Loading...
HomeMy WebLinkAboutNCS000040_4Q2023 TSS Abatement & Maintenance_20240111 Eplin, Jerry W From: Pappalardo, Jenny L. <jpappalardo@charlottepipe.com> Sent: Thursday, January 11, 2024 10:37 AM To: Eplin, Jerry W Cc: Fedorko, Amanda C. Subject: [External] Charlotte Pipe - Charlotte, NC - 4Q2023 TSS Abatement & Maintenance Attachments: 2024-01.11 FINAL TSS Abatement & Maint 4Q2023.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Jerry, Please see attached the 4Q2023 TSS Abatement and Maintenance documentation for the Charlotte Pipe and Foundry facility in Charlotte, NC. Have a nice day. Thank you, Jenny Jenny Pappalardo CHARLOTTE PIPE ARID FOUNDRY COMPANY 1335 South Clarkson Street Charlotte, NC 28208 704.337.2783 i :HARUPT� PIPE and FOUNDRY COMPANY P.O. Box 35430 • Telephone 704/332-2647 CHARLOTTE, NORTH CAROLINA 28235 Foundry Fax No. 332-4581 January 11,2024 Jerry Eplin NCDEQ-Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,NC 28115 jerry.eplin@deq.nc.gov RE: Charlotte Pipe and Foundry Company-Cast Iron Division Stormwater Permit: NCS000040 SW TSS Abatement&Maintenance Quarterly Report(October-December 2023) Dear Jerry, As you may know,we have begun operating a new facility in Oakboro,NC.With the continual increase of production in Oakboro,we have ceased all melt&casting operations at our Charlotte facility. Therefore,filter insert changeouts were not necessary October-December 2023. Filters will continue to be checked and changed as necessary. Due to ceased melt&casting operations,many of the BMPs are no longer applicable. Charlotte Pipe will continue the following BMPs: • Pump stormwater sumps from the charging area and scrap yard to WWTP for treatment;and • Inspect,maintain&replace drain/sock inserts,as needed, around the facility. Please find attached the Filter Insert Maintenance Schedule for CY2023. An'©' represents a that the filter insert was checked but not changed;yellow highlight indicates when it is scheduled to be changed again. The most recent analytical results available is from sampling conducted in December 2023 (July-December 2023). Follow-up sampling will be conducted during the January-June 2023 timeframe. Please contact Jenny Pappalardo at (704) 348-5513 if you have any questions or need any additional information. Sincerely, U Jenny L. Pappalardo Charlotte Pipe and Foundry Co. Environmental Compliance Stormwater Insert Schedule Change ID# Location Schedule Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 SW1 Corner of Office Building 1/yr x SW2 Behind Slag Pile 1/6m x @ SW3 Water Treatment 1/6m x @ SW4 Corner of Substation&Rolo Laempe 1/6m x SW5 Corner of Substation&Rolo Electr Rm 1/6m x SW6 Oil House 1/6m x @ SW7 NPF Baghouse 1/6m x @ SW8 Sand Lab 1/6m x @ SW9 Oil House Hill 1/6m x SW10 Middle Oil House Hill 1/6m x @ SW11 Gas Pump 1/6m x SW12 HWS Baghouse 1/grtr x x x SW13 Alley @ HWS&Bath House 1/mo x x x x x x x x SW14 Alley @ Kitchen 1/mo x x x x x x x x SW15 Alley @ Cope&Drag 1/mo x x x x x x x x SW16 Alley @ Pattern Shop 1/mo x x x x x x x x SW17 Alley @ Laempe Entrance 1/mo x x x x x x x x SW18 Top Hill 1/yr SW19 E-Coat 1/yr x SW20 Behind Pipe 1/yr SW21 Rolocast Baghouse 1/6m x x x Insert Changed Scheduled Change @ Checked, but not changed