NC0036269_Report_20231219
309 East Morehead Street, Suite 220 Charlotte, NC 28202 T: 704.358.7204 December 19, 2023 Brown AMD Caldwell Ori Tuvia Environmental Engineer III NC DEQ/ Division of Water Resources/ Permitting 610 East Center Avenue Mooresville, NC 28115 157299 Subject: Construction Progress Report for the Phase 3 Expansion to 30 MGD at the Rocky River Regional Wastewater Treatment Plant (WWTP) Dear Mr. Tuvia Per the compliance schedule of paragraph A(7) of the NPDES permit NC0036269, we are submitting a brief report summarizing the progress of the construction project for the past calendar year (NTP date: May 31, 2022). The Rocky River Regional WWTP Phase 3 Expansion project includes the following major improvements and modifications: • New Influent Flow Equalization (EQ) Tank and Nitrification Enhancement Facility (NEF) • New Aeration Basin (AB) No. 6 • New Blower Building to house three new aeration blowers for AB No. 6 • New Effluent Parshall Flume • Raising of the walls of the existing Chlorine Contact Basins (CCBs) No. 1 and No. 2 • Two new waste activated sludge (WAS) pumps in the existing WAS Pump Station Representative pictures showing the construction progress to date are provided. Pic- tures of the same areas taken by a drone in March 2023 and December 2023 show the significant progress made in the project. Attachment A includes a recent construction schedule as prepared by the Design -Builder, Crowder Construction Company. Substan- tial completion is anticipated sometime in October 2024 assuming electrical gear deliv- eries do not incur additional delays. EQ Tank and NEF Reactor Early in 2023, work included site preparation (Picture 1) and construction of the smaller boxes associated with this process area. By the end of 2023, all structures have been completed, including the EQ influent vault, EQ Tank with NEF section at center, EQ efflu- ent vault, Box 101, and NEF diversion box. The EQ Tank and NEF reactor have also been hydrostatically water tested (Pictures 2 and 3). The Design -Builder is currently complet- ing the interconnecting piping; currently working on the 42-inch pipe that connects the existing Box 10 with the new EQ Tank on the influent side. 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 2 Picture 1. EQ T w.� ik site preparation in March 2023. . j Picture 2. EQ Tank outer section being water tested for leaks in December 2023. 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 3 Picture 3. Closeup view of EQ Tank. Aeration Basin No. 6 The concrete work for the new aeration basin along with the underground piping that fills, empties, and drains the tank were completed early 2023 (Picture 4). Next, the De- sign -Builder worked on putting together the overhead aeration air piping that connects the blower building with AB No. 6 (Picture 5). The Design -Builder is currently working on wiring the new instruments that will monitor the biological process and installing the fine bubble membrane diffusers at the bottom of the tank. The fine bubble diffusers evenly distribute throughout the tank the aeration air that is being conveyed by the overhead stainless -steel pipe and supplied by the blowers. To accomplish good mixing and effi- cient oxygen distribution, the fine bubble diffusers must cover almost the entire floor of the tank (Picture 6). The fine bubbles introduced at the bottom of the tank, while travel- ing upwards, provide the oxygen needed by the bacteria to breathe, grow, and multiply. These bacteria use the impurities found in wastewater as their food. 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 4 -- rs r Picture 4. AB No.6 structure (left) and site of new Blower Building (right) in March 2023. j 0'' '�►4 4 � a '1% ` Picture 5. AB No.6 (left) and Blower Building (right) with air piping complete in December 2023. 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 5 ,'r r` �t I Picture 6. Closeup view of AB No.6 showing the diffuser headers installed at the bottom of the tank. The actual diffusers are currently covered to protect them from sunlight. New Blower Building The new pre-engineered metal Blower Building has been erected (Pictures 5 and 7).The Design -Builder is currently installing wiring and electrical gear inside the electrical room of the building. The new blowers that were manufactured and factory -tested in Finland are currently in storage locally, awaiting completion of the building to be moved inside. 