Loading...
HomeMy WebLinkAboutSW6210909_Annual Certification Summary (2024)_20240112 Section A-Project Information Permit Number: SW6210909 Project Town/City: Fuquay Varina Project Name: Cotton Farms Phase 1 Project County: Harnett Permit issued: 11/1/2021 Project Status: underway Section B-Permittee Information Name: Reese Construction LLC Street Address: Mailing Address: Signing Official: Clint Reese 3720 Lucky Dr 3720 Lucky Dr Title: Manager Phone Number: 919-427-4685 Ext. Apex,NC 27539 Apex,NC 27539 Email Address: reeseconstruction@hotmail.com Section C-Property Owner Information Name: Reese Construction LLC Street Address: Mailing Address: Signing Official: Clint Reese 3720 Lucky Dr 3720 Lucky Dr Title: Manager Phone Number: 919-427-4685 Ext. Apex,NC 27539 Apex,NC 27539 Email Address: reeseconstruction@hotmail.com Section D-Site Conformance with Permitting Conditions Max BUA not exceeded? Yes Veg.setbacks per plans? Yes Site is as shown on plans? Yes SCM BUA not exceeded? Yes Easements recorded? Yes Designer Cart.submitted? NA Lot BUA not exceeded? Yes O&M Agreemt recorded? Yes O&M being performed? NA BUA as shown on plans? Yes O&M Agreemt on plats? Yes No maintenance issues? NA SCM/LD area per plans? Yes Deed Restrict.recorded? Yes Maint.records being kept? NA SCM/LD area accessible? Yes O&M done per E&SC? Yes Permit is active? Yes Stormwater outlets stable? Yes SCMs fixed when done? NA Other conditions met? Yes See Attachment A for a list of all N/A explanations to the above items. Section E-Plan to Bring the Project info Conformance Project is in conformance with all permit conditions. Section F-Project Certifier Information Certifier Signing: Clint Reese Street Address: Mailing Address: Title: Manager 3720 Lucky Dr 3720 Lucky Dr Phone Number: 919-427-4685 Ext. Email Address: Reeseconstruction@hotmail.com Apex,NC 27539 Apex,NC 27539 Section G-Certification The information in this form is true,accurate,and complete? Yes The project is in conformance with all permit conditions? Yes Electronically signed by Clint Reese on January 12,2024. ATTACHMENT A Explanation about why"N/A"items above are not applicable to this project. Max BUA not exceeded N/a: SCM BUA not exceeded N/a: Lot BUA not exceeded N/a: BUA as shown on plans N/a: SCM/LD area per plans Nla: SCM/LD area accessible N/a: Stormwater outlets stable N/a: Veg.setbacks per plans N/a: Easements recorded N/a: O&M Agreemt recorded Nla: O&M Agreemt on plats N/a: Deed Restrict.recorded N/a: O&M done per E&SC N/a: SCMs fixed when done N/a: SCMs are still being used as E&SC devices Site is as shown on plans N/a: Designer Cert.submitted N/a: SCMs are still waiting for conversion O&M being performed N/a: Awaiting conversion No maintenance issues N/a: Awaiting conversion Maint.records being kept N/a: Awaiting conversion Permit is active N/a: Other conditions met N/a: