HomeMy WebLinkAboutNCC212557_NOT Closeout Documents_20240104 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
County: Johnston Project: WSBP Infrastructure River basin: Neuse
Person financially responsible:Samet Corporation-Brian Hall Project#: JOHNS-2021-036
Address: 309 Gallimore Dairy Road Suite 102,Greensboro,NC
1. Project Location: W Market Street(US Bus 70),Smithfield
Pictures: No
2. Weather and soil conditions: Sunny,dry,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: July 14,2023
9. Corrective action needed:
10. Comments:
Reported by: Lauren Garcia Others present:
Date of inspection: July 14,2023 Time arriving on site: 8:30 AM Time leaving site: 8:45 AM
cc: