HomeMy WebLinkAbout20221576 Ver 1_Compliance Inspection Letter_20240112Homewood, Sue From: Homewood, Sue Sent: Friday, January 12, 2024 5:00 PM To: jason.hartshorn@kimley-horn.com; Jason Steele; George.broder@haskell.com Cc: Bailey, David E CIV USARMY CESAW (USA); Capito, Rachel A CIV (USA); Lambert, David; Wooten, Samantha; Thomas, Zachary T; Morales, Kristina; Myers, Joseph M Subject: Vinfast - Sanford Utility Line Pre -construction Meeting Inspection Issues - DWR# 20221576 No On January 8, 2024 a pre -construction meeting was held between representatives for construction of the Vinfast Manufacturing Site, NCDOT Road Improvements, Sanford Utility Improvements, and staff from NCDWR and the US Army Corps of Engineers as required by USACE 404 permit SAW-XXXXXXX and 401 Individual Water Quality Certification #20221576. During the preconstruction meeting NCDWR staff conducted a location specific pre -construction discussion at Sta 4+00 within the Phase 1 Gravity Sewer Line as required by Condition #8 of the 401 Individual Water Quality Certification issued on December 1, 2023. Staff made the following observations: 1. Clearing activities had occurred for the Phase 1 sewer line from the East Lift Station to Sta 6+00. This area includes Impact 5-05 / 5-85 at approximately Sta 3+00 2. Erosion Control Measures (wattles) had been installed within the stream channel at this location. Staff observed that high flow activity was circumventing the wattles. 3. Evidence of equipment crossing through the channel was observed. 4. Vehicular activity across the upper portion of the stream had caused the stream to lose pattern form. These activities are not in compliance with the conditions of the 401. Instream erosion control measures may not create instability within streams or otherwise cause water quality violations. Equipment crossings are to be conducted in a manner that protects stream pattern, profile and dimensions. DWR staff discussed that the area should be re-evaluated after storms expected on Jan 9. As of today, DWR has not received these photos. Please send photos to DWR by Tuesday, Jan 16t". Upon review of the photos, DWR will determine whether the stream must be restored immediately or upon completion of the sewer line installation. In addition, it is essential that staff working on the project are aware of all permit conditions and expectations on protection of streams and wetlands during utility line construction. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office