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 6 Picture 7. Closeup view of the Blower Building. New Final Effluent Parshall Flume and Chlorine Contact Basins The new final effluent Parshall flume structure is essentially complete (Pictures 8 and 9). The new flume can measure flows up to 90 MGD, whereas the old flume could only measure up to 67 MGD. The Design -Builder is completing other work around the plant while planning to place the new final effluent Parshall flume online early 2024. Placing this structure online requires a partial plant shutdown and bypass pumping. The plan is to use the newly constructed EQ tank along with a few additional drained tanks such as a primary clarifier, an aeration treatment train, and a secondary clarifier to store the in- coming wastewater while the Design -Builder completes the tie-in of the new final efflu- ent Parshall flume on its inlet side. The tie-in on its outlet side has been completed. Raising of the walls of the two chlorine contact chambers is complete (Pictures 8 and 9). 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 7 Picture S. 72-inch final effluent line "doghoused" by part of the new Parshall flume structure (bottom). Note the formwork for raising the walls in CCB No.2 (top). Picture taken in March 2023. 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion Ori Tuvia NC DEQ December 19, 2023 Page 8 - •g a Picture 9. New Parshall flume structure complete, awaiting a shutdown to be placed online by cutting and removing the piece of 72-inch effluent pipe intercepting it on the inlet side. Note the raised walls of CCBs. Picture taken in December 2023. Should you have any questions, please do not hesitate to call me at 407.409.5152 or by email at ganipsitakis@brwncald.com. Very truly yours, Brown and Caldwell George Anipsitakis, PhD, PE Managing Principal Charlotte, NC Attachments: • Attachment A: Construction Schedule 2023 Construction Progress Rpt for RRRWWTP Ph.3 Expansion CROWDER CONSTRUCTION TASK ID TASK WORK START DATE FINISH DATE DAYS vIDecl Jan Febj Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug se Rocky River WWTP 1200 ; Commissioning @ PhE 1140 Substantial Completion Bypass Pumping Plan Submit /Approve;- Flume'103 GravijyThickaners Fabrication; LIS Fabrication MCC's Fabrication - Blowef Building MCC's Fabrication - EQ Tank (E House) Substation Fabrication #3 & #J4 Radar Level Transmitler Fabrication Local Control Stations Fabrication DO; Sensory Fabrication Nitrate / Nitrite Sensor Fabrication Fiber Optic:Network'Cable Fabrication PLC Cabinets Fabrication,(WAS, Chem) C6mbustible Gas Detector Fabrication PLC Cabinets Fabrication ($lower, �Q, Thickened Sludge) 7180 Arpmonia Sensor �abricatioo *ALAP* 717D PH Sensor: Fabrication *ALAP* se 3 Capacity Upgrades @ Phase 3 Capacity Upgrades 1270 : ♦ Final Co 10432 j ♦ Prinjary Phase 3 "ones 1200 Commissioning @ Phase 3 Capacity Upgrades 20 09-Sep-24 04-Oct-24 1140 Substantial Completion @ Phase 3 Capacity Upgrades 0 04-Oct-24* 1270 Final Completion 0 08-Aug-25 10432 Primary Clarifier Rehab Complete 0 08-Aug-25 Procurement Bypass Pumping 10042 Bypass Pumping Plan Submit /Approve - Flume 103 163 05-Jun-23A 31-Jan-24 Gravity Thickeners 2720 Gravity Thickeners Fabrication 173 24-Apr-23A 04-Jan-24 LIS 6390 LIS Fabrication 201 05-Apr-23A 19-Jan-24 MCC 6450 MCC's Fabrication - Blower Building 245 02-Feb-23A 19-Jan-24 9892 MCC's Fabrication - EQ Tank (E House) 280 02-Feb-23 A 08-Mar-24 Substation 10607 Substation Fabrication #3 & #4 328 29-Aug-22A 13-Dec-23 Instrumentation 7220 Radar Level Transmitter Fabrication 108 05-Jul-23A 06-Dec-23 7250 Local Control Stations Fabrication 116 OrJul-23A 18-Dec-23 7130 DO Sensors Fabrication 129 05-Jul-23A 12-Jan-24 7190 Nitrate / Nitrite Sensor Fabrication 129 OSJul-23A 12-Janr24 6790 Fiber Optic Network Cable Fabrication 129 05-Jul-23A 12-Jan-24 10442 PLC Cabinets Fabrication (WAS, Chem) 139 05-Jul-23A 22-Jan-24 7180 Combustible Gas Detector Fabrication 156 05-Jul-23A 14-Feb-24 7200 PLC Cabinets Fabrication (Blower, EQ, Thickened Sludge) 158 OSJul-23A 16-Feb-24 7160 Ammonia Sensor Fabrication *ALAP* 40 17-May-24 15-Jul-24 7170 PH Sensor Fabrication *ALAP* 40 17-May-24 15-Jul-24 Mixers Mixers Fabricatiop - EQ Tank Handrail Fabrication @ Balance Metal Staifs Fabrication @AB6 Metal Stairs Fabrication @:Balance 961� ■ q'sBuilt G;ravityThickener j 96� 2 Odor Balance of liuctbank 101 to NEF Underslab ntrol Cover Fabrication:- Gravity Thickeners 9922 Mixers Fabrication - EQ Tank 273 28-Nov-22A 22-Dec-23 Handrail 10112 Handrail Fabrication @ Balance 50 04-Dec-23A 19-Feb-24 Metal Stairs 6760 Metal Stairs Fabrication @AB6 49 09-Oct-23A 18-Dec-23 2 2111111 9952 Metal Stairs Fabrication @ Balance 50 04-Dec-23A 19-Feb-24 Odor Control Covers 9612 AsBulk Gravity Thickener 5 12-Mar-24 18-Mar-24 9622 Odor Control Cover Fabrication - Gravity Thickeners 180 19-Mar-24 02-Dec-24 Sit 10542 Balance of Ductbank 101 to NE Underslab 5 05-Dec-23A 11-Dec-23 VERSION 07-Dec-23 DATA DATE: 06-Dec-23 ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 PAGE 1 OF 7 RR-20 (12-6-23) CROWDER CONSTRUCTION III 1980 Ductbank - Site Lighting 21 Ductbank 102 - TSPS (West) 20 16-Feb-24 15-Mar-24 8812 19-Feb-24 15-Mar-24 2140 Fine Grading 22 11-Mar-24 09-Apr-24 3390 Sidewalks 18 10-Apr-24 03-May-24 2160 Asphalt Paving 22 24-Apr-24 23-May-24 2130 Final Seeding 10 14-Mar-25 27-Mar-25 Yard PipirI 3640 42" IRS Box 10 to Influent MV 50 13-Nov-23A 31-Jan-24 3680 4" / 6" PW Balance 10 06-Dec-23 10-Dec-23 3670 4" Tank Drain - EQ Tank to 24" Tank Drain 3 20-Dec-23 22-Dec-23 3690 10" WAS at WAS PS 6 02-Jan-24 09-Jan-24 10492 8" WAS from Exsting to MH 5 10 10-Jan-24 23-Jan-24 3850 4" DI near Box 10 2 11-Jan-24 12-Jan-24 3800 6" Scum at GT 3A 6 19-Feb-24 25-Feb-24 3810 6" PS to GT 314 7 27-Feb-24 06-Mar-24 3790 6" / 8" TD GT 3/4 16 07-Mar-24 28-Mar-24 3770 8" WAS from Existing to GT 314 10 29-Mar-24 11-Apr-24 3590 12" Storm / Trench Drain 10 10-Apr-24 23-Apr-24 3780 4in/6in TS 14 02-May-24 21-May-24 3820 18in FA GT 3/4 to Ex 2 22-May-24 23-May-24 4250 42" MI -Tie In 3 04-Sep-24 06-Sep-24 Aeration Basin No. 6 & Box 2A Equipment/ Testing /Stattup 6330 Pull Power & Control to Equipment & Instrumentation @AB 6 36 03-Nov-23A 03-Jan-24 4390 Instrumentation @AB 6 25 16-Nov-23A 22-Dec-23 6490 Field Terminations - Equipment & Instrumentation @ AB6 25 29-Nov-23A 10-Jan-24 6470 Complete Electrical R/1 to Equipment & Instrumentation @AB6 10 11-Dec-23* 22-Dec-23 4410 Metal Stairs @AB 6 5 19-Dec-231 02-Jan-24 6340 Prep for Startup / Checkout @ AB6 4330 Rubber Diffusers / Testing @ AB6 1670 Checkout / Startup / Testing @ AB6 1400 I Raise Box Elevation 8' @ Box 8 1430 Flow EQ Tank 5420 Misc Metals @ Box 8 No. 1 / NEF� Complete Leak Test / Drain NEF Tank 4600 Electrical R/I to JB @ EQ Tank 4590 DI Piping @ EQ Tank 4560 Air Piping - Bridge @ EQ Tank 1780 Instrumentation @ EQ Tank 4580 Diffusers @ EQ Tank VERSION 07-Dec-23 DATA DATE: 06-Dec-23 27 15-Jan24 20-Feb-24 5 23-JuF24 29-Jul-24 30 23-JuQ4 03-Sep-24 15 04-Dec-23A I 22-Dec-23 5 20-Feb-24 25-Feb-24 1980 Ductbank Site Lighting 8812 Ductbank 102 - TSOS (West) 2140 FinA Grading 3390', 000 Sidewalks 2160 MOM Asphalt Paving 42" RS Box 10,to Influent MV j 4" / 6" PW Balance 1 4" Tank Drain - EQ Tank to 24" Tank Drain 690 ■ 10" WAS at WAS PS 10492 g" WAS!from Existing to I$4H 5 3850 1 4" 0I near f ox 10 3860 6" Scum at GT 3/4 3810 E 6" PS to GT 314 3790 6" 18" TD GT 3/4 6770 00 8" VAS frorj Epstirjg to GT: /4 3590 ;12" Storm / Trench Drain 3780 ! 4in/6in TS 3820 1 18in FA GT 3/4 to' E x 4250 1 42" MLTie In: Pull Power & Control tv Equipnjent & Instrumentation @ AB 6 4=Completd rumentation @AB 6 Field Terminations - Equipmeht & Instrumentation @ AB6 70' Electridal R/I to Equipment & Instrumentation @AB6 441 Metal Stairs @AB 6 6340 Prep for Startup / Checkout @AB6 4330 ■ Rubber. Diffusers / Testing @ AB6 1670 MMENi Checkout / Startup / Testing @ Raise Box Elevation 8' @ Box 8 1430 ■ : Misc Metals @ Box8 28 06 Nov-23A 15 Dec-23 15-Dec-23 08-Jan-24 0 560 17 Complete Leak Test /Drain MEF Tank Electrical f l to JB @ EQ 1ank DI Piping @ jEQ Tank ■ Air Piping;- Bridge;@ EQ Tank Instrumentation @ EQ Tank 580 Diffusers @; EQ Tank 15 27-Nov-23A 20 04-Dec-23A 5 13-Dec-23 10-Dec-23 10 18-Dec-23 08-Jan-24 7 02-Jan 10-Jan-24 ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 2130 ; Final Seeding PAGE 2OF7 RR-20 (12-6-23) CROWDER CONSTRUCTION 4460 5330 10472 1770 NEFi Submersible Mixers @ EQ Tank 8 Pull & Field Terminate Power & Control from Equipment & Instrumentation to JB 10 02-Jan-24 11-Jan-24 22-Jan-24 60 M Submersible Mixers',@ EQ Tank 5330 Pull &Field Terminate Power & Control from Equipment & Instrumentation to JB 10472 E Stairs @ EQ'Tank 1770 OPMEN" Checkout / Startup / Testing @ Q Tank; 09-Jan24 Stairs @ EQ Tank 5 31-Jan-24 06-Feb-24 Checkout / Startup / Testing @ EQ Tank 30 23-JuF24 03-Sep-24 4660 Grading / Stone / Backfill @ NEF Blower Pad 4720 Underslab Electrical @ NEF Blower Pad 4680 FRP Slab @ NEF Blower Pad 10462 FRP Slab Cure @ NEF Blower Pad 6910 Roughin EQ Tank Electrical Conduit @ NEF Blower Pad 5440 Stainless Air Piping @ NEF Blower Pad 4700 NEF Blowers @ NEF Blower Pad 4740 Set E House @ NEF Blower Pad 10682 Pull & Terminate Fiber - Blower Building PLC to EQ PLC 6890 Roughin Panels @ NEF Blower Pad 7100 Set HVAC Equipment / Commissioning / TAB @ NEF Blower 5280 Pull Wire & Terminate - LV Gear to MCC (NEF E House) 10687 Pull & Field Terminate Power & Control from JB to E House / PLC 6920 Lighting @ NEF Blower Pad 6900 Electrical Instrumentation & Control Stations @ NEF Blower Pad 6880 Blower Bldg 1690 Pull Wire & Terminate @ NEF Blower Pad & Electrical Room HVAC @ Blower Bldg 1700 Stainless Air Distribution Piping - Interior @ Blower Bldg 2390 Housekeeping Pad Pour / Cure - Blower @ Blower Bldg 1620 Blower Installation @ BloiAw Bldg 5090 TAB @ Blower Bldg Electrical & Instrumentation 5250 Pull Wire & Terminate - Substations #1 & #2 to LV Gear 10612 Set Substation #3 & #4 @ Blower Building 10617 Pull Wire & Terminate - Substations #3 & #4 to LV Gear 6 01-Dec-23A 08-Dec-23 I 720 Grading / Stone/ Badkfill @ NEF Blower Pad Underslab Electrical @ NEF Blower Pod 15 12-Dec-23 09-Jan-24 10 10-Jan-24 23-Jan-24 4680 PRP Slab @ NEr Blower, Pad 10462 ■; FRP Slab Cure @ NER Blower Pad 6910 Roughin EQ Tank Electrical Conduit Q NEF Blower Pad 5440 5tainless'Air Pipit @ NEF Blower: Pad 4700 ■j NEF Blowers @ NEF Blower Pad 4740: 1 Se( E House @ NE14 Blower:Pad 10682 1 Pull & Terminate Fiber -Blower Building PLC to EQ PLC 6890 ❑ Roughin Panels @, NEF Blower Pad 7100 ❑ Set HVAC Equipment / Commissioning / TAB @ NEF Blower j 5280 17 Pull Wire & Terminate - LV Gear to MCC (NEF E House) j 10681, 0010 Pull;& Field terminate Power & Control from JB to E House / PLC 6920 ■ Lighting;@ NEF Blower Pad 6900 ■ Electrical Instrurhentatiorl & Control Stations @ NEF Blowet Pad 6880 00 Pull Wire & Terminate @ NEF Blower Pad 7 24-Jan-24 30-Jan-24 15 24-Jan-24 13-Feb-24 10 07-Feb-24 20-Feb-24 5 21-Feb-24 27-Feb-24 2 11-Mar-24 12-Mar-24 1 13-Mar-24 13-Mar-24 5 13-Mar-24 10-Mar-24 5 13-Mar-24 19-Mar-24 10 13-Mar-24 26-Mar-24 20 13-Mar-24 09-Apr-24 5 20-Mar-24 26-Mar-24 6 20-Mar-24 27-Mar-24 10 28-Mar-24 10-Apr-24 47 23-Oct-23A 05-Jan-24 21 27-Nov-23A 02-Jan-24 5 05-Dec-23A 11-Dec-23 5 12-Dec-23 18-Dec-23 5 08-Jan-24 12-Jan-24 28 17-Nov-23A 05-Jan-24 1 14-Dec-23 14-Dec-23 10 15-Dec-23 05-Jan-24 10647 Pull & Terminate Control Wire- Blower MCU to Blower 1 19-Dec-23 19-Dec-23 10657 Pull & Terminate Control Wire - Blowers to Inlet Fitter Pressure Sensors 2 19-Der-23 20-Dec-23 5080 Pull & Terminate - LV Gear to Blowers 1, 2 & 3 3 19-Dec-23 21-Dec-23 5100 Pull Wire & Terminate - LV Gear toAHF 2 08-Jan-24* 09-Jan-24 2920 Pull Control Wire - MCC to PLC 2 08-Jan-24* 09-Jan-24 10652 Install Pressure Units / Pull & Terminate Control Wire - Blower MCU to Pressure Units 2 08-Jar -24* 09-Jan-24 10662 Complete R/I & Pull & Terminate Control Wire - Blower MCU to 24" MOVs 8 08-Jan-24* 17-Jan-24 10637 Pull Control Wire - PLC to Blower MCU 1 10-Jan-24 10-Jan-24 10667 Pull Wire & Terminate - Power PP Panel to 24" MOVs 1 18-Jan24 18-Jan-24 3380 Set MCCs @ Blower Bldg 3 22-Jan-24 24-Jan-24 VERSION 07-Dec-23 DATA DATE: 06-Dec-23 HVA6 @ Blower Bldg, Stainlgss Air Distribution Piping: Interior;@ Bl4r Bldg I Housekeeping Pad Four / Cure - Blower @ Blower Bldg 2Q ■ Blower Installation @ Blower Bldg 5090 ■ TAB @ Blower Bldg: Pull Wire & Terminate,- Substations #1 $ #2 to 4V Gear 02 1 Set Substation #3 & #4 @ Blower Building 317 Pull Wire & Terminate Substations #3 & #4 to LV Gear )641 Pull & Terminate Control Wire - Blower MCU:to Blower )61 1 Pull & Terminate Control Wire - Blowers to 16let Filter Pressure Sensors 50 1 Pull & Terminate � LV Gear to Blowers 1, 24 3 5100 1 Pull.Wire & terminate- LV Gear to AHF 2920 1 Pull Control Wire -MCC to PLC 0652 1 Install Pressure Units ,/ Pull & Terminate Control Wire- Blower MCU to Pressure Units 0662 M Cpmplete:R/I & Pull & Termjinate Control Wire - Blower MCU tq 24" MOVs 10637 1 Pull; ControlWire - PLC to Blower MCW 10667 1 Pull Wire & Terminate -Power PP Panel to 24" MOVs 3380 1 Set MCCs @ Blower Bldg ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 PAGE 3OF7 RR-20 (12-6-23) CROWDER CONSTRUCTION TASK ID TASK WORK DAYS START DATE FINISH DATE v Dec Jan Feb I Mar I Apr I May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 3e 10582 4570 5350 Set LIS @ Blower Building 3 Pull Wire & Terminate - LV Gear to MCCA& B (Blower Bldg) 4 22-Jan-24 24-Jan-24 10582 1 ;Set LIS!@ Blower Building 4570 ■; Pull Wire & Terminate - LV Gearto MCCA & B (Blower Bldg) 5350 ■ Pull Wire & Terminate;- MCC to ATS 10622 1 Terminate - MCC to Exhaust Fans 10627; 1 Terminate -MCC toAnoxic Mixers 10572 ■ pull Wire, & Terminate - PMS to LI$ 25-Jan,24 31-Jan-24 30-Janr24 05-Febr24 Pull Wire & Terminate - MCC to ATS 4 10622 Terminate - MCC to Exhaust Fans 4 06-Feb-24 09-Feb-24 10627 Terminate - MCCtoAnoxicMixers 4 12-Feb-24 15-Feb-24 10572 Pull Wire & Terminate - PMS to LIS 4 16-Feb-24 21-Feb-24 5410 Set PLC @ Blower Building 2 19-Feb-24 20-Feb-24 5410 1 Set PLC @ Blower Building 10592 1 :Pull Wire & Terminate - LV Gear td PLC 6460 1 Pull Fiber from Bower Bldg PLC toAdmin 10t 77 ■ j Pull & Terminatg Controlg - LV Gpar to LIS 10$02 1; Terminate Fiberfrom Blower Bldg PLC toAdmin 10672 Remaining Terminations at MCC 10632 Terminate Control Wire -;MCC to PLC 10642 r Remaining Terminations at PLC' 1710', Electrical: Checkout I Startup / Testing @ Blower 10$97 Mechanical Checkout /Startup / Testing Mechanical / Concrete Demo @ WAS PS QIP Install @ WAS PS 1460 HVAC @: WAS PS 1800 No Pump Install @ WAS PS 6270 j■ FRF! Pads C WAS FS 6500 Complete Electrical R/I @ WAS PS 1940 Electrical / Instrumentation WASPS 1960 ■ Checkout / Startup / Testing @ WAS PS 2030 ■ Odbr Contrbl Cover @ Flow EQ Influent MV I 1790 ■ Electrical/ Instrumentation @ Flow EQ Influent MV 1870 ■ Checkout / Startup / Testing @ Flow EQ Influent MV, 10052 Setup Bypass Pumping System - Flume 103 10062 1 ;Start Bypass Purnping - Oume 1010072 10072 0 Bypass Pumping @ Flume 103 5220 1 ;Demo 72" Pipe Flume;103 5210 11111 Slide Gates @;Flume 103 10082 ♦ Complete Bypass Pumping @ Flume 10$ 2290 : ■ Checkout / Startup / Testing @ Flume 103 7010 Metal, Stairs / �1isc Metals @ GCB1 9632 ■ Odor Control Cover @ Flow �Q Effluent MV Bldg / Electrical Roo(n @glower B;Idg / Electrical Rgom I 10592 Pull Wire & Terminate - LV Gear to PLC 2 21-Feb-24 22-Feb-24 6460 Pull Fiber from Blower Bldg PLC toAdmin 2 21-Feb-24 22-Feb-24 10677 Pull & Terminate Controls - LV Gear to LIS 4 22-Febr24 27-Febr24 10602 Terminate Fiber from Blower Bldg PLC toAdmin 2 23-Feb-24 26-Feb-24 10672 Remaining Terminations at MCC 10 28-Febr24 12-Mar-24 10632 Terminate Control Wire - MCC to PLC 10 13-Mar-24 26-Mar-24 10642 Remaining Terminations at PLC 5 27-Mar-24 02-Apr-24 1710 Electrical Checkout / Startup / Testing @ Blower Bldg / Electrical Room 10 09-JuQ4 22-Jul-24 10697 WAS Pump 1440 Mechanical Checkout / Startup / Testing @ Blower Bldg / Electrical Room 20 23-Juu24 19-Aug-24 Station Mechanical / Concrete Demo @ WAS PS 84 81 11-Sep-23 A 18-Sep-23A 16-Janr24 18-Jan-24 1950 DIP Install @ WAS PS 1460 HVAC @ WAS PS 10 08-Janr24 19-Janr24 1800 Pump Install @ WAS PS 10 19-Jan-24 01-Feb-24 6270 FRP Pads @ WAS PS 4 02-Feb-24 07-Feb-24 6500 Complete Electrical R/I @ WAS PS 10 02-Feb-24 15-Feb-24 1940 Electrical / Instrumentation @ WAS PS 20 5 16-Febr24 15-Mar-24 14-Mar-24 21-Mar-24 1960 —how EQ Influent 2030 i Checkout / Startup / Testing @ WAS PS Meter 1/aul