HomeMy WebLinkAbout20150954 Ver 1_More Info Received_20150923Montalvo, Sheri A
From: Travis Smith <Travis.Smith @burkenc.org>
Sent: Wednesday, September 23, 2015 9:36 AM
To: Montalvo, Sheri A
Subject: RE: corrected PCN -1 form for Western Piedmont Community College Hunting Creek
Project
Attachments: WPCC edited PCN -1 (2).pdf
From: Montalvo, Sheri A [mailto :sheri.montalvo @ncdenr.gov]
Sent: Wednesday, September 23, 2015 9:33 AM
To: Travis Smith <Travis.Smith @burkenc.org>
Subject: RE: corrected PCN -1 form for Western Piedmont Community College Hunting Creek Project
From: Travis Smith [ mailto :Travis.Smith(@burkenc.orR]
Sent: Wednesday, September 23, 2015 9:28 AM
To: Montalvo, Sheri A
Subject: corrected PCN -1 form for Western Piedmont Community College Hunting Creek Project
Again, sorry for the confusion first one, I have filled out, and thought had to list all the impacts. Thank you for letting me
fix the problem and emailing it back to you.
Thanks and have a great week!
Travis Smith
Soil and Water Conservationist
Burke County S &W Conservation District
Burke County Agricultural Building
130 Ammons Drive, Suite 3
Morganton, NC 28655
Phone: 828 - 439 -9727 ext.3
�U
1
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters
❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a.
2b. 2c.
2d.
2e.
Wetland impact
Type of impact
Type of wetland
Forested
Type of jurisdiction
number
3e. 3f.
3g.
Stream impact
Corps (404,10) or
Permanent (P) or
Type of Average
Impact
number
DWQ (401, other)
Temporary (T)
jurisdiction stream
length
Permanent (P) or
W1 -
Choose one
Choose one
Yes /No
-
W2 -
Choose one
Choose one
Yes/No
I -
W3 -
Choose one
125
Choose one
Yes /No
-
W4 -
Choose one
I
Choose one
Choose one
Yes/No
-
W5 -
Choose one
S4 -
Choose one
I
Yes/NO
I -
W6 -
Choose one I
Choose one
Yes /No
-
2g. Total Wetland Impacts:
2h. Comments:
2f.
Area of
impact
(acres)
3. Stream Impacts
If there are perennial or intermittent stream
impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c. 3d.
3e. 3f.
3g.
Stream impact
Type of impact
Stream name Perennial (PER) or
Type of Average
Impact
number
intermittent (INT)?
jurisdiction stream
length
Permanent (P) or
width
(linear
Temporary (T)
(feet)
feet)
S1 P
Excavation
Hunting Creek PER
I Corps -DWQ 25
125
S2 -
Choose one
PER
Corps -DWQ
S3 -
Choose one
PER
Corps -DWQ
S4 -
Relocation
I
PER Corps -DWQ
S5 -
Choose one
S6 -
Choose one
3h. Total stream and tributary impacts I
125
31. Comments:
Fill, Excavation, Stabilization, and Relocation overlap in several locations along the project reach. The total stream impacts are longer than
the project
reach.
Page 4 of 10
PCN Form — Version 1.4 January 2009