Loading...
HomeMy WebLinkAboutNCC205659_Annual Fee NOD Letter (2023 Fee)_20240116 ROY COOPER _ ELIZABETH S.BISER Serrrrary WILLIAM E.TOBY VINSON,JR NOR•H CAROLINA rnrenm Drrtrrpr Environmental Quality 1/16/2024 Cates Building, Inc. Attn:Christopher Cates 639 Executive Place Suite 400 Fayetteville, NC 28305 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC205659-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 12/1/2023 and was due on 1/1/2024.The annual fee applies to the following construction site: Berlkee Estates Phase 1 S/D Lots 9,10,11&12 Legato Lane,Wake Forest, NC Wake County Certificate of Coverage No. NCC205659 NC Reference No. NCG01-2020-5659 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources 0-11 Q North Carolina Department of 1—irmmental Quality I Division o1 Energy.Mineral and lend Re—ea _ SR N-th Salisbury Street I Ib12 Mail Seri—Center Ralrgh,North Carolina Z7699 1612 w n..��....w� V 919.702.9200