Odor Control Cover @ Flow EQ Influent MV 5 5 08-Janr24* 10-Jarr24 12-Janr24 16-Jan-24 1790 Electrical / Instrumentation @ Flow EQ Influent MV 1870 Checkout / Startup / Testing @ Flow EQ Influent MV 5 15-Mar-24 21-Mar-24 Flume 1 10052 Setup Bypass Pumping System - Flume 103 15 01-Feb-24 21-Feb-24 10062 Start Bypass Pumping - Flume 103 1 22-Feb-24 22-Feb-24 Bypass Pumping @ Flume 103 7 22-Feb-24 01-Mar-24 5220 Demo 72" Pipe @ Flume 103 1 23-Febr24 23-Febr24 5210 Slide Gates @ Flume 103 5 26-Feb-24 01-Mar-24 10082 Complete Bypass Pumping @ Flume 103 0 01-Mar-24 2290 Checkout / Startup / Testing @ Flume 103 5 04-Mar-24 08-Mar-24 7010 Flow EQ Effluent 9632 Metal Stairs / Misc Metals @ CCB1 10 20 Fetr24 04 Mar-24 Meter 1 /aul Odor Control Cover @ Flow EQ Effluent MV 5 08-Jan-24 12-Jan-24 VERSION 07-Dec-23 DATA DATE: 06-Dec-23 ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 PAGE 4 OF 7 RR-20 (12-6-23) CROWDER CONSTRUCTION TASK ID TASK WORK DAYS START DATE FINISH DATE 1v Dec an Feb I Mar I Apr May Jun Jul Aug Sep Oct Nov Dec an Feb Mar Apr May Jun Jul Aug 13ec 1910 Electrical / Instrumentation @ Flow EQ Effluent MV 5 1930 Checkout / Startup / Testing @ Flow EQ Effluent MV 5 4530 Demo FRP Plates / Install Weirs @ Box 2A 1 MaintenanEML 4970 Electrical Roughin / Lights @ Maintenance Canopy 57 Gravity Thickener 3940 FRP Walls @ Gravity Thickener 3 32 13-Mar-24 19-Mar-24 1910 ■ Electrical I Instrum,entation,@ Flow EQ Effluent MV 1930 ■ I Checkout / Startup / Testing @ Flow EQ E 4530 ;1 Demo FRP Plates / Install Weirs Electrical:RoughinJ Lights @ Maintenance Canopy FRP Walls @:GravitylThickener 3 ;FRP W�Ils @ Gravity Thickener 4; 5510 Prep /Fill Leak Test @ Gravity Thickener 3 ffluent MV @ Boxi2A 23-Jul-24 29-Jul-24 03Sep-24 03Sep-24 23-Oct-23A 19-Jan-24 20-Oct-23A 06-Dec-23 7020 FRP Walls @ Gravity Thickener 4 30 07-Dec-23 25-Jan-24 5510 Prep /Fill Leak Test @Gravity Thickener 3 15 08 Jan 24* 26 Jan 24 5400 Leak Test Structure @ Gravity Thickener 3 5 29-Jan-24 02-Feb-24 207 5400 w Leak Test Structure @!Gravity thickeneF 3 7030 J Leak -test Structure @:Gravity thickener 4 5430 Backfill @! Gravity Thickeners 3 & 4: 5520 ;Patch/RUb Walls'@ GravltyThick�ner 3 7040 Patch/Rub Walls@ GravityThickener 4 54$0 ■ :FRP Stair Landings @ Grpvity Thickeners $ & 4 450 � Misc Metals @ Gratiity Thickeners 3,& 4 5550 � Proce s Equipment Install @ GravityThickeners 3 & 4 2050 ; Electrical / Instrumentation @ Gravity Thickeners 3:& 4 5560 � Eiq�osed Mechanical Piping;@ Gravity Thickener 3 & 4 5530; 1 Svyeep Meth Grout;@ Gravjty Thick 2240 Excavation / Stone / Und6rslab aL7 Thickened Sludge PS 2090 * FRP Base Slab @ Thickened Sludge PS 2100 : � FRP W�Ils @ Tl ickened!Sludge PS t110 Suspended Slab / concrete, Beams @ Thickened Slu lge PS 5980 � Backfill @ Thickened Sludge PS 6060 N FRP:Stair Landings @ Thickened Sludge PS 2150 i M.Asonrya@ Thickened Sludge PS 6160 : � Misc:Metals Q Thickened Sludge PS 2180 � Roof Joist & Decking / Roofing @ Thickened Sludge 2190 Pump,/ Pad Install @ Thickened Sludge ner 3 & 4 Odor (,ontrol Dover Install @ Gravity Thipkeners g & 4 2060 Checkout /Startup /;Testing Gravity Thickeners 2380 'Commissioning Q Gravitj Thickeners PS S 7030 Leak Test Structure @ Gravity Thickener 4 5 29-Jan-24 02-Feb-24 5430 Backfill @ Gravity Thickeners 3 & 4 10 OSFeb 24 16 Feb 24 5520 Patch/Rub Walls @ GravityThickener 3 15 05-Feb-24 23-Feb-24 7040 Patch/Rub Walls @ GravityThickener 4 15 OSFeb-24 23-Feb-24 5490 FRP Stair Landings @ Gravity Thickeners 3 & 4 4 19-Feb-24 22-Feb-24 3950 Misc Metals @ Gravity Thickeners 3 & 4 15 23-Feb-24 14-Mar-24 5550 Process Equipment Install @ Gravity Thickeners 3 & 4 30 26-Feb-24 05-Apr-24 2050 Electrical / Instrumentation @ Gravity Thickeners 3 & 4 30 15-Mar-24 25-Apr-24 5560 Exposed Mechanical Piping @ Gravity Thickener 3 & 4 30 08-Apr-24 17-May-24 5530 Sweep Mech Grout @ Gravity Thickener 3 & 4 2 12-Aug-24 13-Aug-24 2240 Odor Control Cover Install @ Gravity Thickeners 3 & 4 40 03-Dec-24 30-Jan-25 2060 Checkout / Startup / Testing @ Gravity Thickeners 3 & 4 30 31-Jan-25 13-Mar-25 2380 T ► �ened 2070 Commissioning @ Gravity Thickeners 3 & 4 30 14-Mar-25 24-Apr-25 Sludge Pump Station Excavation / Stone / Underslab @ Thickened Sludge PS 24 18-Dec-23* 26-Jan-24 2090 FRP Base Slab @ Thickened Sludge PS 8 29-Jarr24 07-Feb-24 2100 FRP Walls @ Thickened Sludge PS 35 08-Feb-24 27-Mar-24 2110 Suspended Slab / Concrete Beams @ Thickened Sludge PS 15 28-Mar-24 17-Apr-24 5980 Backfill @ Thickened Sludge PS 10 18-Apr-24 01-May-24 6060 FRP Stair Landings @ Thickened Sludge PS 3 02-May-24 06-May-24 2150 Masonry @ Thickened Sludge PS 30 02-May-24 13-Jun-24 6160 Misc Metals @ Thickened Sludge PS 20 07-May-24 04-Jun-24 2180 Roof Joist & Decking / Roofing @ Thickened Sludge PS 20 14-Jun-24 12-Jul-24 2190 Pump / Pad Install @ Thickened Sludge PS 15 15-Ju1-24 02-Aug-24 2210 Electrical / Instrumentation @ Thickened Sludge PS 20 15-Jul-24 09-Aug-24 2210 Eledtrical / Instrumentation @',Thicken 2200 DIP Install @ Thickened SI 61$0 ■ Doors & Hardwa'te @ Thi 2220 06 Checkout / Startup / Testing Sludgy PS Age PS' kened Sludge PS @ Thickened Sludgy PS 2370 (Commissioning @ Thickened Sludge 2200 DIP Install @ Thickened Sludge PS 33 OSAug-24 10-Sep-24 6180 Doors & Hardware @ Thickened Sludge PS 3 20-Sep-24 24-Sep-24 2220 Checkout / Startup / Testing @ Thickened Sludge PS 10 20-Sep-24 03Oct-24 2370 Commissioning @ Thickened Sludge PS Primary Clarifiers 30 14-Mar-25 24-Apr-25 VERSION 07-Dec-23 DATA DATE: 06-Dec-23 ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 PAGE 5 OF 7 RR-20 (12-6-23) CROWDER CONSTRUCTION 1st Clarifier 5130 Clean / Prep for Painter @ PC (1st Clarifier) 5 15-Jan-24* 19-Jan-24 5450 Shoring @ PC (1st Clarifier) 10 22-Jan-24 02-Feb-24 5140 Remove Bridge / Drive @ PC (1st Clarifier) 12 05-Febr24 20-Feb24 5150 Retrofit Drive Install @ PC (1st Clarifier) 3 21-Feb24 23-Feb24 5170 Reinstall Bridge @ PC (1st Clarifier) 10 26-Febr24 08-Mar-24 5460 Remove Shoring @ PC (1st Clarifier) 5 11-Mar-24 15-Mar-24 5160 Paint / Coatings @ PC (1st Clarifier) 45 18-Mar-24 17-May-24 5180 Electrical for New Drive @ PC (1st Clarifier) 5190 Startup / Checkout / Testing @ PC (1st Clarifier) 2nd Clarifier 10222 Clean / Prep for Painter @ PC (2nd Clarifier) 10707 Shoring @ PC (2nd Clarifier) 10232 Remove Bridge / Drive @ PC (2nd Clarifier) 10242 Retrofit Drive Install @ PC (2nd Clarifier) 10252 Reinstall Bridge @ PC (2nd Clarifier) 10717 Remove Shoring @ PC (2nd Clarifier) 10262 Paint / Coatings @ PC (2nd Clarifier) 10272 Electrical for New Drive @ PC (2nd Clarifier) 10282 Startup / Checkout / Testing @ PC (2nd Clarifier) 31d Clarifier 10292 Clean / Prep for Painter @ PC (3rd Clarifier) 10727 Shoring @ PC (3rd Clarifier) 10302 Remove Bridge / Drive @ PC (3rd Clarifier) 10312 Retrofit Drive Install @ PC (3rd Clarifier) 10322 Reinstall Bridge @ PC (3rd Clarifier) 10737 Remove Shoring @ PC (3rd Clarifier) 10332 Paint / Coatings @ PC (3rd Clarifier) 10342 Electrical for New Drive @ PC (3rd Clarifier) 10352 Startup / Checkout / Testing @ PC (3rd Clarifier) 4th Clarifier 10362 Clean / Prep for Painter @ PC (4th Clarifier) 10747 Shoring @ PC (4th Clarifier) 10372 Remove Bridge / Drive @ PC (4th Clarifier) 10382 Retrofit Drive Install @ PC (4th Clarifier) 10392 Reinstall Bridge @ PC (4th Clarifier) 10757 Remove Shoring @ PC (4th Clarifier) 10402 Paint / Coatings @ PC (4th Clarifier) 10412 Electrical for New Drive @ PC (4th Clarifier) 10422 Startup / Checkout / Testing @ PC (4th Clarifier) VERSION 07-Dec-23 DATA DATE: 06-Dec-23 5 20-M ay-24 I 24-M ay-24 5 28-May-24 03-Jun-24 5130 ■ Clean / Ptep for Painter @;PC (1st Clarifier); 5450 El Shoring @ PC (1st Clarfier) 5140 ! M Remove Bridge / prive @ PC (1st ;Clarifier)', 51l50 I RetroR Drive Ins)all @ Pt; (1st Clarifier) 6170 1111111 Reinstall Bridge @ PC (1st Clarfier) 5460; ■ Remove Shoring @, PC (1st Clarifier) 5160 NONEENOPM Paint / Coatings @',PC (1st Clarfier)' 51$0 ■ electrical for Nevi Drive aL1 PC (1st Clarifier) $190 111111 Startup/ Checkout / Testing @ PC (1st 0arfier) 5 04-Jun-24 10-Jun-24 110222 I ■ Clean / Prep', for Painter @ PC (2nd Clarifier) ' 10707! 