HomeMy WebLinkAbout20160982 Ver 1_R3100B CP-4C Meeting Notes_07 22 2015_20150911 Hood, Donna From:Zerman, William S Sent:Friday, September 11, 2015 8:10 AM To:Steven.L.Kichefski@usace.army.mil; Johnson, Alan; Michael Batuzich (Michael.Batuzich@dot.gov); Marella Buncick (marella_buncick@fws.gov); Chambers, Marla J; Cynthia Van Der Wiele (vanderwiele.cynthia@epa.gov); loretta.a.beckwith@usace.army.mil; Dagnino, Carla S; Turchy, Michael A; Staley, Mark K; Baloch, Zahid M; Hoyle, Dennis (dennis.hoyle@aecom.com); Chandler, Reuben D; Noland, Kanchana V; Hood, Donna Cc:Stephens, William Subject:RE: R-3100B 4C Meeting Attachments:_R3100B CP-4C Meeting Notes_07 22 2015.pdf All, No one had any comments to incorporate into the 4c meeting minutes for R-3100B so they are now considered final. I have reattached them for your use. Bill William (Bill) S. Zerman, Jr. P.E. NCDOT Hydraulics Unit Project Manager, TIP West Divisions 10-14 (w-direct) 919-707-6755 (w) 919-707-6700 Mail: 1590 Mail Service Center, Raleigh, NC 27699-1590 Delivery: 1020 Birch Ridge Dr., Raleigh, NC 27610 From: Zerman, William S Sent: Monday, August 31, 2015 4:03 PM To: Steven.L.Kichefski@usace.army.mil; Alan Johnson (Alan.Johnson@ncdenr.gov); Michael Batuzich (Michael.Batuzich@dot.gov); Marella Buncick (marella_buncick@fws.gov); 'Chambers, Marla J'; Cynthia Van Der Wiele (vanderwiele.cynthia@epa.gov); loretta.a.beckwith@usace.army.mil; Dagnino, Carla S; Turchy, Michael A; Staley, Mark K; Baloch, Zahid M; Hoyle, Dennis (dennis.hoyle@aecom.com); Chandler, Reuben D; Noland, Kanchana V; Hood, Donna Subject: RE: R-3100B 4C Meeting All, See the attached 4c meeting notes for R-3100B for your review. Please review and send me back any comments you may have by 9/11/15. Thanks! Bill William (Bill) S. Zerman, Jr. P.E. NCDOT Hydraulics Unit Project Manager, TIP West 1 Divisions 10-14 (w-direct) 919-707-6755 (w) 919-707-6700 Mail: 1590 Mail Service Center, Raleigh, NC 27699-1590 Delivery: 1020 Birch Ridge Dr., Raleigh, NC 27610 From: Zerman, William S Sent: Friday, July 10, 2015 3:56 PM To: Steven.L.Kichefski@usace.army.mil; Alan Johnson (Alan.Johnson@ncdenr.gov); Michael Batuzich (Michael.Batuzich@dot.gov); Marella Buncick (marella_buncick@fws.gov); 'Chambers, Marla J'; Cynthia Van Der Wiele (vanderwiele.cynthia@epa.gov); loretta.a.beckwith@usace.army.mil; Dagnino, Carla S; Turchy, Michael A; Staley, Mark K; Baloch, Zahid M; Hoyle, Dennis (dennis.hoyle@aecom.com); Chandler, Reuben D; Charles R. Smith (crsmith5@ncdot.gov); Noland, Kanchana V Subject: R-3100B 4C Meeting All, See attached permit drawings for the scheduled 4C meeting on July 22ad from 9am to 10:30am. Also attached are the 4B meeting minutes. Bill William (Bill) S. Zerman, Jr. P.E. NCDOT Hydraulics Unit Project Manager, TIP West Divisions 10-14 (w-direct) 919-707-6755 (w) 919-707-6700 Mail: 1590 Mail Service Center, Raleigh, NC 27699-1590 Delivery: 1020 Birch Ridge Dr., Raleigh, NC 27610 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2 Minutes from the Interagency 4C Hydraulic Design Review Meeting State Project 34522.1.4 (R-3100B) in Catawba County F.A. Project: STP-0016(53) July 22, 2015 Team Members: Steve Kichefski, USACE (Phone) Marella Buncick, USFWS Marla Chambers, NCWRC Amy Chapman, NCDWR Donna Hood, NCDWR Carla Dagnino, NCDOT-NES Michael Turchy, NCDOT-NES Mark Staley, NCDOT-REU Zahid Baloch, NCDOT-PDEA Cynthia Van Der Wiele-USEPA Mitch Batuzich - FHWA Minutes: Introductions were made by all in attendance. Participants: Bill Zerman, NCDOT Hydraulics Charles Smith, NCDOT Hydraulics Larry Carpenter, NCDOT Div. 12 (Phone) Kanchana Noland, NCDOT Roadway James Swinson, NCDOT Utilities Laura Sutton, NCDOT SMU Claudia Lee, AECOM Bill Stephens, AECOM Bill Stephens and Claudia Lee proceeded through the permit drawings: General: - Request was made to separate out stream impacts from culvert impacts on the impact summary sheet for all sites. Sheet 5: - It was noted that temporary easements and additional stream impacts are needed on the inlet end of the proposed 6 ft. x 7 ft. RCBC due to construction phasing. Permits will be revised. - The width of the existing stream compared to the width of the proposed box culvert was questioned. It was determined from the iield visit notes that the stream width up and downstream are approximately the same as the width of the box culvert. Sheet 6: - It was recommended that baffles be placed in the proposed 9 ft. x 10 ft. RCBC to reduce the low flow width to that of the existing stream width. - It was questioned if a natural stream design was considered for the channel change on the upstream side of the proposed culvert. Notes from the 4B meeting indicated that stream stability would take precedence over achieving natural stream conditions. The existing sanitary sewer line located along the north side of the channel change would also limit a natural stream design. R-3100B Hydraulics Design 4C Meeting Notes Page 1 of 2 - Marla Chambers indicated she may conduct a field visit to Site 6 to observe the existing conditions. Sheet 7: - Pipe size across -Y4- is mislabeled. Should be a 60-in. CMP. Proiile will be included for this pipe in the revised permits. - Detail 33 Rip Rap at Embankment: Cl B rip rap will be revised to Cl I rip rap. Sheet 8: - The stability of the proposed outfall ditch to Site 6 was questioned due to steep natural ground slope along a portion of the ditch. NCDOT/AECOM will investigate options to stabilize the ditch in the steep segment of the ditch. Sheet 17: - It was suggested to consider a different type drainage structure at Site 4 to retain stream bed material instead of the proposed 60-in. reinforced concrete pipe. NCDOT/AECOM will investigate options and need for an alternate structure. - The single barrel proposed box culvert at Site 5 appears to be a 2-barrel culvert due to the centerline shown in the drawing. The centerline will be removed. No further comments. Meeting adjourned. R-3100B Hydraulics Design 4C Meeting Notes Page 2 of 2