Is the sludge blanket at an acceptable level? ❑ ❑ ❑ Is the effluent from the clarifier free of excessive solids? ❑ ❑ ❑ Treatment Return pumps Yes No NA NE Are they in place? 0 ❑ ❑ ❑ Are they operational? 0 ❑ ❑ ❑ Comment: Treatment Filters Yes No NA NE Is the filter media present? 0 ❑ ❑ ❑ Page 4 of 7 Permit: WQ0003067 Owner - Facility: C & P Enterprises Inc Inspection Date: 04/12/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Is the filter media the correct size and type? ❑ ❑ ❑ Is the air scour operational? 0 ❑ ❑ ❑ Is the scouring acceptable? 0 ❑ ❑ ❑ Is the clear well free of excessive solids? 0 ❑ ❑ ❑ Is the mud well free of excessive solids and filter media? ❑ ❑ ❑ Does backwashing frequency appear adequate? 0 ❑ ❑ ❑ Comment: Treatment Sludge Storage/Treatment Yes No NA NE Is the aeration operational? ❑ ❑ ❑ ❑ Is the aeration pattern even? ❑ ❑ ❑ ❑ If required, are Sanitary "Ts" present in tankage? ❑ ❑ ❑ ❑ Comment: Treatment Disinfection Yes No NA NE Is the system working? 0 ❑ ❑ ❑ Do the fecal coliform results indicate proper disinfection? ❑ ❑ ❑ Is there adequate detention time (-30 minutes)? ❑ ❑ ❑ Is the system properly maintained? ❑ ❑ ❑ If gas, does the cylinder storage appear safe? ❑ ❑ ❑ Is the fan in the chlorine feed room and storage area operable? ❑ ❑ ❑ Is the chlorinator accessible? ❑ ❑ ❑ If tablets, are tablets present? ❑ ❑ ❑ Are the tablets the proper size and type? ❑ ❑ ❑ Is contact chamber free of sludge, solids, and growth? ❑ ❑ ❑ If UV, are extra UV bulbs available? ❑ ❑ ❑ If UV, is the UV intensity adequate? ❑ ❑ ❑ # Is it a dual feed system? ❑ ❑ ❑ Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)? ❑ ❑ ❑ If yes, then is there a Risk Management Plan on site? ❑ ❑ ❑ If yes, then what is the EPA twelve digit ID Number? (1000- - ) If yes, then when was the RMP last updated? Comment: Solids were observed in the bottom of the contact chamber and needs to be cleaned. Record Keeping Yes No NA NE Is a copy of current permit available? ❑ ❑ ❑ Are monitoring reports present: NDMR? ❑ 0 ❑ ❑ NDAR? ❑ 0 ❑ ❑ Page 5 of 7 Permit: WQ0003067 Owner - Facility: C & P Enterprises Inc Inspection Date: 04/12/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Are flow rates less than of permitted flow? 0 ❑ ❑ ❑ Are flow rates less than of permitted flow? 0 ❑ ❑ ❑ Are application rates adhered to? 0 ❑ ❑ ❑ Is GW monitoring being conducted, if required (GW-59s submitted)? 0 ❑ ❑ ❑ Are all samples analyzed for all required parameters? 0 ❑ ❑ ❑ Are there any 2L GW quality violations? ❑ 0 ❑ ❑ Is GW-59A certification form completed for facility? 0 ❑ ❑ ❑ Is effluent sampled for same parameters as GW? ❑ ❑ ❑ Do effluent concentrations exceed GW standards? ❑ ❑ ❑ Are annual soil reports available? ❑ ❑ 0 ❑ # Are PAN records required? ❑ ❑ 0 ❑ # Did last soil report indicate a need for lime? ❑ ❑ 0 ❑ If so, has it been applied? ❑ ❑ 0 ❑ Are operational logs present? 0 ❑ ❑ ❑ Are lab sheets available for review? ❑ 0 ❑ ❑ Do lab sheets support data reported on NDMR? 0 ❑ ❑ ❑ Do lab sheets support data reported on GW-59s? 0 ❑ ❑ ❑ Are Operational and Maintenance records present? 0 ❑ ❑ ❑ Were Operational and Maintenance records complete? 0 ❑ ❑ ❑ Has permittee been free of public complaints in last 12 months? ❑ ❑ ❑ Is a copy of the SOC readily available? ❑ ❑ 0 ❑ No treatment units bypassed since last inspection? ❑ ❑ ❑ ❑ Comment: Records were reviewed July 21, 2022. End Use -Infiltration Yes No NA NE # Is the application High Rate or Low Rate? High Rate Are buffers maintained? ❑ ❑ ❑ Are any supply wells within the CB? ❑ ❑ ❑ Are any supply wells within 250' of the CB? ❑ ❑ ❑ Is municipal water available in the area? 0 ❑ ❑ ❑ Are GW monitoring wells required? 0 ❑ ❑ ❑ Are GW monitoring wells located properly w/ respect to RB and CB? 0 ❑ ❑ ❑ Are GW monitoring wells properly constructed, including screened interval? ❑ ❑ ❑ Is a usable green area maintained? ❑ ❑ 0 ❑ Is the disposal site acceptable? 0 ❑ ❑ ❑ Is the distribution equipment acceptable? 0 ❑ ❑ ❑ Is the disposal site free of ponding? 0 ❑ ❑ ❑ Page 6 of 7 Permit: WQ0003067 Owner - Facility: C & P Enterprises Inc Inspection Date: 04/12/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Is the disposal site free of breakout? 0 ❑ ❑ ❑ Are the disposal sites free of solids, algae, etc.? 0 ❑ ❑ ❑ Do the records show that the fields are properly maintained? 0 ❑ ❑ ❑ Are the disposal sites free of vegetation? ❑ 0 ❑ ❑ Do any surface water features appear to be adversely impacted by GW discharge? ❑ 0 ❑ ❑ No chemicals or rototiller used to eliminate vegetation, solids, algae, etc.? 0 ❑ ❑ ❑ Comment: There was minor vegetation observed in the infiltration basin, which was already in the process of being addressed upon arrival. Page 7 of 7