1111110 !Shoring ;@ PC (?nd Clarifier) 10232 MiNE Remove Bridge/ Drive @ PC (2nd Clarifier) 10242 ■ Retrofit Drive Install @ PC (2nd Clarifier) 10262 1111110' Reinstall Bridge, @ PC (2nd Clarifier) 10717 0 Remove Shoring @ PC (2nd Clarifier) 10262 MENIONEEMOR Pairjt / Coatings @ P 10272 ❑ Electrical fpr New 10282 ■ Startup /' Checko 10Z92 ■! Clean /; Prep for 10727 WE Shoring @ 10302 Remc 110312 I Retr 10322 11111110 Reinstall 10737 ■ 10332 (2nd Clarifier) rive @ PC (2nd:Clarifier): t / Testing @ PC (2nd Clarifier) Painter @ PC ($rd Clarifier) DC (3rd Clarifierj ve Bridge / Drive @ PC (3rd Clarifier) ffi Drive Install (0 PC (3rtl Clarifier) Bridge @ PC (3rd Clarifier) Remove Shoring @ PCy (3rd Cler'fiier) MONENWOMIN Paint;/ Coatings @ PG` (3rd Clarifier) ;10342 ! ■ Electrical for New Drive @ PC (3rd Clarifier) 10352 ■ Startup / Checkout. / Testing @ PC (3rd Clarifier) 10 11-Jun-24 24-Jun-24 12 25-Jun-24 11-Jul-24 3 12-Jul24 16-Jul-24 10 17-Jul24 30-Jul-24 5 31-Jul24 06-Aug-24 45 07-Aug-24 09-Oct-24 5 10-Oct-24 16-Oct-24 5 17-Oct-24 23-Oct-24 5 24-Oct-24 30-Oct-24 10 31-Oct-24 13-Nov-24 12 14-Nov-24 03-Dec-24 3 04 Deo-24 06 Dec-24 10 09-Dec-24 20-Dec-24 5 23-Dec-24 31-Dec-24 45 02-Jan-25 05-Mar-25 5 06-Mar-25 12-Mar-25 5 13-Mar-25 19-Mar-25 5 20-Mar-25 26-Mar-25 103$2 ■ ! Clean / Prep for painter PC (4th Clarifier) 10747 1111110 Sharing @ PC (4th Clarifier) 10372 'Remove Bridge /Drive @ PC (4th Cla 10382 I, Retrofit Drive Install @ PC (4th Clarifi j0392 00 Reinstall Bridge @ PC (4th Cylarfi 1075� ❑ Remove shoring (6 PC (4th CI 10402 ;Paint / Coati 10412 0 Electrical f ! 10422 ! ■ Startup / 10 27-Mar-25 09-Apr-25 12 10-Apr-25 25-Apr-25 3 28-Apr-25 30-Apr-25 10 01-May-25 14-May-25 5 15-Ma�,25 21-May-25 45 22-May 25 25 Jul-25 5 28-Jul25 01-Aug-25 5 04-Aug-25 08-Aug-25 ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 PAGE 6OF7 RR-20 (12-6-23) CROWDER CONSTRUCTION 3070 1 Substantial Completion @ Electrical Upgrades 0 1 1 06 Sep-24* 3460 MV Switchgear Fabrication 466 31-May-22A 29-Mar-24 Pad Mounted Transformers 2840 Pad Mounted Transformers Fabrication 469 13-Apr-22A 22-Feb-24 3320 Generator Transformer Fabrication 326 22-Sep-22A 11-Jan-24 2300 Swap Generator Transformer from Temporary to Permanent Equipment / Wire / TeirminaddiLl 3010 Testing Plant Loops 1 12-Jan-24 12-Jan-24 78 01-Sep-23A 22-Dec-23 2950 Set, Pull Wire & Terminate MV Switchgear 35 30-Mar-24 09-May-24 5470 Caterpillar / Concord Power Coordination & Syncing 10 10-May-24 23-May-24 5480 Breaker Settings / Commissioning / Startup 15 24-May-24 14-Jun-24 3060 Demolition 60 13-Jurr24 06-Sep-24 5500 Energize Blower Building (Includes New Generator) 15 17-Jun-24 08-Jul-24 Crew #1 3030 PMS-9-RASto TX-T4 (Crew #1) 6 17-Jun-24 24-Jun-24 4701 PMS-9-RASto TX-T5 (Crew #1) 6 25-Jun-24 02-Jul-24 5540 PMS-9-ADMIN to TX-T1 (Crew#1) 6 03-Jul24 11-Jul24 5570 PMS-9-ADMIN to TX-TC (Crew #1) 6 12-Jul24 19,Jul-24 i 5580 PMS-11-MPS-A to TX-6A (Crew#1) 12 22-Jul24 06-Aug-24 5590 PMS-9-MPS-Bto TX-6B (Crew #1) 12 07-Aug-24 22-Aug-24 Crew #2 5610 PMS-9-PSto TX-T3A (Crew #2) 6 17-Jun-24 24-Jun-24 5620 PMS-9-PS to TX-T3B (Crew #2) 6 25-Jun-24 02-Jul-24 5630 PMS-11-TSP to TX-TE (Crew #2) 6 03-Jul24 11-Jul-24 5640 PMS-9-DWTto TX-T2 (Crew #2) 6 12-Jul24 19-Jul-24 5650 PMS-9-DW7to TX-T9 (Crew #2) 6 22-Jul24 29-Jul-24 5660 PMS-9-CHEMto TX-T8A (Crew #2) 6 30-Jul24 06-Aug-24 5600 PMS-9-CHEMto TX-TD (Crew #2) 6 07-Aug-24 14-Aug-24 VERSION 07-Dec-23 DATA DATE: 06-Dec-23 3070 ; ♦ Substantial Completion @ MV S*chgear,Fabrica(ion - ;Pad Mounted Trdnsformets Fabrication Generator Transformer Fabrication 2300 1 Swpp Generator Transformed from Tomporary to Permanent j ■ Testing Plant Loops 2950 MENEM Set,: Pull Wirr & Terminate MV Switchgear 5470: = Caterpillar / Concord Power Coordination & Syncing 5480 Breaker Settings / Commissioning / Startup 3060 Demolition 5500 111111111IIN Energize Bloyver Building (Includes New ROCKY RIVER WWTP PROJECT SCHEDULE 06-Dec-23 3030 ■ .PMS-9-RAS to TX-T4 (Crew #1) 4701 No PMS-9-RAS td TX-T5 (Crew#1) :5540 jM PM';S-9-ADN4lNto1'X-T1 (Crew#1) 5570 ■ PMS-9-AaMINto1X-TC(Grew#1) 5580 M PMS-11-MPS-A to TX-6A(Crew #1) 5590 M PMS-9-MPS-B tb TX-6B {Crew 0 5610 ■ ;PMS-9-PS to TX-T3A (Crew #2) 5620 E PMS-O-PS to TX-T3B (Crew #2) 5630 ;M PM: S-11-TSP to TX TE (Crew #2) 5640 ■ PMS-9-DWT to TX-T2 (Crew #2) ' 5C50 ■'; PMS-9-DWT to TX-T9 (Crew #2) :5660 1111111 PMS-9-CHEMto TX-Y8A(crew #2) 5600 ■ PMS-9-CHEMto TX-TD (Crew #2) Upgrades PAGE 7OF7 RR-20 (12-6-23)