Loading...
HomeMy WebLinkAboutSW5140801_Annual Certificate of Completion (2024)_20240111 CERTIFICATE OF COMPLETION Post-Construction Stormwater Annual Permit Certification This certifies that FRANCIS SLINSKY has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW5140801, NCNG Camp Butner Training Center ACFT, located in Butner, Granville County,on January 11,2024 in accordance with G.S. 143-214.7(b4). Please keep a copy of this certificate for your records.The electronic record will be stored in the Department of Environmental Quality's digital repository permit file. The Annual Permit Certification must be completed each year on or before the day of permit issuance, December 8. Failure to do so is a violation of your permitting conditions and is subject to enforcement action per G.S. 143-215.6. Jim Farkas State Stormwater Engineer Division of Energy, Mineral,and Land Resources