LETTER OF APPROVAL
ATTN: A. Sydes Construction, Inc.
The Vineyards—Future Tract
PO Box 7122
100 Carolina Plantation Blvd.
Jacksonville,NC 28546
RE: The Vineyards-Future Tract
Project ID: 23-150000005
County: Onslow
City: City of Jacksonville
Address: Gum Branch Road. Jacksonville NC 28540
River Basin: White Oak
Stream Classification:NSW
Submitted By: Kimberly Whaley Tidewater Associated
Total tract 113.4 acres; Disturbed 89.5 acres
Date plans Received by: June 27,2023
Date Fee Received by: June 27, 2023
Date Comments for Disapproval mailed July 13, 2023
Resubmittal:November 14 &December 12,2023
Dear Mr. Sydes,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three(3)years following the date of approval, if no land-disturbing activity has
been undertaken, as is required by
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice
of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the
applicable annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form and fee details may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh
central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a
new COC. :"
Letter of Approval
Mr. Anthony Sydes
December 15, 2023
Page 2 of 2
Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by of our right of periodic inspection to insure
compliance with the approved plan.
' Pollution Control Act isperformance-oriented, requiring protection of
North Carolina's Sedimentation o q g
existing natural resources and adjoining properties. If,following the commencement of this project,the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval. We need to
advise you to proceed with caution in the protected wetland and stream areas, no impacts,not even
temporary ones, are allowed to the wetlands or Poplar stream until the wetland delineation has been updated
(it is currently out of date as of 2008) and approved and all stream crossing and wetland impacts have been
permitted.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Pat Donovan-Brandenburg
Stormwater Manager
City of Jacksonville
Enclosures:Certificate of Approval